| 1 | Physical inspection of the site & Checking of EB connection, assessing the activities required for dismantling and shifting the Electromechanical Equipment and accessories etc. as required. |
| 2 | Sites within a distance of 50Kms from BA HQ office |
| 3 | Sites within a distance of more than 50Kms and up to 100 Kms from BA HQ office |
| 4 | Sites within a distance of more than 100Kms and up to 150 Kms from BA HQ office |
| 5 | Sites within a distance of more than 150 Kms and up to 200Kms from BA HQ office |
| 6 | Disconnection of power supply cables of EB / DG at feeder panel, DG set panel, Electrical Distribution Panel and from MCBDBs and disconnection of earth strips/wires etc. complete as required. |
| 7 | Dismantling and removing the following Electrical equipment and accessories etc. i/c clearing the site, making good the damages, cleaning and shifting all the materials up to the transportation vehicle or to the storage location of the same / nearby building etc. as required. |
| 8 | Meter box / Feeder panel, TPN /SDFU, MCBDBs, AC starter boxes, Fans, Fittings, cables, conduits along with all accessories and Service connection cables etc. complete as required. (BTS sites) |
| 9 | Electrical Power distribution panel, Power plant power supply panel/MCBDB, Meter box / Feeder panel, TPN /SDFU, MCBDBs, AC starter boxes, Fans, Fittings, cables, conduits along with all accessories and Service connection cables etc. complete as required. (TE/TE-Cum-BTS) |
| 10 | Dismantling and removing the AVR and AVR by pass panel including dismantling all power cables etc. and shifting all the materials up to the transportation vehicle or to the storage location of the same / nearby building etc. as required. |
| 11 | Dismantling the Split AC units along with its all accessories i.e. indoor unit, outdoor unit, Refrigerant pipes, interconnection cables etc. as required and shifting all the materials up to the transportation vehicle or to the storage location of the same / nearby building etc. as required. |
| 12 | Removing the 1.5TR WAC units along with outer housing & its supporting structures from its positions after disconnection of power supply and shifting all the materials up to the transportation vehicle or to the storage location of the same / nearby building etc. as required. |
| 13 | Transportation of the dismantled electrical equipment&accessories such as Electrical power distribution panels, MCBDBs, cables, conduits, fans, fittings, meter box/feeder panel, earth materials, Split AC / Window ACunits (up to 04nos), AVR and AVR by-pass panel (up to 48KVA) etc. from theTelephone Exchange/BTS sitesto the Electrical store as per the direction ofEngineer - In- Charge for the following distances by suitable transporting medium i/cloadingat sending end and unloading at receiving endetc. as required. |
| 14 | Sites within a distance of up to 50 Kms from BA HQ office |
| 15 | Sites within a distance of more than 50Kms and up to 100 Kms from BA HQ office |
| 16 | Sites within a distance of more than 100 Kms and up to 150Kms from BA HQ office |
| 17 | Sites within a distance of more than 150 Kms and up to 200Kms from BA HQ office |
| 18 | Dismantling the control panel, fuel tank, exhaust pipes, fuel pipes, connecting cables and other accessories of the 15/30KVA conventional DG set etc. complete as required. |
| 19 | Removing the 15/30KVA conventional DG set along with accessories from the engine/store room to the vehicle loading point by engagement of labour, tools & plant etc. complete as required. |
| 20 | Loading of 15/30KVA conventional/canopy type DG set at on hired vehicle at Telephone exchange / Mobile BTS sites by engagement of hydra/labour with required tools & tackles and unloading the same DG set by the same manner at the location and stacking at the desired location as per the direction of Engineer-in charge etc. complete as required. |
| 21 | Transportation of 15/30 KVA conventional/canopy type DG set at on suitable hired vehicle by road from Telephone Exchange/BTS sites for the followingdistances i/c escorting etc. as per the direction of Engineer-in charge etc. complete as required. |
| 22 | Sites within a distance of up to 50 Kms from BA HQ office |
| 23 | Sites within a distance of more than 50Kms and up to 100 Kms from BA HQ office |
| 24 | Sites within a distance of more than 100Kms and up to 150 Kms from BA HQ office |
| 25 | Sites within a distance of more than 150Kms and up to 200 Kms from BA HQ office |
| 26 | Closing the wall openings for Window AC units after removing the wooden/aluminium frame if any with 10\"/15\" thick matching with original thickness by cement bricks i/c plastering etc. complete as required. |
| 27 | Dismantling the 25KVA transformer, AB switch fuses, LA, insulators, MS channels from the DP structure and Al. cable, feeder box etc. i/c making the site accessible beforehand by trimming the branches of tree & removing the creepers etc. keeping all the materials in a safe place as per the direction of Engineer -in- charge etc as reqd. |
| 28 | Transportation ofthedismantled materials of Transformer Sub Station such as 25/63/100KVA transformer, AB Switch, HG fuse , LA, insulator, MS channels, feeder box , cable etc. fromsite to nearby Telephone Exchange / suitable storage locationsfor the following distancesby suitable transporting medium i/c escorting , loading at sending end & unloading at receiving endand shifting the same to a suitable place as per the direction ofEngineer - in chargefor further disposal etc. complete as required. |
| 29 | Sites within a distance of up to 50 Kms from BA HQ office |
| 30 | Sites within a distance of more than 50Kms and up to 100 Kms from BA HQ office |
| 31 | Sites within a distance of more than 100Kms and up to 150 Kms from BA HQ office |
| 32 | Sites within a distance of more than 150Kms and up to 200 Kms from BA HQ office |
| 33 | Liaison with the DISCOM (TPCODL) authority for submission ofEB connection surrender/closing letterandco-ordination with thefield unit of the DISCOM authorityfor physical disconnection of 3phase LT/MV supplyi/c removing/dismantlingtheLT/MV service connectioncables & other accessoriesetc. complete as required. |
| 34 | Liaison with the DISCOM (TPCODL) authority for submission ofEB connection surrender/closing letterandco-ordination with thefield unit of the DISCOM authorityfor physical disconnection of11KV HT supplyi/c removing/dismantlingtheOHlineAl. conductors (up to 2 spans) /HTcables & other accessoriesetc. complete as required. |