| 1 | OH OF U#3 BA HOPPER AREA |
| 2 | Replacement/Repairing of Clinker Grinder ( With chute sump and checking/replacement of nozzle, nozzle tip<(>,<)> nozzle holder etc. ) |
| 3 | OH of Feed Gate along with Feed Gate ( accessories and including feed gate enclosure box. ) |
| 4 | Replacement/Servicing of Jet Pump along ( combine tube, nozzle tip, nozzle holder etc ) |
| 5 | Replacement of BA Hopper looking glass/ ( Looking glass assembly. ) |
| 6 | Repairing/Checking of BA Hopper manhole ( door. ) |
| 7 | Replacement/Servicing of Knife Gate V/V ( 200NB/250NB) at economizer surge hopper & at discharge of Clinker Grinder. ) |
| 8 | Replacement/Servicing of 300NB ( 250NB Gate/Globe/Butterfly Valve. ) |
| 9 | Replacement/Servicing of 100NB/150NB/ ( 200NB Butterfly/Plug Valve/Gate/Globe Valve. ) |
| 10 | Replacement/Servicing of 15NB/25NB/50NB/ ( 65NB/80NB/Gate/Globe/Butterfly Valve/Ball Valve. ) |
| 11 | Trough Seal, Economiser Hopper, Eco ( Surge hopper and BA Hopper checking & cleaning. ) |
| 12 | OH OF U#3 ESP AREA |
| 13 | Removal, physical inspection, refitting ( And replacement (if required) of ESP Fluidising Tiles. ) |
| 14 | Checking, removal, refitting, repairing/ ( Replacement of diffuser feeder assembly (below ESP Hopper<(>,<)> 1st & 2nd field) including checking/replacement of diffuser fluidizing tiles for wet cleaning. ) |
| 15 | Checking, removal, refitting, repairing/ ( Replacement of Ash Intake Valve of ESP & APH Hopper for wet cleaning. ) |
| 16 | Checking, Repairing/Replacement of Air ( Intake V/V of ESP vacuum header. ) |
| 17 | Checking, Repairing/Replacement of ( 10inch/9inch TERSG V/Vs. ) |
| 18 | ESP Hopper inside cleaning, checking, ( Repairing (if required) and change of all manhole door packing for wet cleaning. ) |
| 19 | Flushing/Cleaning of fluidising air line ( Total ESP & FAE Tower. ) |
| 20 | OH OF U#3 FA TOWER AREA |
| 21 | Bag Filter/Cage checking, Cleaning & all ( Bag Filter replacement with pulse jet bar & body checking and repairing ) |
| 22 | Replacement/Repairing of Swing ( Disc V/V of Transfer Hopper. ) |
| 23 | Replacement/Repairing of Vent ( Valve, equalising valve of Transfer Hopper and NUVA Feeder. ) |
| 24 | Physical inspection, ash Cleaning & ( Repairing of ISH & Fluidizing tiles/gasket replacement ) |
| 25 | Disposal of ISH ash through tractor |
| 26 | Replacement/Repairing of NUVA ( Feeder diffuser including fluidizing tiles and repairing/replacement of body pad. ) |
| 27 | Replacement/Repairing of Collection Tank ( Including checking & replacement of impingement plate and Drop pipe. ) |
| 28 | OH of Wetting Head including checking & ( Replacement of nozzle, inlet section, gaskets, tail piece, outlet section etc. ) |
| 29 | Replacement/Repairing of Air Washer (Dry ( & Wet) including Checking & replacement of nozzles, gaskets or complete assembly etc. ) |
| 30 | PIPELINE & FABRICATION JOB U#3 |
| 31 | Rotation/Replacement of 8 inch/9 inch ( including bend/lateral/tool piece & T-joint below ESP Hopper & up to FAE Tower, line alignment checking,repairing/erection of damaged support, gasket replacement etc. ) |
| 32 | Replacement of 200NB, 250NB, 300NB MS ( Pipe Line. ) |
| 33 | Replacement of 100NB, 150NB MS pipe line |
| 34 | Replacement of 9inch, 10inch DRC Pipe |
| 35 | Replacement of 15NB, 25NB, 40NB, 50NB, ( 65NB, 80NB MS pipe lines. ) |
| 36 | Replacement of 9inch/10inch CI/DRC ( Tee/Bend etc. ) |
| 37 | Fabrication & Erection of 150NB, 200NB, ( 250NB MS bend. ) |
| 38 | Fabrication & Erection of 40NB, 50NB, ( 65NB, 80NB, 100NB MS bend ) |
| 39 | HIRING OF HYDRA (CAPACITY 14/20 T) U#3 |
| 40 | HIRING OF HYDRA (CAPACITY 14/20 T) ( i) Scope includes Operator & Fuel, lubricant etc. and Break down maintenance, if any. ii) The above service of Hydra to be provided throughout the OH period. ) |
| 41 | GST Extra as applicable Please Enable Macros to View BoQ information |