| 1 | Cleaning of thick bushes and thorny jungle with proper disposal without uprooting. |
| 2 | Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-incharge up to a distance of 30M. |
| 3 | Providing and laying cement concrete A20M10 (1:3:6) with curing complete, including cost of all material, labour, T&P required for completion of work. |
| 4 | Centering and shuttering for R.C.C./R.B. work including cost of centering and shuttering upto 3.0 M height. |
| 5 | Providing and laying RCC A20M-20 (1:1.5:3) with curing complete, including cost of all material, labour, T&P required for completion of work. |
| 6 | Providing & Fixing Steel Reinforcement (Fe 500, TATA/SAIL/JINDAL etc) including cost of steel, bending, binding wire, welding, cutting, placing in position i/c all cost of material, labour, T&P etc. complete. |
| 7 | First class (M-150) brick work with 1:4 cement mortar using cement and coarse sand including cost of all material, labour T&P etc. complete. |
| 8 | 12 mm thick plaster with cement and sand in 1:4 over brick work including supply of all materials, labour, tools & plants etc. required for proper completion of the work. |
| 9 | Providing & Fixing Steel work in built up tubler( round, square or rectangular hollow tubes etc.) trusses etc. including all cost of material, cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, welding and bolting with special shaped washers etc. Complete of work. |
| 10 | Finishing wall with weather coat paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, T&P etc. complete. |
| 11 | Providing and applying two coat of approved enamel paint including cost of material, labour, T&P etc. required for proper completion of work. |
| 12 | Earth work in embankment by power transported earth with a lead beyond 200m. and upto 1.00 km. i/c. excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty. Please Enable Macros to View BoQ information |