| 1 | E/W in foundation in ordinary soil i/c lift upto 1.50 m and lead upto 30 m. labour, T&P etc. complete as per direction of Engineer in charge. |
| 2 | Laying Cement concrete A20M10 in (1:3:6) Cement,coarse sand, aggregate including all cost of material, labour ,T&P etc complete as per ID specifications. |
| 3 | Providing & fixing Centering & Shuttering for .C.C. Work including rent of Centering Material ,Labour and T&P Recquired for proper completion of work. as per direction of Engineer in charge. |
| 4 | Laying Cement concrete A20M20 in (1:1.5:3) Cement,coarse sand, aggregate including all cost of material, labour ,T&P etc complete.as per ID specifications. |
| 5 | Brick work(M-150) in 1:4 CM with cement and coarse sand of fineness modulous not less than 2, including all cost of material, labour ,T&P etc complete.as per ID specifications. |
| 6 | Brickwork (M-150) using old bricks in 1:4 CM with cement and coarse sand of fineness modulous not less than 2, including all cost of material, labour ,T&P etc(excluding cost of bricks) complete.as per ID specifications. |
| 7 | Pointing Struck deep in (1:2 CM) with cement and coarse sand of fineness modulous not less than 2, including all cost of material, labour ,T&P etc complete.as perper ID specifications. |
| 8 | Earhwork in back filling including lead upto 1.00 km and lift upto 1.50m also i/c levelling, ramming, dressing, labour ,T&P etc.complete as per direction of Engineer in charge. |
| 9 | Laying & fixing of brick bats (filter material) with its preperation by breaking old and damaged brick pitching already existing at site including cost of labour, T&P etc. complete. as per direction of Engineer in charge. |
| 10 | Supply & Fixing 80 mm dia P.V.C pipe for weep hole in brick pitching Pannel i/c all cost of Material T&P etc complete as per direction of engineer in charge . |
| 11 | Hiring of Diesel pumps 5H.P for dewatering including operator & POL etc complete. as per direction of engineer in charge . Please Enable Macros to View BoQ information |