| 1 | PART-A (Tanks & Chimney) |
| 2 | Refrigerated Storage tank Shell GI Cladding sheets Re-Painting work (3000 sq.mtr/tank approx x 2tanks)with all tools, tackles using Scaffolding(or)Rope access as per scope of work. |
| 3 | IPPL LOGO & Letter Painting work-2tanks SR-01-01 /02 Front & Back sidewith all tools, tackles using Scaffolding(or)Rope access as per scope of work. |
| 4 | SR-01-01 Butane tank top intersection portion Hot insulation - Supply and application of 100mm LRB matress with 22 SWG Aluminium sheet and all tools, tackles using Scaffolding (or) Rope access as per scope of work.. |
| 5 | Refrigerated Storage TankStructures welding joint corroded portions Painting touch up work - Cleaning, Degreasing the exterior surface corroded portionchipping of rust with brass scrapper, surface preparation to St-2,applyingonly 1 coat protectomastic primer (100-125micron), 1 coat of High Build Epoxy MIO intermediate coat (100-125micron)and applying 1 coats of PU Finish paint (40 micron)with all tools, tackles, including scaffolding/rope access/boatswain chair. |
| 6 | SR-01-02 Propane Tank Shell damaged corrugated cladding sheet patch work -Fixing of spare corrugated sheets over and above the exsiting GI corrugated sheets in shell portion. Scope includes cutting and fixing of spare GI Corrugated GI sheets (Provided By IPPL) to required length with all tools, tackles using Scaffolding (or) Rope access as per scope of work. |
| 7 | Boiler Chimney- Supply & Apply of Painting - Cleaning, Degreasing the exterior surface, chipping of rust with scrapper, surface preparation to St-2, applying 2 coats Heat resistant silicone aluminium paint 400 (40microns) IS 2339 with all tools, tackles, including scaffolding/rope access/boatswain chair. |
| 8 | PART- B (Annual Rate Contract) |
| 9 | Cross-Country PipelineStructural Painting - Cleaning , Degreasing the exterior surface, chipping of rust with scrapper, surface preparation to St-2 /St-3 , Applying 1 coat protectomastic primer(100-125micron), 1 coat of High Build Epoxy MIO intermediate coat(100-125micron) & 1coat of PU Smoke grey Finish paint(40 micron)with all tools, tackles using Scaffolding ,Rope access/ Boatswain chair. |
| 10 | Jetty Pipeline GI cladding sheet Painting - Cleaning , Degreasing the exterior surface, chipping of rust with brass scrapper, surface preparation to St-2/St-3 , applying paint as per system design in Table-1 with all tools, tackles using Scaffolding/ Rope access/ Boatswain chair. |
| 11 | Pipeline Painting - Cleaning, Degreasing the exterior surface, chipping of rust with brass scrapper, surface preparation to St-2 /St-3, Applying 1 coat protectomastic primer(100-125micron), 1 coat of High Build Epoxy MIO intermediate coat(100-125 micron) & 1coat of PU Finish paint(40 micron) with all tools, tackles , including Scaffolding , Rope access/ Boatswain chair. |
| 12 | Process and Utility area Painting including Small Bore Piping (Size 1\" and Below) - Cleaning, Degreasing the exterior surface corroded portion chipping of rust with brass scrapper, surface preparation to St-2,applyingonly 1 coat protectomastic primer(100-125micron), 1 coat of High Build Epoxy MIO intermediate coat(100-125micron) for the corroded portion only and applying 1 coat of PU Finish paint (40-50 micron) for 100% Area with all tools, tackles, including scaffolding/rope access/boatswain chair. |
| 13 | Steam Pipeline Painting- Cleaning, Degreasing the exterior surface, chipping of rust with scrapper, surface preparation to St-2, applying 2 coats Heat resistant silicone aluminium paint 400(40microns) IS 2339 with all tools and tackles. |
| 14 | Supports Painting - Cleaning , Degreasing the exterior surface, chipping of rust with brass scrapper, surface preparation to St-2/St-3, applying 1 coat protectomastic primer(100-125micron), 2coats of Coal Tar Epoxy (200micron) with all tools, tackles. |