|
| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 2 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 3 | Brick soling with straight over burnt bricks laid edge & dry including preparation of sub grade to prescribed camber and including supply of bricks, filling joints with local earth spreading a blinding coat of one cm 3/8\" ) depth of local earth of PI 5 to 7 or sand over the entire surface & including all matarials , labour , T&P etc. required for proper completion of work. SI No. 763 (Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 4 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.(Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 5 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. (Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 6 | PCC Grade M15 using batching plant & manual placing:-Concrete from sub-analysis of concrete Rate Using Batching Plant 15 Cum Capacity SI NO-12.8 (Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 7 | 12mm thick plaster with cement mortar in proportion of 1:3 cement and sand of 1.25 F.M. over brick work minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper completion of the work. SOR No-582 (Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 8 | Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. (Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 9 | Providing and applying 2 coats paint on steel surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. (Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 10 | Providing and laying filter Material in raft and underneath pitching in slopes complete as per drawing and Technical specification. As per SI No. 15.5 |
| 11 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications (Including all material, T&P, labour cess etc. but excluding G.S.T.) |
| 12 | Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification (Including all material, T&P, labour cess etc. but excluding G.S.T.) Please Enable Macros to View BoQ information |