|
| 1 | (2.1(Dismantling of flexible pavements and disposal of dismantledmaterials up to a lead of 50 metres as directed by Engineer. |
| 2 | (2.10.1(Bituminous courses |
| 3 | (2.10.2(Granular courses |
| 4 | (4.2.1(Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil |
| 5 | (1.1.3(Carriage of Materials by mechanical transport including loading,unloading and stacking ::Stone,boulders,gravelly material Beyond 5Km upto 10Km.per Km. E) 5 Km |
| 6 | (7.5.1(Providing laying, spreading and compacting stone aggregates of specific sizes as per Table 400-7 to Water Bound Macadam specification including spreading in uniform thickness; hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) binding materials to fill up the interstices of coarse aggregates, watering (with water browser) and compacting to required density, making necessary earthen bund to protect edges as per clause 404 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion complete. Hand broken - Grade-I (90-45mm) |
| 7 | (8.3(Providing and applying tack coat on the prepared surface withbitumen emulsion as per IS: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 8 | (8.8.5(Providing and laying 50-75 mm compacted thick design mix (approved by Engineer) Dense Bituminous Macadam on prepared surface with specified graded crushed aggregates as per Table 500- 9, 500-10 with bitumen binder set (including cost of anti-stripping compound wherever required) for base/ binder course including loading of material with F.E. loader, heating and mixing of stone aggregate, filler and bitumen in computerised hot mix plant,transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensor control as per clause 504.3.5 to the required level and grade, compacting by power rollers and vibratory rollers or 150 to 250 KN pneumatic tyred roller with TP = 0.7 Mpa to achieve the desired density (approximately 2.3 tonne/cum) complete as per clause 507 of MoRT&H specification but excluding primer/tack coat, including all material, labour,machinery, lighting, guarding and maintenance of diversion.Grade-II with Bitumen VG-grade 30 @ 4.25 %, lime filler @ 2% (percent by weight of total mix) |
| 9 | (8.10.4(Providing and laying 30-45 mm compacted thickness BituminousConcrete as per design mix (approved by Engineer) on preparedsurface with specified grade stone aggregate as per Table - 500-18 with bitumen for wearing course including loading of aggregate with F.E. loader and hot mixing of stone aggregate and bitumen (including cost of anti-stripping compound wherever required) in computerised hot mix plant, transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensing device (as per clause 504-3.5) to the required level and grade and compacting by power rollers and vibratory rollers or 150 to 250 KN pneumatic tyred roller with TP = 0.7 Mpa, to achieve the desired density complete as per clause 509 of MoRT&H specification including all material, labour, machinery, lighting,guarding and maintenance of diversion but excluding primer/tack coat.Grade-II with Bitumen VG-grade 30 @ 6% (percent by weight of total mix) |
| 10 | (17.80.1(Supplying & fixing 560mm dia opening SFRC manhole frame & cover as per IS : 12592-2002 in existing manholes including grouting the frame in PCC M-15 complete in all respect as directed by the Engineer. HD-20 Please Enable Macros to View BoQ information |