| 1 | Clearing jungle including uprooting of rank vegetation grass, bush, wood, trees and saplings of girth up to 30cm., Measured at a height of 1 m. above ground level & removal of rubbish upto a distance of 50m. Outside the periphery of area cleared. |
| 2 | Supply and filling of carted earth from a distance not exceeding 7 KM from the site of work and including cost of earth and all materials, labour T & P etc. Earth work in cutting or embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50mtr. in depth and earth work in embankment & subgrade and earthen shoulders to be in 20cm Layers, including ramming and dressing the surface to required levels and slops and also including 1.5 meter lift and 30 meter lead |
| 3 | Cement concrete with 4 cm. (1½\") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. |
| 4 | R.C.C. work with cement approved coarse sand and 2 cm (3/4\") gauge approved stone grit in the proportion of 1:2:4 in lintels of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.l. binding wire and includuing Necessary centering and shuttering etc.and also including supply of all materials, labour and T&P etc. required for proper completion of the work. Binding wire cost being included in the item.as peAs in item 283 above but in R.C.C. Raft foundation and footing with 4 cm. (1½\")gauge approved stone ballast. S.I 287 |
| 5 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504 only use for sail brand Tmt bar |
| 6 | M 150 class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. |
| 7 | 12mm Thick plaster with cement mortar in proportion of 1:3 cement and Course sand over brick work minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper comletion of the work. (including racking & washing surface) |
| 8 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Morth Specification 4.10 |
| 9 | Supply of 80 mm thick Mechanically CompressedInterlocking cement concrete tiles (30mpa) including 25mm thick compacted bed of fine sand compacting and proper embedding/ laying of Interlocking tiles leveling and dressing of surface to required level and slope, filling joints with fine sand including the cost of material, labour T&P etc.required for proper completion of work as directed by Engineer-in-Charge. |
| 10 | Cast cement concrete small work with cement, approved coarse sand and 2 cm (3/4)\"gauge\" approved stone grit in the proportion of 1:2:4 excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.G.I. binding wire, and including the cost of binding wire, moulds and all otehr materials, labour and T&P etc. required for proper completion of the work. Please Enable Macros to View BoQ information |