| 1 | As per description below |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfillingthe excavation earth to the extent required and utilising the remaning earth locally for road work with approved material. (By Manual Means)clause 304 (B)including carriage of materials, labour, machinery/ equipmentrequired to complete the job with in all lead, lifts and other incidentals as per the direction of Engineer-in-Charge.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, (Exclusive GST) or other taxes imposed by the Government. |
| 3 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 ( One thousand ) metre, stacking serviceable and unserviceable materials separately (Bitumenous course)including carriage of materials, labour, machinery/ equipmentrequired to complete the job with in all lead, lifts and other incidentals as per the direction of Engineer-in-Charge.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax,(Exclusive GST) or other taxes imposed by the Government |
| 4 | Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000( One thousand ) metres, stacking serviceable and unserviceable materials separately (Granular courses)including carriage of materials, labour, machinery/ equipmentrequired to complete the job with in all lead, lifts and other incidentals as per the direction of Engineer-in-Charge.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax,(Exclusive GST) or other taxes imposed by the Government |
| 5 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 ( One thousand )metres(Dismentling Bricks /Tile Work/rubble msonry etc. by mechnical means). The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, (Exclusive GST) or other taxes imposed by the Government. |
| 6 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax,(Exclusive GST) or other taxes imposed by the Government. |
| 7 | Plain Cement Concrete M-15 (Mix - fifteen)nominal mixin foundation with crushed stone aggregate nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days (fourteen days). Form work with steel plates to give a fair finish centring shuttering, strutting propping and removal of the same including carriagre of material with in all leads and lifts complete in all respect as per the direction of Engineer -in-Charge.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax,(Exclusive GST) or other taxes imposed by the Government. |
| 8 | Plain Cement Concrete M-20 (Mix - Twenty) nominal mixin foundation with crushed stone aggregate nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days (fourteen days). Form work with steel plates to give a fair finish centring shuttering, strutting propping and removal of the same including carriagre of material with in all leads and lifts complete in all respect as per the direction of Engineer -in-Charge.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax,(Exclusive GST) or other taxes imposed by the Government. |
| 9 | Reinforced Cement Concrete M-25 (Mix - Twenty Five) nominal mix in foundation with crushed stone aggregate nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days (fourteen days). Form work with steel plates to give a fair finish centring shuttering, strutting propping and removal of the same including carriagre of material with in all leads and lifts complete in all respect as per the direction of Engineer -in-Charge.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax,(Exclusive GST) or other taxes imposed by the Government. |
| 10 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax,(Exclusive GST) or other taxes imposed by the Government. |
| 11 | Providing and laying Cement concrete wearing coat M-30 ( Mix-Thirty) grade including reinforcement complete as per drawing and Technical Specifications. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, (Exclusive GST) or other taxes imposed by the Government. |
| 12 | Providing and laying of boulder apron laid in wire crates with 4mm (Four Millimetre) dia G.I. wire conforming to IS:280 and IS:4826 IN 100mm x 100mm ( One Hundred Millimetre into One Hundred Millimetre) mesh(woven diagonally) including 10 (Ten) percent extra for laps and joints laid with stone boulders weighing not less than 25 kg (Twenty five kilogram) each as per technical specification clause 1301 including carriagre of material with in all leads and lifts complete in all respect as per the direction of Engineer -in-Charge.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax,(Exclusive GST) or other taxes imposed by the Government. |
| 13 | Back filling behind abutment, wing wall and return wall completewith granularmaterial as per drawing and Technical Specifications including carriagre of material with in all leads and lifts complete in all respect as per the direction of Engineer -in-Charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax,(Exclusive GST) or other taxes imposed by the Government. |
| 14 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm(One HunderdMillimetre)dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing and Complete as per drawing and Technical Specifications including carriagre of material with in all leads and lifts complete in all respect as per the direction of Engineer -in-Charge. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax,(Exclusive GST)or other taxes imposed by the Government. |