|
| 1 | Hughes dry dock Services |
| 2 | Hiring of Hughes Dry Dock (HDD) |
| 3 | Yard Services at Hughes Dry Dock |
| 4 | Dock cleaning charges |
| 5 | Supply & Laying of suitable Dock Blocks |
| 6 | Supply & laying of suitable wood packing |
| 7 | Supply & Positioning of Wooden Bottom |
| 8 | Assisting for docking / undocking exclud |
| 9 | Mooring and line handling excluding tug |
| 10 | Unmooring and line handling excluding |
| 11 | Fire line pressurized line per day |
| 12 | Connection and disconnectionof pressur |
| 13 | Sea Water supply to ballast tanks |
| 14 | Connection & disconnection of Sea Water |
| 15 | Power supply (50hz, 3phase 110V, 230V, 3 |
| 16 | Connection & disconnection of Power |
| 17 | Fresh Water Supply per MT |
| 18 | Connection & disconnectionof Fresh Wat |
| 19 | Provision of Gangways |
| 20 | Fire/Security watch per day |
| 21 | Yard Crane (with operator) up to 20T |
| 22 | Yard Crane (with operator) 20T to 60 T |
| 23 | Yard Crane (with operator) –150T |
| 24 | Yard Crane (with operator) – 250T |
| 25 | Yard Fork Lift |
| 26 | Cherry Picker with operator (working hei |
| 27 | Hydra with operator (12Ton capacity) |
| 28 | One Chiller Plant (200 TR) with flexible |
| 29 | One Chiller Plant (200 TR) with flexible |
| 30 | Scaffolding along with material |
| 31 | Cleaning of HDD as and when required |
| 32 | Hiring Containersfor Office (05 Nos) |
| 33 | Hiring Containersfor Material (03 Nos) |
| 34 | Dedicated Toilets & Urinals arrangement |
| 35 | Removal of Galley Refuse |
| 36 | Removal of other garbage (Including Copp |