| 1 | Demolition of cement concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed by the Engineer-in-Charge. |
| 2 | M&L for plain cement concrete nominal mix 1:4:8 type D2 using 40mm graded stone aggregateas in foundation, filling & mass concrete complete all as specified and directed by the Engineer-in-Charge. |
| 3 | M&L for 100mm thickplain cement concrete nominal mix 1:2:4 type B-2 using 40mm graded stone aggregateas in floors, pavings etc and finishing cement concrete surface even and smooth with using extra cement & by using Dr Fixit Pidiproof LW+ as per manufacturer instructionscomplete all as specified and directed.Note: Dr Fixit Pidiproofto be used as per manufacturers instructions and paid separately under respective items of BOQ. |
| 4 | M&L for plain cement concrete nominal mix 1:2:4type B1 using 20mm graded stone aggregateas in copings, apex stones, kerbs rounded or chamfered angles and throating complete all as specified and as directed by the Engineer-in-Charge. |
| 5 | M&L for 75mm thick plain cement concrete nominal mix 1:3:6type C2 using 40mm graded stone aggregateas in plinth protection and finishing the surface even and smooth without using extra cement complete all as specified and as directed by the Engineer-in-Charge. |
| 6 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles\"complete all as specified and as directed by the Engineer-in-Charge. |
| 7 | M&L for brick work with sub class B bricks , straight or curved on plan exc 6m mean radius built in cement mortar 1:4 complete all as specified and as directed by the Engineer-in-Charge. |
| 8 | Taking down cement plaster on brick wallincluding raking out joints, hacking for key, scrubbing down with water complete all as specified and directed by the Engineer-in-Charge. |
| 9 | M&L for cement plaster 20mm thick over brick/ concrete surfaces & finished even & smooth in two layers and by using Dr Fixit Pidiproof LW+ as per manufacturer instructions complete all as specified and as directed.Note: Dr Fixit Pidiproofto be used as per manufacturers instructions and paid separately under respective items of BOQ. |
| 10 | M&L for clean the surface with wire brushto remove hidden dirt, loose particles & dust and apply 1st coat ofDr Fixit Pidifin 2K , after applying one first coat provide & fix 50 gsm glass fibre mesh over the first coat in still wet.Second coat apply after 8 hrs of applying of 1st coat directly perpendicular to first coat. Finally sprinkles coarse sand after second coat in wet for upcoming plaster work over floor surfaces of concrete / brickwork as per manufacturers instructions, complete all as specified & directed. Note : Quoted rate isinclusive of water proofing liquid andcement. |
| 11 | M&L for Preparation of new plastered surfaces of wall and apply two coats ofAcrylic emulsion exterior paint of required shade :(Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) complete all as specified and directed by the Engineer-in-Charge. |
| 12 | Supply only Dr Fixit Pidiproof LW+ liquid water proofing compound. |
| 13 | Material & labour for High performance hybrid polyurea elastomeric waterproofingspray appliedSmartCare Hypertron Hybridliquid membrane with an elongation of 600% and tensile strength of more than 13 N/mm2 as per ISO 527 type 5 , shore A Hardness of min. 85 as per ISO 868, andcrack bridging ability of 3.5 mm as per ASTM C1305. The system includes final base preparation, epoxy primer application and applying SmartCare Hypertron Hybrid or approved equivalent in two coats with a consumption of 2kg/sqmt, etc complete as per Manufacturere specifications. |
| 14 | M&L for broken stone or boulders hardcore of gauge n.exc 63mm, deposited ,spread and levelled in layers n.exc 15cm thick, watered and rammed to true surface complete all as specified and directed by the Engineer-in-Charge. |
| 15 | M&L for providing and laying 60mm thick factory made chamfered edge cement concrete paver block of M-35 grade with approved colour, design & pattern as in footparth, parks, lawns, drive ways or light traffic parking etc., of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over and including 25mm thick compacted bed of fine sand, compacting and proper embedding/ laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand, complete all as specified. |
| 16 | Dismantling wrought iron or mild steel work of any discrption not otherwise provided forall as specified and directed. |
| 17 | S&F Framed work such as grills, gratings, etc.. with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe.290.Gde-E-165, complete all as specified. |
| 18 | S&F PVC coated iron expanded welded mesh corrosion and abrasion resistance and aperture ofmesh is 2.5 to 4.0 cm and fixed over iron frame work including removing of old netting from tank, complete all as specified. |
| 19 | M&L for preparation of new iron and steel surfaces of any description exceeding 10 cm width or girth and applying two coats of epoxy base paint over a coat of epoxy base red oxide primer complete all specified and as directed. |
| 20 | Excavating in post holes (or similar holes) each n.exc 0.5 cum, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm complete all as specified and directed by the Engineer-in-Charge. |
| 21 | M&L for plain cement concrete nominal mix 1:2:4 type B2 using 40mm graded stone aggregateas in foundation, filling & mass concrete complete all as specified and directed by the Engineer-in-Charge. |
| 22 | S&F rolled sections as in main & cross beams , columns, hip and jack rafters , purlins where connected to common rafters and running rails & any other places with angles cleats or other connected plates, wind ties , vertical posts, etc confirming to Fe 410 -W (Gde-E-250) quality A complete all as specified and directed by the Engineer-in-Charge. |
| 23 | Supply and fix Pre-painted Galvalume Aluminium zinc coating GI based corrugated steel sheet 0.50 mm thick of an colour having tensile strength of 550 Mpa as in roof covering/cladding to wall, fixed with self tapping screws complete all as specified and directed by the Engineer-in-Charge. |
| 24 | Removing / disposal of unserviceable materials, debris and rubbish , earth obtained fromexcavation including loading /unloading etc , outside MoD land upto distance 60 Km as per BMC guidelines and asdirected by the Engineer-in-Charge. |
| 25 | M&L for plain cement concrete nominal mix 1:4:8 type D2 using 40mm graded stone aggregate as in sub base of floors complete all as specified and directed by the Engineer-in-Charge. |
| 26 | M&L for rubber moulded glossy finish coloured Chequered cement concrete tiles of overall size 30cm x 30cm x 25mm thick (Pattern of tile : Chathura :size 300 x 300 with offset at 4 corners of 50mm x 50mm andsquare tile of size 100mm x 100mm and fixed as per manufacturer instructions, samples are kept in Office of the AGE B/R Madh Island), set, jointed and pointed in neat cement slurry in floors over 15mm thick screed bed in CM 1:6 complete all as specified and directed by the Engineer-in-Charge. |
| 27 | M&L for Machine cut kota stone slab flooring 20-25mm thick over cement screed bed in CM 1:6 laid and jointed with grey cement slurry mixed pigment to match the shade of the slab including rubbing and polishing complete all as specified and directed by the Engineer-in-Charge. |
| 28 | Material & Labour for providing and fixing stainless steel (Grade 304) kitchen trollies made of tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (where ever required) and fitting the same with necessary stainless steel nuts and bolts complete, including fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of floor or the side of waist slab with suitable arrangement complete all as specified and directed by the Engineer-in-Charge. |
| 29 | S&F for 12mm thick plywood, Grade BWP, type BB as in kitchen trollies & doors fixed with screws to timber work or , staniless steel frame / pasted( by using adhesives) over cuddappa stone or over brick/stone walls complete all as specified and directed by the Engineer-in-Charge. |
| 30 | S&F 0.9 mm Thick decorative laminates type 1 or surface finish,colour and pattern as approved and fixed with suitable adhesive over plywood of approved make complete all as specified and directed by the Engineer-in-Charge. |
| 31 | S&F drawer handles, projection drop (50mm to 65mm) on screwed plate complete all as specified and directed by the Engineer-in-Charge. |
| 32 | S&F godrej drawer channel, (suitable for weight capacity 35 kg) telescopic channel , slider type heavy ball bearing , & fixed in stainless steel kitchen racks complete all as specified and directed by the Engineer-in-Charge. |
| 33 | S&F continuous (piano) hinges, mild steel, bright finish or elec-trogalvanised , Width of fplap is 35 mm & fixed over plywood with screw complete all as specified and directed by the Engineer-in-Charge. |
| 34 | S&F Solid PVC Wall Lining consisting of 5mm thick plain colour PVC sheet inclusive of solvent cement and fixing at site on PVC fillets including providing & fixing of suitable PVC fillets etc over corners and at top and bottom of panelling, around switch boxes or any other projected itesm fixed over walls, complete all as specified in drawing of SSR Part-II . |
| 35 | S&F 5mm thick PVC sheet fillet of width 35mm for wall paneling inclusive of fixing on to wall to make PVC Frame for fixing of PVC panelling complete all as specified in drawing of SSR Part-II . |
| 36 | M&L for Non skid ceramic coloured tiles Ist quality7 to 8mm thick, (square/ rectangular) as in patches, area of each tile exceeding 0.06 sqm, but not exceeding 0.11 sqm as in floors etc. set and jointedin neatcementslurry and pointed in white or coloured cement to match the shade of tiles, laid over and including15mm thick screed bed or bedding layer in cement mortar1:6, complete all as specified and as directed by the Engineer-in-Charge. |
| 37 | M&L for rendering 15 mm thick on fair faces of brick or on concrete surfacesin cement mortar 1:6 and finishedeven and smooth without using extra cement, complete all as specified and as directed by Engineer-in-Charge. |
| 38 | M&L for preparation of new plastered or unplastered surfaces of walls including scrapping and applying two coats of distemper oil emulsion over a coat of 1mm thick wall care putty, completeall as specified and directed. |
| 39 | S&F false ceiling with powder coated exposed GI grip suspension system (E-grip T-2430 of equivalent load carrying capacity with mid span deffection not exceeding 1/360 span with hanger spacing of 1200mm c/c) consisting of main runner 3600mm long, cross tee 1200mm/600mm long wall angle. The main runners to be placed @ 1200mm, the cross tee 1200mm will be inserted in the pre cut slots of main runner at a regular interval of 600mm from a modular grid of 1200mm X 600mm. Additional cross less of 600mm shall be placed perpendicular to the cross tee 1200mm long to finally from a grip of 600mm X 600mm. Grip of modular size 600mm X 600mm shall be supported by 6mm dia GI wire from purlins/soffitand fixed complete all as specified and as directed.Make : Armstrong Optra RH95/ FG Classic. |
| 40 | S&F for armstrong optra RH95 mineral fibre and soft fibre ceilingsboards 600x600x15mm in size, fixed in snap grid false ceiling frame work of approved colour, type complete fixed in position all as specified and directed.Make : Armstrong Optra RH95/ FG Classic. |
| 41 | M & Lforpoint wiring complete for light/ fan on independent /combine boardwith cable 1.5 sqmm (Nominal area) FRLSHPVC insulated multistranded unsheathed copper conductor,drawn in and includingPVC casing & caping/conduit , hooks , elbows, juction covers and junction boxes , aftercutting in walland sinking\"s for modular metal flush boxes suitable lengthand Min 1.6 mmthickness, Min 51 mm depthfor mounting, switches, sockets,fan regulatorwith modular cover plate with frame and making the gooddisturbed surfaces of wallin CM 1:3 with white wash or existing colour including provision ofcontinuousearth continuity conductoralong with point wiring of 1.5 sqmm copper PVC insulated cable for one light/ fan point controlled by one switchand connected to commonearth dolly, complete all as specified anddireced . |
| 42 | S & Fmodularsocket2/3 pin, type 5/6 Amps 5 in 1flush type including modular cover plate and metal flush box with frame complete all as specified and directed . |
| 43 | S & Fmodular switch5/6 Amps single pole one way,one module including modular cover plate with frame and metal flush box complete all as specified and directed . |
| 44 | S & F ceiling rose surface bakelitethree terminals complete all as specified and directed. |
| 45 | Supply and fixing LED luminaire 600 mm x 600 mm,35/36 watt, 220 V AC recessed type with high efficiency PMMA diffuser soft glare free light complete with driver, holders & LED lamp suitable for roof ceiling including connecting up with driver three core flexible copper conductor cases of suitable size complete. |
| 46 | Supply & fixing LED land scape light/bollard lightwith excellent light output through its sleek PMMA window ensuring max illumination aspect in surrounding, 10W/9 W warm white with 900mm height extruded aluminium cylindrical section housing IP-65 rated complete with base & log bolt grafite grey epoxy cationic powder coated all accessories including PCC foundation for fixing arrangement on groundcomplete all as specified and directed . |
| 47 | S&F decorative wall light,brushed nickle finish fixture with OPAL glass diffuser including 9 watt warm white LED B22 base complete all as specified and directed. |
| 48 | Supply & FixLED flood light fitting 210 Watts , 230 V AC outdoor type with thermal management in multiple optics and equipped with IP66 protection with impact and corrosion resistant ,Pressure die cast aluminium housing, heat resistant toughened glass with frame, uniform distribution ,includingfixing arrangmentswith angle iron and suitable nut,bolt,washer etc on wall /on pole complete all as specified and as directed. |
| 49 | S&F wall mounting fans for 230 volts single phase400 mm sweep complete all as specified and directed. |
| 50 | S&F copper cable flexiblePVC insulated 3 x 2.5sqmm single core along with earth wire in PVC conduit from FRP box to street light/flood light fitting ,including aluminium flat clampt 25 X 4 mm -03 Nos with suitable nuts,bolts and washers etc all as specified and directed. |
| 51 | S & F sheet metal enclosure for double door DB made out of CRCA mild steel sheet surface with insulated material like polyester with epoxy powder coated surface mounted SP & N 4 ways, 240 Volts, ISI marked 200 amps bus bar stove enameled dust and vermin proof, IP 42 suitable for incorporation MCBs and isolators etcincluding making good disturbed surfaces of walls as necessaty complete all as specified and directed. |
| 52 | S & FMCB ‘B’ series type suitable for 240 volts, AC supply6 to 32 Amps, S P & N with over load and short circuit protection and rupturing capacity not less than 10KA complete all as specified and directed. |
| 53 | S & F MCB ‘B’ series type suitable for 240 volts,10 KA,AC supply6 to 32 Amps , single pole (SP) with over load and short circuit protection and rupturing capacity not less than 10KA complete all as specified and directed. |
| 54 | Supply and fixing anti suicide ceiling fan rod (18\") white/brown, others including metallic as per need, MS pipe zinc plated pipe OD-19mm, thickness 1.8+/-0.05mm, Spring set grade 3 Carbon spring steel material, zinc plated, MSME tested, load of 22 kgs come on the anti sucide impact fan rod, the rod will get open from centre, spring inside will be expanded, fan clamp with rubber reel nut bolt & safety pin as suitable for ceiling fan complete all as specified and directed . |
| 55 | Supply and fixing anti suicide ceiling fan rod (36\") white/brown, others including metallic as per need, MS pipe zinc plated pipe OD-19mm, thickness 1.8+/-0.05mm, Spring set grade 3 Carbon spring steel material, zinc plated, MSME tested, load of 22 kgs come on the anti sucide impact fan rod, the rod will get open from centre, spring inside will be expanded, fan clamp with rubber reel nut bolt & safety pin as suitable for ceiling fan complete all as specified and directed. |
| 56 | Excavation in trenches, not exc 1.5 mtr wide and not exc 1.5 mtr deep and getting out in soft/ loose soil for foundation, cesspits, manholes, sewage lines, shaft, pier holes, cable etc, complete all as specified and directed. |
| 57 | Excavation in trenches, not exc 1.5 mtr wide and not exc 1.5 mtr deep and getting out in hard/ dense soil for foundation, cesspits, manholes, sewage lines, shaft, pier holes, cable etc, complete all as specified and directed. |
| 58 | Returning filling in including spreading leveling, watering and well ramming in layers not exe 25 cm each layer complete all as specified and directed. |
| 59 | Supply and laying50 mm outer dia double wall corrugated (DWC) high density polythene pipes having corrugation on the outer wall and plain surface on the inner wall confirming to IS 16205 & IS14930 ( Part I and II) for protection of underground cableswith all fittings. laid in trenches / road or fixed along wall. poles or laid under floor and making good to match with existing adjoining surface etc for cable protection complete all as specified and directed. Note:-Excavation and earth work shall be measured and paid separately. |
| 60 | M&L for cutting existing road/hard standing not exc 50cm x 60 cm in wide & 60cm depth getting out demolished/ excavatedmaterial for laying of GI tube , for passing ofLT cable, returning filling & well rammaing wateringfinish suraface 10 cm from top using cement concrete 1:2:4type B1 using 20mm graded stone aggregate, finishing the surface even and fair to match the adjoining surface including removal of surplus soil complete all as specified and directed. |
| 61 | Supply and fix FRP cable looping box of size 250mm x 150mm x 100mm With connector block 4 Way , 1 Nos of MCB SP 6 Amp 10KA,etcincluding suitable Brass gland, including provision for connecting earth continuity conductor etc. all as specified and directed. |
| 62 | Supply and lay jointing and testing and commissioning of 10 Sqmmx2 core XLPE insulated, screened , PVC bedded galvanised steel strip or wire armoured electric power cable heavy duty multi stranded aluminium conductor & PVC sheathed LT cable 1100 V grade conforming to IS-7098 laid in trenches/ducts/fixed on poles wall/laid under roads/paths/drain/culverts or passing through pipes complete all as specified and directed . |
| 63 | Supply install, commissioning and testing of Monoblock pump set suitable for 415 V ,3 phase system having capacity 5 HP including provn PCC foundation with cover shed to protect pump in rainy season complete all as specified and directed by Engr-In-Charge. |
| 64 | Supply, installation and testing of DOL starter for monoblock pump, 415 V, TP suitable for 5 HP with ON/OFF switch, single phase preventor, motor ON/Trip indicator, MCB TP-63 Amps, Ammeter, Voltmeter with selector switch of pump complete all as specified and directed by Engr-In-Charge. |
| 65 | Suppply and fix Non return Valve of size 80 mm complete all as specified and directed by the Engineer-in-Charge. |
| 66 | Suppply and fix Foot Valve of size 80 mm complete all as specified and directed by the Engineer-in-Charge. |
| 67 | M&L for plain cement concrete nominal mix 1:2:4 type B-2 using 40mm graded stone aggregateas in floors, pavings etc and finishing cement concrete surface even and smooth with using extra cement complete all as specified and directed by the Engineer-in-Charge. |
| 68 | Supplying,laying,connecting and testing of 80 mm bore GI Tubing medium grade with and including all fittings such as bends elbows, tees, short pieces, connectors,check nuts,diminishing pieces,caps and plugs,unions, etc fixed laid in trenches including Suction and delivery pipe connection complete all as specified and as directed . |
| 69 | M & L for HDPE pipes flexible type, 80 mm dia and jointed complete with collars and all necessary fittings and fixtures complete all as specified and directed. |
| 70 | Supply & fix Gun-Metal,globe or gate valves 80 mm,with iron wheel head,screwed both ends for iron pipecomplete all as specified and directed . |
| 71 | Supply and lay cable XLPE Insulated armored, heavy duty electric power cables (heavy duty) 1100 Volts grade cross sectional area with stranded aluminium conductor of size 10 sq mm 4 Core complete all as specified and directed. |
| 72 | Supply and spreading in trenches cleardry sand for cable protection and punning down gently 10 cm below the cable and 15 cm above the cable all as specified and directed. Note :- Punning thickness shall be measured. |
| 73 | S&F unreinforced precast concrete cable cover factory made embossed the mark “LT CABLE” class LV type1 flat size 250x150x40 mmduring excation of trenchesall asspecified and directed. |
| 74 | M & L for Earthing complete with GI earth plate electrode 60 cm x 60 cm x 6 mmthick burried directly in ground (earth pit not less than 2.25 Mtr deep below ground level ) with top edge of plate not less than 1.5 Mtr below ground level , connecting to GI Strip 32 X 6 mm as earthing lead ,by means of bolts,nuts and washers of GIand protection by provisionof GI medium grade pipe 50 mm bore including provision of concrete pit in PCC (1:2:4) type B1 using 20 mm grade stone aggregate with 40 mm thick cover of RCC (1:2:4) reinforced with XPM (weight not less than 4 gs /Sqmm ) and frame of angle iron 25mmX25mmX6mm with lugs 02 Nos and with 6 mm dia MS bar handle made to shape ,GI light grade 20mm bore pipe for watering perforated at the bottom 1.75 meter long placed ontop edge of earth plate common salt and charcoal filling test point made out of 40 mmX 8 mm FI with fixing arrangement ,funnel, wire mesh and earth work inhard dense soil ,returning filling in and removal of surplus soil to a distance not exceeding50 mtrs all as per electric plate no.3 of SSR part 1 and connecting to earth test point including taking out unserviceable earthing with all acessories all as specified or indicated including testing on completion all as specified and directed. |
| 75 | Supply, installation, testing & commissioning flame proof split type air Conditionerswith following accessories andtechnical specification:-(a) Technical Specification:-FLP Split AC Unit Capacity :- 2TR, Gas Group:-IIC, Ingress protection:- IP-66, Temperature class:-T6, Refrigerant:-R-407C,Medium:-Air-cooled,FLP ODU [Condensing Unit] Casing:- SS304Compressor:-Emerson Make Hermetically sealed With FLP Termination Box,Compressor Ratings:- 230V,50HZ, 1 PHASE,Fan motor Ratings:-0.25 HP, 920 RPM,Mounting Arrangement:- wall mounted on proper angle iron frame,Tube Connection:-3/8\" & 5/8\",Heat Exchanger:-Copper tube Aluminium finsFLP IDU (Evaporative Unit) Casing:-SS304,Air Flow :- 1000-1200 CFM,Fan Type:-Blower Non-sparkable type, MOCAluminium K2 grade,Fan Motor Ratings:-0.25 HP, 920 RPM,Heat Exchanger:- Copper tube Aluminium fins,Tube Connection:- 3/8\" & 5/8\",Filter:- Removable and washable(b) Flameproof Control Panel:-(i)Indication lamps-03 No’s (Power On, Compressor On, Cooling Motor On)(ii) Main incoming MCB of suitable rating for overload and short circuit protection(iii)Contactor and overload 3 Nos. set for overcurrent protection of compressor and motors.(iv)FLP Thermostat/ Temperature controller with RTD sensor for temperature selection.(c)Cable Glands:- Flameproof double compression brass, nickel plated cable glands for electrical connection of length as required at site.(d)Accessories:- (i)3/8’’ copper pipe with insulation Sleeve- 15 Metre.(ii) 5/8’’ copper pipe with insulation sleeve- 15 Metre.(iii)1’’ Water Drain Pipe 5 Meter. Note:- Quoted rate is inclusive ofsupply, installation, testing & commissioning flame proof split type air conditioners as per technical specification, Flame proof control pannel, Cable glands and its accessories. |
| 76 | S & F Flame proof switch socket & plug combined in LM6 cable termination box in LM6, 25A, 250V, 2P+earth complete all as specified and directed. |
| 77 | M & Lforpoint wiring using approved color coding as per IS with zero halogen flame retardant (HFFR), smoke free,non toxic ,non corrossive installation cable with UNILAY construction copper conductor 4.0 Sqmm (nominal area) ,single core insulated and unsheathed stranded cable 1100 volt grade ISI - 694 marked IEC and FIA approved in and including heavy duty electric resistance welded (ERW) stove enameled conduit ,heavy duty ISI marked as per IS -9557 (part-1) 1980 for one light point controlled by one switch including HFFR insulated unsheathed unilay construction copper conductor 4.0 sqmm nominal cross sectional area wire as earth continuity conductor up to common earth and connecting to earth dolly complete all as specified and directed . The under mentionedflame proof fitting for wiring work shall be incorporated as required basis and cost there of shall be inclusive in the quoted rate:- (a) Flame proof junction box 3 way suitable for ¾” ET conduit material LM-6.(b) Flame proof junction box 2 way suitable for ¾” ET conduit material LM-6. (c) Flame proof junction box 3 way suitable for3/4\" ET conduit material LM-6 (d) Supply and fix flame proof union suitable for 20mm dia ERW conduit. |