| 1 | Sch \"A\" |
| 2 | Demolition of brickwork built in cement or cement lime mortar including all quoins, arches, pillars, etc but excluding ashlar facings, dressed stonework and precast concrete articles complete all as directed & specified. |
| 3 | M&L Brick work with sub class ‘B’ brick in CM 1:4 straight or curved on plan to any radius in half brick thick wall complete all as directed & specified. |
| 4 | All as per item No 02 above but except bricks complete all as directed & specified (Old bricks shall be reused). |
| 5 | M&L brick work with sub class \"B\" bricks straight or curved on plan exc 6 mtr mean radius built in CM 1:6 complete all as directed & specified. |
| 6 | All as per item No 04 above but except bricks complete all as directed & specified (Old bricks shall be reused). |
| 7 | Taking down cement plaster of any description including raking out joints, hacking for key, scrubbing down with water etc. complete all as directed & specified. |
| 8 | M&L rendering 15mm thick on brick work or concrete surface in cement mortar (1:4) and finished the surfaces even and smooth without using extra cement complete all as directed & specified. |
| 9 | Extra for forming fair finished drain or channel30cminnergirthincement concrete, using extracement, including forms, moulds, mitred/stopped ends etc complete all as directed & specified. |
| 10 | Demolition of reinforced cement concrete of any description and in any position complete all as specified and directed. |
| 11 | M&L precast reinforced cement concrete (1:2:4) type B-1 using 20mm graded crushed stone aggregate as in drain covers and the like set in cement mortar (1:4) duly placed on manholes inclusive of necessary form work complete all as directed & specified. Note: Reinforcement bars shall be measured and paid separately. |
| 12 | M&L TMT bars 10 mm dia cut to length, bent to shape required including bending, cranking etc and binding with and including MS wire (annealed) not less than 0.9mm dia complete all as directed & specified. |
| 13 | Excavation in trenches n. exc 1.5 metre wide for foundations etc. and not exceeding 1.5 m deep and getting out in soft/ loose soil complete all as specified & directed. |
| 14 | Demolition and breaking up 300 mm bore drain pipes (salt glazed stoneware, AC or reinforced concrete) set in cement mortar including bedding and haunching and removing to a distance exc. 250 metres and n. exc. 500 metres complete all as directed & specified. |
| 15 | M&L cement concrete (1:4:8) type D-2 using 40mm graded crushed stone aggregate as in bed to 300 mm boredrain pipes including packing under and haunching against the sides of pipe after they are laid and tested complete all as directed & specified. |
| 16 | M&L 300 mm bore reinforced concrete pipe class NP2 laid in trenches includingjointing & testingcomplete with collars complete all as directed & specified. |
| 17 | Returning filling in soil including spreading, levelling, watering and well ramming in layers notexceeding 25cm thick complete all as directed & specified. |
| 18 | Removal of excavated surplus soil to a distance n. exc. 50m and depositing where directed at level not exceeding 1.5 m above the starting point complete all as directed & specified. |