| 1 | Cleaning of under ground sump with wire brush and taking out sludge complete manually/mechnically and applying bleaching powder wash on inner surface of reservoir 8 lakhs gallons capacity Berthumacomplete all as specified and as directed. |
| 2 | All as per item No. 1.00 here in before but 3.5 Lakhs Gallons Capacity at Berthuma Pump House |
| 3 | All as per item No. 1.00here in before but 3.5 Lakhs GallonsKumaon Hill (inner & Outer tank) |
| 4 | All as per item no 1.00here-in-before but 2.0 lakhs gallons capacity (900 KL) at Rajghat pump house. |
| 5 | All as per item no 1.00here-in-before but Ground reservoir of 1.75 lakhs gallons capacity at University Hill. |
| 6 | All as per item no 1.00 here-in-before but Ground reservoir of 0.30 lakhs gallons capacity Medical tankHawk swimming pool. |
| 7 | All as per item no 1.00 here-in-before but Ground reservoir of0.10 lakh gallons capacityat \"A\" Mess. |
| 8 | All as per item no 1.00 here-in-before but Ground reservoir of 0.10 lakh gallons capacity at MH |
| 9 | All as per item no 1.00 here-in-before but Ground reservoir of 0.20 lakh gallons capacity at MRC Cav Hills. |
| 10 | All as per item no 1.00here-in-before but Ground reservoir of 0.8 lakh gallons capacity at MRC Cav Hills |
| 11 | All as per item no 1.00here-in-before but Ground reservoir of 0.3 lakh gallons capacity at Lakha Nager |
| 12 | Cleaning the overhead reservoir with wire brush and taking out the sludge complete RCC OH reservoir and applying bleaching wash on inner surface of 0.25 Lakhs gallons capacity at 15M height at Lekha Nager complete all as specified and as directed. |
| 13 | All as per item no 12.00 here-in-before but RCC OH reservoir of 0.50 lakh gallons capacity at 20 M height at MH |
| 14 | All as per item no 12.00here-in-before but RCC OH reservoir of 0.30 lakh gallons capacity at 20 M height at Hawk Hill Signal |
| 15 | All as per item no 12.00here-in-before but RCC OH reservoir of 0.50 lakh gallons capacity at 20 M height near Cantt Board. |
| 16 | All as per item no 12.00 here-in-before but RCC OH reservoir of 0.20 lakh gallons capacity at 20 M height near Mandir Marg |
| 17 | All as per item no 12.00 here-in-before but RCC OH reservoir of 0.20 lakh gallons capacity at 20 M height near Near Stn HQ (372 ASC) |
| 18 | All as per item no 12.00 here-in-before but RCC OH reservoir of 0.20 lakh gallons capacity at 20 M height Div HQ Signal (Opposite of Children park) |
| 19 | Cleaning the Shallow well/deep wellremoving complete water from deep/shallow/RCC well 40’ to 70’ deep and removing the sludge. |
| 20 | Notefor item Nos.1 to 19(i) On completion of cleaning of tank, date of cleaning to be marked /written clearly on tank surface in an accesscible location with letters or figure n exc 20 cm high viz \"TANK CLEANED ON 00-00-00(ii)Cleaning of tank to be carried out in accordance with the schedule, publilshed for the purpose of cleaning of tank.(iii).All cleaning material,tools safety equipment & any other material required for this purpose shall be provided by the Contractor.(iv). Rate deemed to include to provide pump set for dewatering from the UG sump/fire static tank (v). Insurance cover for the Employed people is must and sole responsibility of the contractor.(vi).The rate quoated by the contractor shall be inclusive of all the provision(vii)Material recovered during clean should deposit minimum 100 mtr away from reservoir/OHT/Shallow well |
| 21 | The Following items supply Only :- |
| 22 | Bleaching powder stable Grade-I as per IS specifiction 1065/1989 (2nd revision) fresh MED in 25 Kgs HDPC bags having chlorine not less than 30% all as specified. Make-/Brila Adhithya/Sriram/Gujrat alcalies & Chemicals ltd/Centarary alcalies |
| 23 | Chlorine Test Kit with coloured sample compete with all testing equipments and OT solution in rexine finish box |
| 24 | Copper sulphate (Cuso4) for the swimming pool complete all as specified and as directed . |
| 25 | Crystal Alum for swimming pool complete all as specified and as directed . |
| 26 | Hydrated lime complete all as specified and as directed . |
| 27 | MS Bolts,Nuts with two washers different sizes and different lengths |
| 28 | Calcium based granular high strength disinfectant chlorinating chemical (Anti corrossion & Anti descaling agent) for treatment of Drinking water complete all as specified and as directed . |
| 29 | Aluminium sulphate (Non-Ferric Alum) Al2O3 - 16 %in the form of 18Kg - 20 Kg slab suitable for water purification and drinking purposecomplete all as specified and as directed . |
| 30 | TCCA -90 (Trichloroisoyanuric Acid & Chemical) |
| 31 | Belt of size B-95/92/94 |
| 32 | Compressor Oil |
| 33 | Belt for Air Compressor |
| 34 | Nylon brush with MS pipe handle for cleanning swimming poolor as per existing size and all as specified and directed by Engr-in -Charge |
| 35 | Lead Pig |
| 36 | O-Tolidine reagent For Chlorine estimation |
| 37 | POOL STANDARD – B23Pool algaecide specifically effectiveagainst green, black spot & mustard algae.Packing: 5 Kg. sealed plastic container Make: Declibac or equivalent |
| 38 | POOL STANDARD – A94Fast acting pool clarifier to clear dull, hazy or cloudy water which can occur in newly filled pools, during warm weather, with pool start upor with algae growth. Packing: 25 Kg. sealed plastic container |
| 39 | POOL STANDARD – T19Pool balance module to check water parameters with following ranges: pH: 6.8 – 8.4Total Alkalinity: 0 ppm - 240ppmAvailable Chlorine: 0 ppm - 5 ppmHardness: 0 ppm - 1000 ppmStabiliser: 0 ppm - 250 ppmPacking: 50 strips in sealed plastic container |
| 40 | Taking down the rusted MS ladder,railings/any Iron frame workfrom UG sump/Pump house plant and M&L for newFramed work such as grills,gratings, etc.. with ends of barsshouldered and/or riveted,or forged into spikes; framedguard bars; barred iron doors,ladders; framed balusters; walkways; railings; framework ofwater tanks and similar workcon- forming to Fe.290.Gde-E-165 as per site requirement complete all as specified and as directed . |
| 41 | M & L for painting of Existing Ladder ,Railing with one coat of red oxide , zinc chrome and two coats of anti corrosive synthetic enamel paint including prearation of old painted surface complete all as specified and as directed . |
| 42 | Taking down the top layer of theexisting filter media for Rapid Sand filtration plant No. 1 & 2 at berthuma filtration plant and Swimming pool water filter plant(Location : Hawk Hill &MRC) removal to a distance not exceeding 50 metre and dopositing where directed complete all as specified and as directed . |
| 43 | Refilling the serviceable media (ie pebbles) of various sizes obtainedfrom taking out vide item No.40 in the Rapid sand filtration plant& swimming pool filteration plant after cleaning with acid and pure water etc complete all as specified and directed. |
| 44 | Supply and fill Quartz sand 16x 30 Mesh as filter media in theRapid sand filtration plant& swimming pool filteration plantcomplete all as specified and directed. |
| 45 | Supply and fill Brown sand 8x12 Mesh as filter media in theRapid sand filtration plant& swimming pool filteration plantcomplete all as specified and directed. |
| 46 | Supply and fill Brown sand 4x8 Mesh as filter media in theRapid sand filtration plant& swimming pool filteration plant complete all as specified and directed. |
| 47 | Supply and fill pebbles as per existing sample complete all as specified and directed |
| 48 | Note:Item Sr.No.26 to 29 Grading and size of sand shall be tested in the approved laboratory and test results shall be submitted and the rate quoated shall be deemed to include the above provision |
| 49 | M & L for cleaning the Clarifier located at Berthuma Filtration plantby de-watering/Drainout the Clarifier , removing the silt/sludge deposited at bottom, walls complete, cleaning the sump internallyusing high pressure water jetscompletecomplete all as specified and as directed . |
| 50 | M & L for cleaning theFluculator located at Berthuma Filtration plantby de-watering/Drainout the Fluculator , removing the silt/sludge deposited at bottom, walls complete, cleaning the sump internallyusing high pressure water jetscomplete all as specified and as directed . |
| 51 | M&L for cleaning complete Clarifier and fluculator MS plate foot path surface and side pipe railing, Scraping down the old faded existing paint andmaking the surface smooth by filling up the uneven surfaces withputty and scraping with emery sheet, applying two coats of synthetic enamel paint over one coat of red oxide primer, paintingover the area complete all as specified and as directed . |
| 52 | M&L for cleaning complete swimming poolFilter plant and MS pipe line, sluice valve , control panel, pump set, suction sweeper motor, Scraping down the old faded existing paint fromHawk Hill & MRCfilter media cylinder connected pipe lines and CI sluice valves ofmaking the surface smooth by filling up the uneven surfaces withputty and scraping with emery sheet, incuding welding and packing the water leakege portion ,applying two coats of synthetic enamel paint over one coat of red oxide primer, painting over the panel and two coats bituminous paint insideof filter media cylinder including written of the details of water flow direction and capacity of the plant, and date of installed and capacity complete all as specified and as directed . |
| 53 | Carry out Labortary analysis test of treated and unreated drinking water Bacteriogical examination of standard plate count, total oilform, Faecal Coliforms, Faecal Streptococcus and physical examination report to e submitted to department as received from laboratary.Note:The Labortary test shall be carried out at Madhya Pradesh water and drainage board. |
| 54 | M&L for cleaningcomplete inside of wall surfaces (4 sides) of Berthuma filteration plant ( Filter No. 1&2), Scraping down the old faded paint from the inside walls of filteration plant of making surface smooth by filling up the uneven surfaces with putty and scraping with emery sheet, applying two coat of dust proofemultion paint including written of the details of filter plant capacity, Date of cleaning complete all as specified and as directed . |
| 55 | Taking down the unsv existing outdoor type LT panel board from MRC STP control panel and Supplying,installing, testing and commissiongofself supporting totally enclosed mounted on base channel of factory made panel board CPRI approved panel builder factory fabricated made out MS sheet not less than 2.0 mm thick CRCA sheet, dust and vermin proof, hinged smoothly openable front and rear with neoprene rubber gasket, epoxy powder coated including danger plate, earth strip (25x5 mm) connecting provision -02 Nos, ventilation louvers, bottom detachable gland plate complete with suitable size zinc chromium plated nuts, bolts and washers etc panel board suitable for3 phase4 wire 415V, 50Hzwith 160 Amps rated copper bus bar, general construction confirming to IS:8623 (Part I), including mounting on angleiron frame made using angle iron 35 mmx35mmx6mm complete all as specified and as directed .INCOMING(a) MCCBwith micro processor, based trip 4 POLE 415V 160 Amps35KA - 1 NoOUTGOING(a) MCCBwith micro processor, based trip 3P,415V 100Amps35KA - 02 Nos ( Out going) (b) MCBSPN 32 Amps 4 Pole 16 KA - 3 Nos (c) Star delta Starter 3 Ph,415 Volts, suitable for 15/20HP - 02all accessoriesMake L&T/Havellsconforming toIS -60947-4-1(d) Combined multifunctional Digital meter -1 No(e) LED pahse indication lamp for RYB - 1 set(f) Copper bus bar of 160 Amps rating 40x3 & 50 KA three phase and nutural, Panel accessories including panel designation lables, lugs, ferrules for metering/indication enclos, (g) Including internal wiring with multi stradand copper FRLS cable for panel Note:The rate quoated by tender also includes to fix the legs of the panel box in cement concrete M 15 (Nominal mix) using 20 mm mominal size graded crushed stone aggregate 30 cm below GL and the box will be kept nearly 45cm above GL including earth work and allied services complete. |
| 56 | The following the items supply only during the dozing pump repairs :- |
| 57 | Rewinding of Motor 3Ph, 415V,0.5 HP Capacity |
| 58 | Gun metal Non return valve 15 mm dia |
| 59 | UPVC pipe 15 mm dia |
| 60 | Diaphragm as per sample |
| 61 | Oil Suitable for dozing gear box |
| 62 | Mixture pipe |
| 63 | Rubber packing as per sample |
| 64 | UPVC Gate Valve 15 mm dia |
| 65 | S&F 0.50 mm thick galvalume sheet profile pattern precoated coloured having tensile strength 550 Mpa (AZ 150) as in roof covering, fixed with self driving screws complete all as specified and as directed . |
| 66 | S.S&F 0.50 mm thick galvalume sheet pre-coated coloured for ridge or fixing for closing gable truss suitable for profile pattern sheet fixed with self driving screws complete all as specified and as directed . |
| 67 | S&F structural steel work as in tubular trusses including special shaped washercomplete using ERW or induction butt welded tubes conforming to I. S.1161-1979 grade St.-240 complete all as specified and as directed . |
| 68 | M&L for preparation of new steel surfaces of any description over 10 cm width or girth and applying two coats of synthetic enameled paint over a coat of red oxide primer complete all as specified and as directed . |
| 69 | M & L for cement concrete in foundation, filling and mass concrete in type C-2,1:3:6 (Nominal Mix) using 40 mm nominal size graded crushed stone aggregate as in foundation ,filling and mass concrete including excavation and spreadingcomplete all as specified and as directed. |
| 70 | taking downold unserviceable Non return valve and supply& fix new non return valve of size 100mm including all fittings |
| 71 | Material and labour for repair/servicing of Aqua fit dozing system high pressure single head adjustable 5Kg/cm2 max out put dozing pumps electrically operated single phase 220V 50Hz, 960 RPM, 120W including replacement of unservieable spares and recommissiong and testing after repair complete all as specified and as directed.Spares requird for servicing shall be measured and paid seperately under relevent items mentioned below. |
| 72 | Supply only following items of make suitable for existing chemical dozing pumps |
| 73 | Special flexible nylon suction tubing as per site requirementwith standard water pressure minimum 10Kg/cm2 |
| 74 | Suction valve Non-metallic |
| 75 | Injection/check valve non metallic |
| 76 | Chemical dozing motor unit as per sample and existing make complete all as specified and as directed. |
| 77 | Chemical level sensing automatic shout down switch |
| 78 | Rewinding of motor SP, 220V, 120W,960 RPM |
| 79 | Chemical mixer tank UPVC 100 ltrs capacity as per existing sample with connected items like PVC Pipe, branches, gate vale etc complete |
| 80 | Chemical mixer tank UPVC 50 ltrs capacity as per existing samplewith connected items like PVC Pipe, branches, gate vale etc complete |
| 81 | M&L for cutting of vegetation Surrounding installation at various pump House /E&M installation and remove to a distance not exc 50mtr complete all as specified and directed. |