|
| 1 | fo|qr forj.k [k.M&dIrkuxat] vktex<+ ds vUrxZr 10 vn~n 33@11 ds0oh0 fo|qr midsUnzksa esa yxs 33 ,oa 11 ds0oh0 la;[email protected] ds fizosfUVo esuVsaul dk dk;Z foRrh; o\"kZ 2025&26 ¼06 ekg eas 01 ckj½ |
| 2 | budfeax iSusyWork involved-1-Dusting and Cleaning (by Cleaning agent) of panel to obtain desired IR value.2-Cleaning of Breaker, oiling and Greasing of moving parts, work of Tripping and closing adjustment contact resistance measurement of Vaccum Interrupter.3-Checking and testing of closing/tripping machanism of breaker.4-Replacement of weaker insulation control cables/Wiring.5-Cleaning of Jaws and its greasing/oiling.6-Cleaning of Busbar spout and replacement of spout with lesser IR Value.7-Cleaning of PT,CT an CT spout.8-Cleaning of Relays through suitable solvent.9-Adjustment of setting of Relays as required and consequent testing.10-Tighening of power and control cable connections.11-Heating of panel through blower. |
| 3 | vkmVxksbax iSusyWork involved-1-Dusting and Cleaning (by Cleaning agent) of panel to obtain desired IR value.2-Cleaning of Breaker, oiling and Greasing of moving parts, work of Tripping and closing adjustment contact resistance measurement of Vaccum Interrupter.3-Checking and testing of closing/tripping machanism of breaker.4-Replacement of weaker insulation control cables/Wiring.5-Cleaning of Jaws and its greasing/oiling.6-Cleaning of Busbar spout and replacement of spout with lesser IR Value.7-Cleaning of CT an CT spout.8-Cleaning of Relays through suitable solvent.9-Adjustment of setting of Relays as required and consequent testing.10-Tighening of power and control cable connections.11-Heating of panel through blower. |
| 4 | 33 ds0oh0 fLop;kMZ dk dk;ZWWork involved-1-Meggering of lightening arresters fo all 3 phases of all power transformers of the substations.2-Mechanical adjustment of bus side and line side TPMO/Isolator,oiling and greasing of moving parts of ensure smooth operation..3-Mechanical adjustment as required of 33 kv breaker, Oiling and greasing of moving parts to ensure smooth operation.4-Ensure local and remote operation of 33 KV breaker.5-Cleaning of all switchgears. |
| 5 | fo|qr forj.k [k.M&dIrkuxat] vktex<+ ds vUrxZr 10 vn~n 33@11 ds0oh0 fo|qr midsUnzksa ds czsdMkmu dks ,VSUM dj fo|qr vkiwfrZ jh&LVksj djus dk dk;Z& |
| 6 | 11 ds0oh0 fLopxh;j dk czsdMkmu esUVhuasl ¼budfeax ,oa vkmVxksbax½1-Attending flashing caused by any fault or other wise (This includes cleaning through suitable solvent, replacement of damaged CT and spout if required.2-Work on Jaw contact (This includes mechaical adjustment, cleaning and/or replacement of jaws, as required.3-Work on Vaccum Interrupter Bottle (This includes mechanical adjustment, cleaning and or replacement of bottles, as required.4-Work on tripping closing coil (This includes mechanical adjustment, cleaning and or replacement of coil as required.5-Work on tripping clutch (This includes mechanical adjustment, cleaning and/or replacement of clutch as required.6-Replacement of tripping and closing shaft, as required.7-Removal of flashing in Busbar spout and its replacement, as required.8-Removal of flashing in CT spout and its replacement, as required.9-Work on rackout gear and/or jack bush. (This includes greasing, Replacement, as required.10-Replacement of damaged indoor/outdoor cable box of 11 kv cable.11-Replacement of damaged staright through of 11 kv cable.Note- Any one Job as per the amount of work description given in the above job will be considrened as 1 job. All t & p and petty Material/ Consumables viz oil, grease, cloth, cleaning solvent, nut, bolt washer, seals etc shall be arreanged by the firm. |
| 7 | 33 ds0oh0 fLopxh;j dk czsdMkmu esUVhusal-1-Attending breakdown caused by any fault or other wise (This includes.A-Cleaning/Repair/Replacement of CT,PT LA.B-Repairing/Replacement of damages line side and/or bus side TPMO.2-Repairing/Replacement of damaged indoor/outdoor cable box of 33 kv level.3-Replacement of damaged staright through of 33 kv level.Note- Any one Job as per the amount of work description given in the above job will be considrened as 1 job. All t & p and petty Material/ Consumables viz oil, grease, cloth, cleaning solvent, nut , bolt washer, seals etc shall be arreanged by the firm. Please Enable Macros to View BoQ information |