| 1 | Photography work etc. |
| 2 | Excavation in foundation in ordinary soil ( Loam clay or sand) including lift up to 1.5 meter (5ft) and lead upto 30m (100ft) and including filling,watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as direction by the Engineer-in-charge upto a distance of 30m(100ft) from the foundation trenches. |
| 3 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. |
| 4 | Cement concrete with 4cm (1/2\"\") gauge approved stone ballast, approved coarse sand. cement in the proportion 8 : 4 : 1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. |
| 5 | Class-150 brick work in 1:4 cement and fine sand of 1.25 fineness modulus mortar in foundation and plinth including supply of all materials, labour and tools and plants etc. Required for proper completion of the work. |
| 6 | 12mm thick plaster on brick work minimum thickness not less than 10mm with 1part of cement and 4 part of find sand of 1.25 fineness modulus. |
| 7 | RCC work with cement approved coarse sand and 2cm. (3/4\"\") gauge approved stone ballast in the proportion 1:1.5:3 in lintels of doors and windows, excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W.G.I wire.and including necessary cantering and suttering etc and also including supply of all materials,labour and tools and plants etc. required for proper completion of the work. binding wire to be supplied by the contractor free of cost.Si.No.-289 |
| 8 | Mild steel of iron in plain work such as reinforced concrete/ brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage and hooks and authorised over lapping shall be measured. |
| 9 | Earth wrok in filling including excavation of earth cartage 4.00 km distance from site of work ramming, dressing watering compaction etc. complete work. |
| 10 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km (5 miles) from the side of work & including watering ,dressing etc. Rate to include cost of all materials,labour and tools & plants,etc. required for proper completion of the work. |
| 11 | Cement concrete with 4cm (1/2\"\") gauge approved stone ballast, approved coarse sand. cement in the proportion 12 : 6 : 1 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. |
| 12 | Cement concrete with 4cm (1/2\"\") gauge approved stone ballast, approved coarse sand. cement in the proportion 1 : 1.5 : 3 including supply of all materials,labour and tools and plants etc. required for proper completion of the work. |
| 13 | Making construction joint with maxphalt seet board including all material labour and T&P etc. |
| 14 | Supplying and laying of 125 micron polythen including all material, labour and T&P etc. |
| 15 | Providing & fixing display board. |
| 16 | Deduction 5% Please Enable Macros to View BoQ information |