| 1 | AOH PRESSUREPARTS JPL |
| 2 | OverhaulingMobilization and Demobilization |
| 3 | Cup lock scaffolding installation and removal work |
| 4 | Normal scaffolding installation and removal work |
| 5 | Lighting installation and removal including material. |
| 6 | Water washing of Boiler |
| 7 | Boiler pressure parts normal weld joints (Material SA210GR.C) |
| 8 | Boiler pressure partsCritical joints Alloy and SS joints |
| 9 | Re-heater ,SH (COIL) ALIGNMENT |
| 10 | BOILER (FINS & SHIELD ) INSTALLATION AND WELDING |
| 11 | BOILER (TUBE BENDS) Fabrication |
| 12 | BOILER (CASTABLE AND PLASTIC REFRACTORY) Remove & Apply |
| 13 | Boiler Drum Inspection and cleaning |
| 14 | Penthouse/Dead Chamber Inspection and Repair |
| 15 | Structures Repair work (<>) Service |
| 16 | BOILER (CASSET BAFFLE) Remove & Apply |
| 17 | Eco/LTSH (COILS) Instal /Remove |
| 18 | BOILER (<>) Repair SCW BIFURCATION TUBES AT ECO. BOTTOM |
| 19 | BOILER -SAFETY NET INSTALLATION |
| 20 | BOILER ( SEAL PLATE ) Repair |
| 21 | BOTT RING HDR600MW INSPECTION |
| 22 | Water Wall( WIRE MESH ) Remove & Apply |
| 23 | Misc. Works . Cleaning of economizer Ash hopper and Minor Defects attending The Scope of work involves |
| 24 | Inspection of Boiler headers, SH & RH spray nozzles and Liners |
| 25 | SPL.M/P.DEP (MOBILISATION) OH . Thermal Flow Test of Boiler tubes installed in Water Walls & Super heater Coils after Hydro Test: |
| 26 | SERVICING OF SOOTBLOWERS (88 WALLBLOWERS AND 42SOOTBLOWERS ) |
| 27 | SERVICING OF VALVES |
| 28 | MISC.MATERIAL HANDLING & OTHER ASSO.WORK |
| 29 | DEPTT <> MAN.DEP-Skilled Worker (As per requirement ) |
| 30 | DEPTTMAN.DEP-Semi Skilled Workers |
| 31 | DEPTT <> MAN.DEP-Un Skilled Workers |
| 32 | DEPTT <> MAN.DEP-ENGR |
| 33 | Special manpower Requirement AOH |
| 34 | PF Burner -OH |
| 35 | PF Burner - Install/Remove |
| 36 | Wind Box - Cleaning |
| 37 | SOFA ,TILT MECHANISM AND ALL NOZLES TIPS OH |
| 38 | HANGERS INSPECTION AND SERVICING: |
| 39 | EXPANSION INDICATOR |
| 40 | AIR TIGHTNESS TEST |
| 41 | BOILER HYDROTEST 600 MW BHEL BOILER |
| 42 | ACCOMODATION & TRANSPORTATION FOR ALL WORKERS AND EMPLOYEES |