|
| 1 | Repair and replacement of skylight glass at MHU,MDC and Aluminium partition and wooden flooring works at various locations at campus. |
| 2 | Supply and installation of skylight glass with 8mm clear toughened glass with glazing tape and weatherproof silicone. |
| 3 | Supply and installation of skylight glass with 6mm mesh glas with glazing tape and weatherproof silicone. |
| 4 | MS frame with 32x32mm L angle with 2 coat primer and 2 coat enemal paint for sky light base. |
| 5 | Removing old mesh glass and MS frameincluding disposal of material to the appropriate disposal area as per direction of Engineer-in-charge. |
| 6 | Aluminum three track sliding windows With 47x47x1.5mm ThickVertical, Top, Center, 95x47x1.5mm Thick Bottom, Colour Powder Coated, APP and 5mm Clear Glass, C Gare, C Gare Rollers, Handel and Lock and Epdm Black Clip Rubbers. |
| 7 | Aluminium Adjustable Louvers95x47x1.5mm Thick frame, Colour Powder Coated,5mm Clear Glass, C Gare, C Gare Rollers, Handel and Lock and Epdm Black Clip Rubbers. |
| 8 | Aluminum Fixed Frames With 47x47x1.5mm ThickVertical, Top, Center, 95x47x1.5mm Thick Bottom, Colour Powder Coated, APP and 5mm Clear Glass,and Epdm Black Clip Rubbers. |
| 9 | Aluminum Sleek With SS Black Powder Coated Mesh. |
| 10 | Acp Cladding With 4mm Acp Sheet for windows top and bottom gapes. |
| 11 | 3D letters and platform with 32mm WPC CNC cut, All round Deco painting. (PGPEM) |
| 12 | Supplying and laying of engineered wooden Flooring of approved colour & makewith 15 mm thick and 3mm ware layer with matt lacquer finish,brushed surface texture,moisure content 7-9%,Veneer thickness of 3mm thick,contentcore material will be pine,Complies EU E1 formaldehyde emissions, plank dimensions will be 2100 x 185 mm, 2100 x 135mm, 1800mm x 185mm , 1800mm x 135mm fixed to the floor with the adhesives and vapor barrier paper laid over a levelled floor surface including cost of all materials, labour, lead and lift charges and all other incidental charges etc., complete as per directions of engineer in charge of works. |
| 13 | Dismantling and disposal ofExisting wooden Flooring including stacking of serviceable material to the appropriate area inside the campus as per direction of Engineer-in-charge. |