| 1 | PRIMARY RACKS (With IBR certified Isolation Valves and IBR Certified Inconel-625 Cooler Coils) |
| 2 | WET PANEL - ENCLOSED TYPE WALKWAY THROUGH PANEL |
| 3 | DRY PANEL |
| 4 | CHILLER UNIT - 2x100% REDUNDANT - Min. 5 TR rating (With 25% extra Capacity) |
| 5 | CONDUCTIVITY(SPECIFIC, CATION) ANALYSER- SINGLE CHANNEL |
| 6 | CONDUCTIVITY(SPECIFIC) ANALYSER FOR HOTWELL - SINGLE CHANNEL |
| 7 | pH ANALYSER TRANSMITTER- SINGLE CHANNEL |
| 8 | pH ANALYSER SENSOR- SINGLE CHANNEL |
| 9 | DISSOLVED OXYGENANALYSER- SINGLE CHANNEL |
| 10 | DISSOLVED OXYGENSENSOR- SINGLE CHANNEL |
| 11 | SODIUMANALYSER [MULTI CHANNEL(5 CHANNEL)+1 SPARE CHANNEL] |
| 12 | SILICA ANALYSER [MULTI CHANNEL (4 CHANNEL) +1 SPARE CHANNEL] |
| 13 | HYDRAZINE ANALYSER - SINGLE CHANNEL |
| 14 | DEGASSED CATION CONDUCTIVITY ANALYSER |
| 15 | TURBIDITY ANALYSER SINGLE CHANNEL |
| 16 | IRON ANALYSER SINGLE CHANNEL |
| 17 | LOOSE SUPPLY ITEMS AS PER ANNEXURE-A |
| 18 | Mandatory Spares as per Annexure- B - SHS |
| 19 | Mandatory Spares as per Annexure- B - Analysers |
| 20 | COMMISSIONING SPARES- Reagents / Consumables / Calibratiors / Standard Solution as required for commissioning & Handing over of System to Owner |
| 21 | CHEMICAL REAGENTS, CONSUMABLES AND STANDARD SOLUTIONS FOR 18 MONTHS OF OPERATION |
| 22 | ANNUNCIATOR - Microprocessor basedMinimum 96 Points, Window size : 70 mm x 50 mm |
| 23 | O & MMANUALS / DOCUMENTATION CHARGES |
| 24 | SUPERVISION OF ERECTION, TOTAL COMMISSIONING AND HANDING OVER OF SWAS SYSTEM |
| 25 | Price for one line of High Pressure & High Temp. - Primary & Secondary cooling to be considered along with other instruments as per P&ID applicable for the project. |
| 26 | Price for one line of Low Pressure & Low Temp. -Secondary cooling to be considered along with other instruments as per P&ID applicable for the project. |
| 27 | Freight Charges for NTPC Talcher 2 X 660 MW (LUMP SUM) |
| 28 | Freight Charges for NTPC Lara 2 X 800 MW(LUMP SUM) |
| 29 | Freight Charges for NTPC Singrauli 2 X 800 MW (LUMP SUM) |