|
| 1 | Systematic maintenance of track in railway siding for all items as included in the specification para 3.0 to 3.9 |
| 2 | Rectification of damaged track on account of derailment including changing of any no. of rails, points and crossing, sleepers with fittings and fixtures, ballast including aligning, correction of cross levels and packing. (The required material will be supplied by FCI at site of work free of cost. After satisfying the terms and conditions of clause 5 of conditions of contract, if any payment is admissible then only the contractor will be entaitled for the same.) Straight/Curved rack |
| 3 | Re railing operation of \"Derailed\"wagons & Locomotives ( anytype of derailment other than capsized wagons / locomotives). (plants/equipments, like traversing jacks etc., necessaryfor this operation to be arranged by contractor on his own cost) |
| 4 | For four wheel wagon |
| 5 | For eight wheel wagon |
| 6 | Supplying and stacking of approved quality of stone ballast of 50 mm gauge confirming to technical specification and as per direction of Engg-in-charge. |
| 7 | Spreading out of stone ballast from stacked at different locations, including carriage of ballast with in the depot premises to work spot including loading and unloading the ballast, dressing levelling etc as directed by the Engineering in-charge. |
| 8 | Deduction in payment at the rate of 10% of the accepted rate per ETKM per month incase the contractornot adhering to the annual gang routing programmme for track maintenance in the MTF. |
| 9 | Deduct for not picking up of slacks in track, as directed by Engineer incharge without damaging sleepers and fittings duly opening up ballast, gauging, alignment, correcting longitudinal and cross levels,packing,boxing of ballast and dressing the same under track conditions (as per Indian Railways Permanent Way manual para 229) |
| 10 | For PSC Sleeper(BG) |
| 11 | For other than PSC Sleeper(BG) |
| 12 | Deduct for not cleaning & clearing of side drains including disposing of muck beyond railway boundary as per instructions of Engineer in-charge to keep drains clean and clearing cutting etc. |
| 13 | Removal of all types of muck/malba and garbage which includes waste material, animal carcass, cow dung, debris, sweepings etc., from track and dumping/ throwing, as directed by engineer in-charge following all rules/regulations of State/ Central Govt. and Authorised Bodies: |
| 14 | Deduct for not -uprooting of weeds/jungle/dressing including scarifying ballast in entire profile upto toe of ballast on track |
| 15 | Trimming of tree branches coming within 4m of centre line of track & those obstructing views of Curves /LCs/Signal/Indicator at locations in section & station yard , as specified by Engineer in charge including disposal of branches, bushes outside cess/yard. (Note: Girth of more than 30 cm will only be considered as tree) |
| 16 | Supplying and spraying in specified proportion Weedicide Chemical, capable to kill entire weed on track / cess / embankment with all labour, material, tools & plants etc. complete job in all respect. Scientific name of the chemical is Isopropylamine Salt of Glyphosate, in which active ingredient is Glyphosate (41%), colour is light amber to brownish, very low in toxicity and has favourable enviremental characteristics. It will be ensured that no weed growth occurs upto six months period, otherwise respraying shall be done by the contractor |