| 1 | SITE CLEARANCE |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. |
| 3 | 1) Lime Concrete, cement concrete grade M-10 (1:5:10) and below |
| 4 | 2) Cement Concrete Grade M-15 and above and PCC blocks |
| 5 | CEMENT CONCRETE PAVEMENTS |
| 6 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 7 | Providing and laying un-reinforced, dowel jointed, plain cement concrete mix in pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 8 | 1) PCC M-20 |
| 9 | SEWER LINE WORKS |
| 10 | Supplying & fixing 560mm dia opening SFRC manhole frame & cover as per IS : 12592-2002 in existing manholes including grouting the frame in PCC M-15 complete in all respect as directed by the Engineer. |
| 11 | 1) HD-20 |
| 12 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. |
| 13 | 1) In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. |
| 14 | 1) Depth upto 1.5 m |
| 15 | Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP2 class (with s/s ends IS: 458 - 1988 (amended up to date) marked and manufactured through spun process at all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers, Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. |
| 16 | 4) 300 mm internal diameter |
| 17 | Providing at site, lowering & laying in trenches, aligning & jointing of PVC-U pipes (SN 8) as per IS 15328 (amended up to date) and as per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and conveyance of water to site for testing) and commissioning etc complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. |
| 18 | 3) 200 mm Nominal Dia |
| 19 | CARRIAGE OF MATERIALS |
| 20 | CARRIAGE OF MATERIALS (By Mechanical Means): Carriage of Materials by mechanical transport including loading, unloading and stacking :: The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under subhead \"Carriage of Materials\" |
| 21 | 3) Stone, boulders, gravelly material |
| 22 | E) 5 Km |
| 23 | F) Beyond 5 Km upto 10 Km. per Km. |
| 24 | WATER SUPPLY |
| 25 | Providing and making house service connections from water supply distribution HDPE pipe line upto water meter chamber inside the property using HDPE (Class-PE 80) PN 6 composite pipes for upto 5 metre length. The item consisting of composite pipes of HDPE pipe below the ground level and GI class B pipe above the ground level including supply and fixing of ferrules, electro fusion saddle, clamps, rubber sheets, tapping, compression fittings etc, complete including all material, labour, testing and commissioning as per Technical Specifications and as per direction of Engineer. |
| 26 | 1) 20 mm Diameter HDPE below the ground & 15 mm GI pipe class B above the ground |
| 27 | STEEL WORK |
| 28 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: |
| 29 | DRAINAGE (Building) |
| 30 | Constructing brick masonry road gully chamber 50x45x60 cm with bricks of class designation 75 in cement mortar 1:4 (1 cement : 4 coarse sand) including 500x450 mm precast R.C.C. horizontal grating with frame complete as per standard design : |
| 31 | 35.13.1) With bricks Please Enable Macros to View BoQ information |