|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed |
| 2 | P/L of stone soling hand packed in foundations incl carriage |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) |
| 4 | P/L in position Reinforced cement concrete of specified grade excluding the cost of shuttering and centering finishing and reinforcement all work upto plinth level grade(1:2:4 ) with 20mm aggregate |
| 5 | Centring and shuttering incl strutting propping etc and removal of form work for foundation footing bases of columnsFoundation and footing bases of column |
| 6 | Centring and shuttering incl strutting propping etc and removal of form work in suspended floors, beams etc |
| 7 | P/L in position Reinforced cement concrete of specified grade excluding the cost of shuttering and centering finishing and reinforcement all work upto plinth level grade(1:1.5:3 ) with 20mm aggregate |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars |
| 10 | Structural steel welded in built up sections for railing work |
| 11 | Carriage of sand for Avg lead 15 Km |
| 12 | Carriage of Stone aggregate for Avg lead 15 Km |
| 13 | Provision for signboard, Photographes carriage of cement,and unforeseen items.( to be paid as per actual) Please Enable Macros to View BoQ information |