| 1 | Barricating of damaged portion with bamboos/ballies with ropes and red cloth etc all complete. |
| 2 | Dismentling of flexible pavement and disposal of dismantled material up to a 202 lead of 100 m, stacking serviceable and unserviceable |
| 3 | Dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed by engg. i/c. within a distance of 60mtr. |
| 4 | Earth work in surface excavation by mechanical means (Hydraulic excavator)/manual means foundation trenches or drain (not exceeding 1.5m in width or 10sqm on plan), excavated soil and disposal of surplus excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m including dressing and sides and ramming of bottoms, lift upto 1.50m including getting out the all kinds of soil. |
| 5 | Add extra for every additional lift of 1.5m or part thereof in excavation/banking excavated or stacked materials. All kinds of soil (from 1.50-3.00Rmt) |
| 6 | Earth work in surface excavation not exceeding 30cm in depth but exceeding 1.5 m in width as well 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m ,as directed by engg-in-charge:2.1.1 All kinds of soil. |
| 7 | Desilting of covered nala in liquid or mud in foul position including lift up to 1.5m etc all complete. |
| 8 | Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered) Depth exceeding 1.5m but not exceeding 3m. |
| 9 | Dewatering of pond/nala by deisel pump including heir charges of pump, pump operator fuel charges , cartage of pump at site etc all complete. |
| 10 | Making Bundha By Empty Cement Bags (Gunny Bags) Filled With Local Sand & Tightened Using Sutli And Carriage Up Site Including Etc All Complete |
| 11 | Supplying and filling in plinth with sand under under floors, including watering, ramming, cosolidating and dressing complete. |
| 12 | Brick work with common burnt clay (non modular) bricks of class-150 in foundation and plinth in cement mortar 1:4 (1 cement : 4 coarse sand) |
| 13 | 12mm cement plaster of mix : 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement. |
| 14 | Providing, laying, spreading and compacting stone agreegate of specific size to water bound macadam-3 speicfication including spreading in uniform thickness, hand packing, rolling with 3-wheeled steel/vibratory roller 8-10 tonnes in stages to proper grade and chamber, applying and brooming requisite type of screening/binding materials to fill up the coarse aggretgates, watering and compacting to the required density. |
| 15 | Construction of granular sub base (GSB) by providing coarse graded material, spreading in uniform layer with mortor grader on prepared surface, mixing by mixin place method with rotovator at OMC and compacting with viberatory roller to achieve the desired density as per clause 401. |
| 16 | Reinforced cement concrete work in beam, suspended floors, roofs having slope up to 15\" landing, bolconies, shelves, chajjas, lintels , bands, plain, window sills, stair cases and spiral stair cases above plinth up to floor five, level excluding the cost of centering, shuttering, finishing and reinforcemen, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded). |
| 17 | Centering & shuttering including strutting, propping etc and removal of form work (upto 5th floor) : Retaining walls, return walls, walls (any thickness) including attavhed pilasters, buttersses, plinth and string courses fillets, kerbs, and steps etc |
| 18 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all completeupto plinth level. Thermo mechanically treated bars of grade Fe-500D or more. |
| 19 | Construction of gullypit of 0.60x0.60x0.75 m internal size with jali, labour, T&P etc, required for proper completion of work. |
| 20 | Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:4:8 (1 cement : 4 coarse sand (zone-iii) : 8 graded stone |
| 21 | Providing, laying and jointing of 300mm dia R.C.C. NP-2 hume pipe with all charges complete. |
| 22 | Construction of manhole chamber of 0.60x0.60x0.90m internal size with b/w, plaster, cover, C.I. sheet, labour T&P etc required for proper completion of work. |
| 23 | Providing, laying and jointing of 9\" dia S.W. pipe with labour T&P etc all complete. |
| 24 | Making connection of pipe to the existing manhole/sewer line etc all complete. |
| 25 | S/F of inauguration board with granite with padestal etc all complete. |
| 26 | Disposal of surplus earth/malwa upto10.00km distance including loading/unloading of material with all charge complete. |
| 27 | Add 18 % G.S.T. Please Enable Macros to View BoQ information |