| 1 | Carriage of line material from Electricity Store Center, Modinagar to site of work with loading and unloading at both ends on Kachha Packka road Like Earth Rod 03 Nos, Ms Channel 150 KG., MS Angle 30 Kg, Pin Insulator 06 Nos., Stay Set 04 Nos. |
| 2 | Carriage of ST Pole 11 mtrs. Long from Electricity store center, Modinagar/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road. |
| 3 | Carriage of 10KVA to 250KVA from Electricity store center, Modinagar to site of work with loading and unloading at both ends on Kachha Packka road. |
| 4 | Carriage of Cable HT XLPE 3x70 sq mm. from Electricity store center, Modinagar to site of work with loading and unloading at both ends on Kachha Packka road. |
| 5 | Carriage of Outdoor Type Cable Box 3x70 sq mm. & ST TH. 3x70 sq mm. for 3x70 cable. |
| 6 | Erection & Fixing of STP Pole 11 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, Cross Arm holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts. |
| 7 | Mounting, Placing and connecting from LT/HT side of 11KV, 10 to 250KVA T/F as per RESPO Norms. |
| 8 | Laying of Cable with Trunchless Method. (HDD Method) |
| 9 | Road restoration charge for pucca road crossing as per RESPO/Drawing Norms. |
| 10 | Making and filling of 11KV Cable Jointing Kit, Indoor/outdoor type, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms. |
| 11 | Making and filling of 11KV Straight Through, Indoor/outdoor type, after duly plumbing and taping of suitable XLPE Cable, providing, fixing and crimping of proper size good quality lugs, including cost of lugs and tape etc., as per RESPO Norms. |
| 12 | Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops. |
| 13 | Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts. |
| 14 | Grouting of ST/PCC supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials. |
| 15 | Wrapping of barbed wire on 11KV ST/PCC poles as anti-climbing device for a length of 0.9mtrs. Wire pitch/gap 13mm and fixing upper and lower end keeping lower end at a hieght of 2.75 mtr from the ground complete, including providing & fixing of lower end & upper end clamps made of M.S. Flat 40X5mm complete with nuts & bolts and all other required material and T&P. |
| 16 | Laying , Stringing and final sagging of ACSR Weasel Conductor after binding from Insulator, as per RESPO/Drawing Norms. |
| 17 | Providing & Fixing of G.I. pipe 6\"dia Class-B over 11KV 3X70 and 3x120Sq.mm XLPE cable before mounting the cable at double pole. The work includes fitting of clamps, sealing of top and bottom of pipe and one end of pipe is to be burried under earth about 500mm earch including mounting and clamping the cable on double pole structure and making connection with overhead line at both ends. |
| 18 | Providing & Fixing of HDPE Pipe 125/140/160 mm. Dia |
| 19 | Erection & Fixing of 11KV. Fuse set on ST Pole 11mtr long, by providing all required materials, including cost of 11KV Fuse set. |
| 20 | Providing & Fixing of Danger Board, including fixing of all accessories by providing all required materials (like suitable clamps, nuts & bolts etc.) as per RESPO/Drawing Norms. |
| 21 | Providing & Fixing of Number Plate alongwith all required accessories (like suitable clamps, nuts & bolts etc.) as per RESPO/Drawing Norms. |
| 22 | Providing & Fixing Chemical earthing of Transformers Equipment the ground surface where it will be bolted to the M.S. earth strip for connection the earth strip will be welded to the earthing and neutral support, as per RESPO/Norms. |
| 23 | Jumpering work properly as per RESPO/Norms. Please Enable Macros to View BoQ information |