| 1 | Earthwork excavation in foundations trenches extra in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 meters depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 meters. |
| 2 | Excavation of soil using hydraulic exavator and hydraulic tractor trolly including cutting and loading in trolly and transporting to the embankments locations location with all lifts and leads avg leads |
| 3 | Extra for laying earth as per specification for compaction in 20 Cm. layers and dressing including the cost of rolling and watering as per P.W.D specifications. |
| 4 | Dressing of Earth work ( NEW ) |
| 5 | Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing (0 to 1.5 mtr depth) |
| 6 | Dressing and preparation of sub grade for side slopes. |
| 7 | Laying 1:3 (cement: water) cement slurry with cement @ 2.25 kg per sqmt on prepared bed & side slope before laying concrete |
| 8 | Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km including supply ,carriage, of loadind and unloading of material complete in all respect (For Trapozoidal Section and Cup Section of all radius) (for bed & Side Slope) |
| 9 | Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km including supply ,carriage, of loadind and unloading of material complete in all respect (For Trapozoidal Section and Cup Section of all radius) For Coping |
| 10 | Cement concrete lining 75mm thick or less laid mannualy for irrigation channels using cement concrete M-15 with cement contant 325 kg per cum mixed an automatic computerized batching and mixing plant and transported to the site in transit mixers & with an average lead of 1km including supply ,carriage, of loadind and unloading of material complete in all respect (For Trapozoidal Section and Cup Section of all radius) For Sleeper |
| 11 | Dag Belling single kassi stroke minimum 7.5 cm. depth complete in all respect as per design/drawing and PWD specifications |
| 12 | Filling of construction/contraction joints sealing compound including supply ,carriage, of material complete in all respect as per design/drawing and PWD specifications |
| 13 | Extra for Bitumen Painting @ 0.69 kg per Sqmt. supply carriage of material complete in all respect |
| 14 | Providing & laying 150 micron Polyethene Sheet over sleeper |
| 15 | Shuttering for faces of concrete lining on side slopes and bed complete in all respect as per design/drawing and PWD specifications |
| 16 | Making dewatering arrangement by pumping set 4\"\" *4\"\" (Tractor driven) |
| 17 | Earth work of silt clearance of channels and drains Please Enable Macros to View BoQ information |