Tender For Surfacing Work With Providing Laying Spreading And Compaction Of Gsb 15 Cm Thick, Sand Blanketing 100 Mm Thick, Wmm 100 Mm Thick, Wmm 75 Mm Thick, Dbm 50 Mm Thick, Bc 30 Mm Thick, Prime Coat, Tack Coat, Earth Filling In Shoulders And Road Marki, Pungro-Nagaland
TDR : 53064166
Tender Notice
BOQ
37 Days Left
Pungro
Nagaland
Tender For Surfacing Work With Providing Laying Spreading And Compaction Of Gsb 15 Cm Thick, Sand Blanketing 100 Mm Thick, Wmm 100 Mm Thick, Wmm 75 Mm Thick, Dbm 50 Mm Thick, Bc 30 Mm Thick, Prime Coat, Tack Coat, Earth Filling In Shoulders And Road Marki
NAME OF WORK: SURFACING WORK WITH PROVIDING LAYING SPREADING AND COMPACTION OF GSB 15 CM THICK, SAND BLANKETING 100 MM THICK, WMM 100 MM THICK, WMM 75 MM THICK, DBM 50 MM THICK, BC 30 MM THICK, PRIME COAT, TACK COAT, EARTH FILLING IN SHOULDERS AND ROAD MARKING WITH THERMOPLASTIC PAINT 2.5 MM THICK BETWEEN KM 3.00 TO KM 8.00 & KM 14.00 TO KM 19.00 ON ROAD ZINGKI BRIDGE TO PUNGRO TO NHSL SPECIFICATIONS UNDER 89 RCC/15 BRTF UNDER PROJECT SEWAK IN NAGALAND STATE
Sl. No.
Item Description
1
Providing, laying & compaction of150 mm thick (compacted) GSB (Granular Sub Base) conforming to Clause 401 ofMORT&H Specifications for Road and Bridge Works (Fifth Revision)as specified in particular Specifications and notes of Sch ‘A’ and as directed and approved by Engr-In-Charge.
2
Providingto a depth of 100 mm thick (Compacted) sand blanketing, spraying water, compacting with power roller all complete.
3
Providing, Laying and Compaction of 100 mm thick (compacted) WMM (Wet Mix Macadam) layer confirming to grading as per table 400-13 and clause 406 of MORT&H specifications for road and bridge works (fifth revision) and as specified in particular specifications and as directed by Engineer-in-Charge. (One Layer)
4
Providing, Laying and Compaction of 75 mm thick (compacted) WMM (Wet Mix Macadam) layer confirming to grading as per table 400-13 and clause 406 of MORT&H specifications for road and bridge works (fifth revision) and as specified in particular specifications and as directed by Engineer-in-Charge. (Two Layer)
5
Application of Prime Coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer @7.5 Kg per 10 sqm by mechanical means conforming to clause 502 & table 500-03 of MORT&H specifications for Road and Bridge Works (Fifth Revision) as specified in ParticularSpecifications and notes of Sch ‘A’ and as directed and approved by Engr-In-Charge
6
Providing and applying of Tack Coat by using suitable low viscosity paving bitumen of bitumen of appropriate grade @ 2.5 Kg/10 Sqm conforming to table 500-5 of MORT&H specifications for Road and Bridge Works (Fifth Revision) . on existing bituminous surface after cleaning all complete as per Clause 503 of MoRT&H Specifications for Road and Bridge Works (5th Revision)
7
Providing, laying and compaction of 50 mm thick (Compacted) DBM (Dense Bituminous Macadam) layer over WMM Surface with pre-coated stone chips grading confirming to Table: 500-10 and aggregates satisfying the physical requirement of table 500-08 of MORT&H specifications of Road and Bridge Works (Fifth Revision) mixed with minimum 4.5% bitumen (bitumen of appropriate grade as per particular specifications Para 8.2.1) by weight of total mix and 2% filler by weight of total mixgrading requirement conforming to clause 500-09 of MORT&H specifications of Road and Bridge Works (Fifth Revision) complete in all respect and all as specified and directed by Engineer-in-Charge.
8
Providing and Mixing of stone aggregate in Hot Mix Plant, laying mix BC by paver and30 mm thick (Compacted) BC (Bituminous Concrete) layer Pre-coated aggregate physical requirement/grading/mix composition confirming to Table: 500-16 and aggregates satisfying the physical requirement of table 500-17 of MORT&H specifications of Road and Bridge Works (Fifth Revision) mixed with minimum 5.4% bitumen (bitumen of appropriate grade as per particular specifications Para 8.2.1) requirement as per Clause 507 of MoRT&H Specifications for Road and Bridge Works (5th Revision)
9
Road Marking with Thermoplastic Paint (2.50 mm thick) conforming to Section 803 of MoRT&H Specifications for Road and Bridge Works (5th Revision) and IRC:35-2015
10
Earth work in berm filling with selected earth free from roots etc spreading in layers not exceeding 30 cm including watering, rolling & finishing to required slopeconforming to clause 305 of MORT&H Specifications for Road and Bridge Works (Fifth Revision)and notes of Sch ‘A’ and as directed & approved by Engr-In-Charge
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.