| 1 | Supply of SMD 500W LED Floodlight fixture with System efficacy of 130 lm/W or more . Luminaire shall be made up of Aluminium Extrusion housing with PC/Borosilicate glass lens. Luminaire should be moduler. LM 80-08 compliant LEDs from reputed makes such as Nichia/Cree/ Bridgelux/ Manlux/ Osram/Seoul should be provided and high Power LED of 3W to 5W should be used. LED must be of ceramic base type. Luminaire shall be with IP66 and IK5 protection. Luminaire must be available with beam angle of 10/15/45Deg. The LED shall be compliant with LM80-08 standard with L70 life of 50,000 Hrs tested at maximum current +/-10% tolerance. The LEDs used should be with CCT of 5700 K and CRI of Minimum 70. Driver will be potted type, Integral / Non Integral type Constant Current operated driver with range 100-305V AC. Driver Efficiency > 90% & 4KV internal surge protection with additional 10KV SPD, Power factor greater than 0.95 and total harmonic distortion (THD) of less than 10% should be integral to the luminaire. Operating temperature range: -10deg C to +45deg C +/-10% tolerance. Driver shall provide ultra low ripple current of < 3%. Compliance to Indian Standards of IS10322 Part 5 / Sect 5:1967; EN IEC 55015:2019; ENIEC 61000-3-2:2019; EN 61003-3-3:2013; EN 61547:2009, EN 61347-2-13:2014; EN IEC:62384/IS:16104 |
| 2 | Supply of 12M (Top of headframe) fixed head frame stadium High Mast with close (Monkey) Ladder complete with all accessories, designed for mounting up to 14 nos. X 500W LED floodlights and the wind loading as per IS 875 (Part III) for Delhi, with recommended safety factors. Supply of Foundation bolt sets for above High Masts complete with anchor plates and template. Unloading, Shifting, stress fitting, mounting of head frame and other accessories and installation thereof on existing foundations with suitable capacity main and auxiliary crane, adhering to all safety protocols. Proper alignment, orientation and levelling of High Mast is an integral part of this activity |
| 3 | High Masts Foundations - Design and construction of open raft type foundation for High Masts with \"M25\" grade concrete and High grade steel reinforcement. The foundation shall be designed as per the safe soil bearing capacity at the location, considering the bending moments and other forces expected to be transferred on to the foundation. Fixing of foundation bolt assembly and provision of HDPE pipes for copper flexible cables is an integral part of this work and includes all material, labour and T&P, shuttering and curing, etc. This item includes back-filling, compacting of soil, removal of surplus earth and restoration, as applicable |
| 4 | Aviation obstruction LightSITC of Low intensity LED type aviation obstruction luminaries on high masts. |
| 5 | Earthing |
| 6 | Earthing with G.I. earth plate including accessories, and providing masonry enclosure with cover plate having locking arrangement and with charcoal/ coke and salt as required. |
| 7 | Control Panel |
| 8 | Supplying, erecting, testing and commissioning outdoor duty floor mounted weather proof IP65 feeder pillar with lockable outer door) and sloping roof. |
| 9 | Master Control Panel |
| 10 | 1 No 200A TPN MCCB1 no 96mm x 96mm multi parameter digital meter with LCD display for voltage & current with suitably rated CTs and MCB protection.1 set of three phase indicating lamps with suitable protection. |
| 11 | Pole Control Panel |
| 12 | 1 no. 40A TPN MCB15 nos.10A/16A/32A SP MCBother accessories |
| 13 | Cables |
| 14 | Supply of 4C - 6 Sq.mm, Aluminium Armoured Power Cable of 500 Meter for connection between the Master Control Panel to Pole Control Panel and Laying of Cable |
| 15 | Laying of aluminium armoured power cable of 1.1 KV grade as given in 7.1 direct in ground including excavation, sand cushioning, and refilling the trench etc as required. |
| 16 | Supply of 3C - 2.5 Sq.mm, Copper Cables for Connecting from Pole Control Panel to the Luminaries |
| 17 | Laying and connection of unarmoured Copper Control cable, PVC insulated, as mentioned in 7.2 |
| 18 | Generator (50 kva CPCB IV+ three phase silent DG set conforming relevant to IS) |
| 19 | Installation, testing and Commissioning of poles with |
| 20 | 1. Erection of poles2. Installation of Lights on the poles3. Adjustment of Lights4. Control Panel Installation5. Testing6. Commissioning |