| 2 | Removal of existing plastering on brick masonary in lime or cement mortar above 3 mtr height including stacking the useful materials for reuse and removing the debris within 50m lead. |
| 3 | 16 mm thick cement plaster over fly ash Brick Masonery with C.M ( 1:6) over work including cost, conveyance, royality of all materials etc complete as direction by EIC. |
| 4 | Supplying, fitting and fixing of M.S.door & window including screws as may be required etc with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect as direction by EIC. |
| 5 | Filling Foundation and plinth with sand including cost, conveyance, royality etc complete as directed by the Engineer-in-charge. |
| 6 | Cement concrete with C.C ( 1:4:8) with 40 mm size metal including cost, conveyance, royality etc complete as directed by the Engineer-in-charge. |
| 7 | Brick work withFly ash bricks 25 cm x 12 cmx8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance +8 percent in cement mortar (1:6) in Superstructure including cost, conveyance, royality etc complete as direction by EIC. |
| 8 | Supplying, fitting & fixing of vitrified Tiles approved make in floors & wall laid on 20 mm thick cement mortar (1:4) (1 cement : 4 course sand) and filling joints with slurry including cost of all materials, labour T&P etc. required for the work all complete incl. rubbing as per direction of the Engineer-in-charge |
| 9 | Painting two coats to the wall surface by using 100% premium Acrylic emulsion paint to interior wall (distmper)surface over a coat of primer with water bond cement primer after preparing the surface smooth by applying putty punning with Synthetic Acrylic wall putty including finishing the surface smooth by sand papering in all heights etc. complete in all respect.any approved shade including cost conveyance royality etc complete as per direction of EIC |
| 10 | Wall painting two coats with 100% Acrylic emulsion paint (1st quality) exterior grade(weather coat) over a coat of primer with water bond cement primer applying putty punning with Synthetic Acrylic wall putty in all heights with all scaffolding and staging charges including cost, conveyance, taxes of all materials, cost of all labours, T & P, sundries etc. as required for the work complete as per direction of EIC. |
| 11 | Painting 2 coats with any enamel paint on new work over primer including cost of paint & primer , labour. over a coat of priming including all costs of labour ,Paint, primer, brushes and putty required for the work etc complete and as per direction of Engineer-in-charge. |
| 12 | Supplying, fitting & fixing of Granite Stone of approved make in floors laid on 20 mm thick cement mortar (1:4) (1 cement : 4 course sand) and filling joints with slurry including cost of all materials, labour T&P etc. required for the work all complete incl. rubbing as per direction of the Engineer-in-charge |
| 13 | Provision of RCC Ramp at entrance corriddor with SS Railing ,tile ,kerb stone etc including cost of all materials, labour T&P etc. required for the work all complete incl. rubbing as per direction of the Engineer-in-charge |
| 14 | Supplying, fitting and fixing of M.S. hanger work including screws as may be required etc with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect as direction by EIC. |
| 15 | Provision of internal electrification work with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect as direction by EIC. |
| 16 | Provision of cemical earthing with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect as direction by EIC. |
| 17 | Provision of internal PH Sanitary work with cost, conveyance, taxes of all materials, labour, T&P etc. required for the complete in all respect as direction by EIC. Please Enable Macros to View BoQ information |