| 1 | Demolishing cement concrete manually by mechanical means including disposal of material within 50 meters lead as per direction of Engineer - in - charge. Including cost of cement, Mainland River sand and stone metal, coat of all other materials, all labour charges, transportation charges, minor tools, labour cess GST etc. Complete.a) Nominal concrete 1:3:6 or richer mix (I/C equivalent design mix) |
| 2 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering andshuttering - All work up to plinth level 1:1.5:3(1 cement, 1.5 Coarse sand ( Zone-III), 3 graded stone aggregate 20 mm nominal size from mainland quarry) but including cost of all labour charges, transportation charges, GST, labour welfare cess, and minor tools etc complete. |
| 3 | Providing and fixing of 25 mm dia G.I Mooring rings with all accessories on berthing side of Jetty etc., including cost of 25 mm dia G.I mooring ring, 30 mm dia G.I U Bolt & nuts, G.I Base plate & washer plates etc., transportation charges of all materials to work site, all labour charges & minor tools, cost of GST & Labour welfare cess etc., complete. [Size: GI Mooring ring - 25 mm dia, Outer to outer dia 195 mm, G.I U bolt - 25 mm dia & length 400 mm, G.I base plate 250 x 250 x 15 mm, G.I washer plate 125 x 125 x 10 mm]. |
| 4 | Painting two coats of synthetic enamel black paint to bollards of 90T/30T/10T twincapacity including cost of paint, brushes, all labour charges, minor tools, GST, and labour welfare cess., etccomplete. |
| 5 | 90 T Capacity Bollards |
| 6 | 30 Ton/ 10 Ton Capacity Bollards |
| 7 | Providing and laying 12mm cement plaster of mix 1:4 (1 cement, 4 Mainland river sand) including cost of cement, mainland river sand, all labourcharges, cost of minor tools, transportation charges, GST, labour welfare cess etc complete. |
| 8 | Providing and Fixing of Mini giant tyre fenders of one set containing one tyre in position as directed by EIC including making holes, fixing eyelet with G.1 flange and nipple, cutting and tying of G.I wire ropes/Chain and fixing the same to tyres, including cost of Giant tyres, G.I wire ropes, wire grip, flanges and nipples, but including cost of labour charges transportation charges of all materials to worksite, cost of minor tools etc complete. |
| 9 | Providing and laying C.C 1:1.5:3 with 20 mm size stone chips (one cement, one and half river sand & three stone chips of size 2 cm graded) in all CC works as directed by the EIC, cost of centering & shuttering charges which will be paid separately, but including cost of cement, stone chips 20 mm size and river sand, screening and washing of both the aggregates, mixing concrete, conveying the concrete, placing in position, consolidation with vibrator curing, all labour charges, transportation charges of all materials to work site, cost of minor tools & plants, hire charges of mixer machine and vibrator, cost of GST & Labour welfare cess etc., complete. |
| 10 | Providing form work including centering shuttering so as to give rough finish strutting and propping etc. height of propping and centering below supporting floors to ceiling not exceeding 4m and removal of the same for in situ reinforced concrete and plain concrete work including cost of all materials, all labour charges, minor tools, GST, labour welfare cess etc, complete. |
| 11 | Distempering with dry distemper of approved brand and manufacture (one coat) and of required shade on old work, over and including priming coat of whiting to give an even shade over old cement surface, preparation of surface including cleaning, scraping of exiting painted surface, cost of distemper, brushes, transportation charges, scaffolding arrangements, all labour charges, minor tools etc |
| 12 | Painting with Synthetic enamel paint of approvedbrandand manufacture to give an even shade as per the direction of EIC, including cost of paint, brush & other materials, all labour charges, GST,labour welfare cess, minor toolsetc complete. |