| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc., complete - - Upto 2.00m Depth |
| 2 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc., complete - Open Earth Work Excavation |
| 3 | Supply and filling in foundation with Filling Sand in layer of 15cm thick well water rammed to consolidation including cost and conveyance of Stone Dust to site incluidng labour charges etc., complete as per standard specificataion |
| 4 | Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication. |
| 5 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation - Plinth Beam |
| 6 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom slab of RCC boxing, etc. |
| 7 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of crushed stone sand (M - Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials) - Upto Basement |
| 8 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of crushed stone sand (M - Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials) - Ground Floor |
| 9 | Supply and fabrication of steel required for all RCC items of works involved in the schedule, cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as as per design given and specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc complete as per standard specification |
| 10 | Brick work in CM 1:5 (one cement & Five sand) using II class ground moulded bricks of size 9\"X43/8\"X 23/4\" standard specification including finishing, curing, etc., complete complying with standard specification (Masonry projections wherever necessary for obtaining required elevation shall be done without extra cost) - Ground Floor |
| 11 | Special ceiling plastering in all floors and finishing the exposed surface of RCC items of work such as slab, beam, sunshade, facia, canopy slab, staircase waist slab, landing slab etc., with cement mortar 1:3 (One cement and three sand) 10mm thick including hacking the surfaces and providing cement mortar nosing, beading for sunshade, staircase, step, landing slab etc., including neat finishing and curing etc., complete complying with standard specification and as directed by the departmental officers. |
| 12 | Supply and fixing of M.S Grills with Doors and Windows with one coat of Red oxide with Primer including all costs such as welding, grinding and fabrication charges, cost and conveyance of all materials to site etc,complete as per standard specification. |
| 13 | Painting two coats of newly plastered wall surface with approved cement paint over cement plastered wall surface, ceiling and including preparing the surface, clean removal of dirt and including necessary plaster of paris putty wherever required and cost of painting materials, brushes, preparation of surfaces and scaffolding charges etc., complete complying with standard specification and as directed by the departmental officer |
| 14 | Painting the new iron work with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat and including cost of painting materials, brushes, putty, preparation of surfaces and scaffolding charges etc., complete complying with standard specification and as directed by the departmental officer. |
| 15 | Providing Through Vertical Joint with 15mm space filled with bitumenous compound running from bottom of foundation upto the top of parapet wall in C.M 1:3 (one cement and three sand) as directed etc,complete as per standard specification. |
| 16 | Provision for GST 18% Please Enable Macros to View BoQ information |