| 1 | Dismantling cement concrete 1:3:6 or richer mix including disposal of dismantled materials,.Including cost of all labour charges, minor tools, Labour welfare cess, GST etc, complete. |
| 2 | Earth work Excavation in foundation trenches in saturated soil for column and plinth etc, in all type of soil with a lead up to 100 mtr and lift up to 1.5 mtr including stacking the excavted earth not more than 3 mtr from the edge of excavation and then returning the stacked soil in 15 cm layers when required in plinths and sides of the foundation, etc, including cost of all labour charges, minor tools, GST,LWC etc, complete. |
| 3 | Supplying and filling in plinth with Quarry dust under floors including, watering , rammimg consolidating and dressing including quarry dust, cost of transportation charges of all material to work site, all labour charges, GST, LWC, minnor tools etc, complete. |
| 4 | Providing and laying cement concrete 1:3:6 (one cement, three mainland river sand and six stone metal of 40mm size of local quarry) for below footing, plinth beam, etc as directed by the EIC, including cost of nominal centering & shuttering charges, cost of cement, mainland river sand, stone metal, screening & washing of both the aggregate, mixing, placing, curing, GST,LWC,etc,complete. |
| 5 | Providing form work including centering & shuttering so as to give a rough finish, strutting and propping etc, and removal of the same from reinforced cement concrete and plain concrete work as directed by the EIC, including cost of centering and shuttering, all LWC, GST, cost of binding materials, cost of transportation charges of all material to work site, cost of ballies, cost of minor tools, etc, complete. |
| 6 | Providing and laying RCC 1:1.5:3 with 20mm size stone chips (one cement, one and half mainland river sand & three stone chips of size 2 cm graded) in all RCC works as directed by the EIC, including cost of cement, stone chips and mainland river sand, screening and washing of both the aggregates, mixing concrete, conveying the concrete, placing in position, consolidation with vibrator, curing, all labour charges, transportation charges of all materials to work site, cost of minor tools, hire charges of mixer machine and vibrator, GST, LWC etc,complete. |
| 7 | Providing and fixing Tor steel reinforcement for RCC work including cutting, bending, bindingand placing in position cost of binding wire, minor tools etc, complete. The rate is inclusive of consumable items and GST & LWC. |
| 8 | Providing and laying 12mm cement plaster of mix 1:4 (1 cement, 4 mainland river sand) including cost of cement, river sand, all labour charges, cost of minor tools, transportation charges, scaffolding charges, GST, LWC etc, complete. |
| 9 | Cement concrete flooring 1:2:4 (1 cement,2 Pulverised Stone Sand, 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry, etc., compete.40mm thick with 20 mm nominal size stone aggregate. |
| 10 | Providng and laying in position cement concrete of specified grade excluding the cost of centering and shuttering, including cost of cement, stone aggregates, pulverised sand, all labour charges, cost of minor tools, transportation charges, GST, LWC, etc, completeAll work up to plinth level.1:2:4 (1 cement, 2 mainland river sand and 4 graded stone aggregates 20 mm nominal size). |
| 11 | Steel work in built up tubular trusses including cutting , hoisting, fixing in positionand applying a priming coat of approved steel primer , welded and bolted including special shaped easgers , cost of all materials, all labour charges, welding charges , scaffoldings charges, minor tools , transportation charges , GST , labour welfare cess etc, complete. |
| 12 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability of hot & cold water supply including all CPVC plain & brass threaded fitting this includes jointing of pipes & fittings with with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of EIC. External work conforming to IS 5382 leaving 10 mm gap for thermal expansion. The rate is inclusive of consumable items and GST, LWC etc, complete |
| 13 | i) CPVC Pipes 100 mm dia |
| 14 | ii) CPVC Pipes 150 mm dia |
| 15 | Two coats of old work painting with synthetic enamel colour paint Ist quality of approved brand by EIC over steel surface, prepration of surface including cleaning, scraping of the existing painted surface, cost of paint, brush, scaffolding arrangements, transportation charges of all materials to worksite all labour charges, minor tools, including of GST, LWC, etc, complete. |
| 16 | Providing filter media as directed by the EIC, including cost of material used in filter media , all labour charges, transportation charges of all materials in work site, cost of minor tools and plants etc, complete. |
| 17 | i) Coarse aggregate |
| 18 | ii) Mainland river sand |
| 19 | Supply of labours as and when required for shifting & attending other miscellaneous work which is not measurable as directed by the EIC, including cost of labour charges, minor tools, LWC, GST, etc, complete. |
| 20 | a) Un-Skilled Mazdoor |
| 21 | Conveying of dismantling asphalt/debries / earth / rubbish materials by truck and dumping the same withina lead of 5km as directed by the EIC including cost of labour charges, hire charges of truck including POL and operator , minor tools , GST , LWC , etc, complete. |
| 22 | Providing weep holeswith 100/110 mm dia. PVC pipes where ever required for free flow of water including cost of material, all labourcharges, minor tools etc. complete. |
| 23 | Providing and laying of GI pipes of various sizes with fittings of ISI mark, including cost of pipe cost of all labour charges, transportation charge of all materials, LWc, GSt and cost pf minor tools , etc complete.IS Code : 1239(Part -1) |
| 24 | a) 50mm dia GI pipe |