| 1 | Remuneration for Local Staff (inclusive of per Diem allowance) |
| 2 | PROFESSIONAL Staff |
| 3 | Team Leader cum Senior Highway Engineer (01 Nos.) (01x09) |
| 4 | Senior Bridge/Structural Engineer (01 Nos.) (01x05) |
| 5 | Tunnel Design Expert (01 Nos.) (01x05) |
| 6 | Geologist (01 Nos.) (01x06) |
| 7 | Geotechnical cum Material Engineer (01 Nos.) (01x06) |
| 8 | Senior Survey Engineer (01 Nos.) (01x07) |
| 9 | Quantity Surveyor / Documentation Expert (01 Nos.) (01x06) |
| 10 | Land Acquistion Expert (01 Nos.) (01x10) |
| 11 | Utility Expert (01 Nos.) (01x04) |
| 12 | Traffic and Safety Expert (01 Nos.) (01x04) |
| 13 | Environmental Specialist (01 Nos.) (01x03) |
| 14 | Sub-Professional Staff: (one sub-professional to be a fresh graduate) |
| 15 | Assistant Highway cum Pavement Engineerr (01 Nos.) (01x10) |
| 16 | Survey Engineer (01 Nos.) (01x10) |
| 17 | Assistant Quantity Surveyor/ Documentation Expert (01 Nos.) (01x10) |
| 18 | Support Staff (Fixed Rates) |
| 19 | Office Manager (01 Nos.) (01x10) |
| 20 | Typist (02 Nos.) (02x10) |
| 21 | Office Boy (01 Nos.) (01x10) |
| 22 | Night Watchman (01 Nos.) (01x10) |
| 23 | Transportation (Fixed Costs) |
| 24 | The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.A. For use of Consultants |
| 25 | Duty Travel to Site (Fixed Costs) |
| 26 | All Trips |
| 27 | Office Rent (Fixed Costs) |
| 28 | The rent cost includes maintenance, cleaning, repairs, etc. |
| 29 | Office Supplies, Utilities and Communication (Fixed Costs) |
| 30 | Office Supplies Drafting, |
| 31 | Supplies, Computor |
| 32 | Running Costs |
| 33 | Domestic and International Communication |
| 34 | Office Furniture and Equipment (Fixed costs) |
| 35 | Office Furniture and Equipment |
| 36 | Reports and Document (Fixed costs) |
| 37 | Monthly Report (03 sets) |
| 38 | Inception Report & QAP (03 Copies) |
| 39 | Environment and Social Impact Screening Report (04 Copies) |
| 40 | Draft Feasibility Report (04 Copies) |
| 41 | Final Feasibility Report (06 Copies) |
| 42 | Strip Plan with L.A. Reports (06 Copies) |
| 43 | Draft LA and Clearances I Report (04 Copies) |
| 44 | Final LA and Clearances I Report (04 Copies) |
| 45 | Draft Environmental Assessment report & RAP (04 Copies) |
| 46 | Final Environmental Assessment report & RAP (06 Copies) |
| 47 | Draft Detailed Design Report & Drawings etc.(04 Copies) |
| 48 | Draft EMP (04 Copies) |
| 49 | Draft Bidding Documents (04 Copies) |
| 50 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.(06 Copies) |
| 51 | Final EMP (06 copies) |
| 52 | Final Bidding Documents (06 Copies) |
| 53 | Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each) (09 Copies) |
| 54 | LA & Clearances II Report (06 Copies) |
| 55 | Survey and Investigation |
| 56 | A.Topographic Survey (Fixed Rate) |
| 57 | Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer |
| 58 | Detailed topographic surveys using mobile/ aerial LiDAR or better technology |
| 59 | B. Investigation (Fixed cost) |
| 60 | Road and bridge Inventory |
| 61 | FWD Test and Pavement Evaluation |
| 62 | Roughness survey |
| 63 | Axle Load Survey |
| 64 | Material Survey and Investigation |
| 65 | Sub-grade Investigation |
| 66 | Traffic Survey |
| 67 | Socio-economic & Census Survey/Studies |
| 68 | Land Acquisition Studies |
| 69 | Any other investigations/surveys |
| 70 | **Sub-Soil Investigation (Boring) |
| 71 | a) Boring in all type of soils (other than hard rock) |
| 72 | b) Boring in hard rock |
| 73 | c) Geophysical investigation (ERT &SRT) |
| 74 | Net Work Survey and GPR |
| 75 | Network Survey of the existing Highways as a repository for civil work as per directions from Authority. |
| 76 | GPR Survey for detection of underground utilities |
| 77 | Cost of supply and fixing Boundary Pillars |
| 78 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum ) |
| 79 | Land Acquisition Team including support staff and logistics/transportation |
| 80 | Ex-Land Revenue Inspector/Officer or equivalent (01 Nos.) (01x8) |
| 81 | Ex-Kanoongo/ Girdwar or equivalent (01 Nos.) (01x8) |
| 82 | Ex-Patwari or equivalent (01 Nos.) (01x8) |
| 83 | Typist (02 Nos.) (02x8) |
| 84 | Peon (01 Nos.) (01x8) |
| 85 | B. Logistics for Land acquisition Team |
| 86 | Computer including necessary peripherals (02 Nos.) (02x8) |
| 87 | Printers (02 Nos.) (02x8) |
| 88 | Vehicles (Bolero or equivalent) withmonthly running limit of 4000 km (01 Nos.) (01x8) |