| 1 | Earth work cutting in ordinary soil including ramming and dressing the surface to required slows and also including 1.5M, lift and 30 M lead in all complete. site up to 10 km distance. (SR. NO. 251) |
| 2 | Providing and laying cement concrete in 1:6:12 (1 cement :6 Coarse sand : 12 graded stone aggregate 40mm nominal size) including supply of all materials, labour and T&P etc. required forompletion of work and curing complete, including cost of form work. In Foundation and floors. (PWD SOR 2022-23, Chepter-5, Item No. 273 ) |
| 3 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2022-23, Chepter-5, Item No. 5.1 ) |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,abutments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Above plinth level upto fifth floor lable (PWD SOR 2022-23, Chepter-5, Item No. 5.2(ii) |
| 5 | Earth work in filling in ordinary soil excavation to be in the form regular pits note excluding 0.5M in depth and earth work embankment to be in 20 Cm layers including ramming and dressing the surface to required slows and also including 1.5M, lift and 30 M lead in all complete. site up to 10 km distance.(As per Analysis of Rate) |
| 6 | Class-150 (Non Modular) brick work in 1:5 Cement and Fine sand mortar in foundation and plinth including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. (Fine sand not less than in 1.25 FM) (PWD SOR 2022-23 Chapter No-06 Item No. 6.1 A spec. No. 6.1.1 A) |
| 7 | M-150 B/W in 1:4 Cement and coarse sand mortar mortar in super structure including supply of all materials, labour and tools and plants, etc. required for proper completion of the work. |
| 8 | 12mm Cement plaster with cement mortar in proportion of 1:4 cement & fine sand ( Dholpur sand) (Not less than in 1.25 FM) of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm in girth and finished even and smooth. (PWD SOR 2022-23, Chepter-13, Item No. 13.1) |
| 9 | Providing and laying cement concrete in 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work. PWD 4.1.3 |
| 10 | M.S or Iron work in plain work such as reinforced concrete or reinforced brick work (When not included in and an over all rates) brought to required shape as necessary of the work and including the suply of steel and its wastage bend, hooks and authorized over lapping shall be measured upto floor to level. (As per Analysis of Rate) |
| 11 | Mild Steel Iron \"Z\" section windows and ventilators excluding cost of glass panes of but including supply of all materials,its fabrication, nuts and bolts, holdfast, labour and T&P required for proper completion of work as per direction of Engineer-in-charge and also including cost of handles,stays etc, inall respect at site of work. (PWD SOR 2022-23, Chepter-10, SI No. 18 Item No. New ) |
| 12 | Finishing walls with Putty approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work. (PWD SOR 2022-23, Chepter-15, SI No. 31 Item No. New ) |
| 13 | Finishing walls with water proofing cement paint of approved make such as Super snowcem, Durocem, Robiance, Guttucem, Supercem quality and of required shade on under coated wall surface (One coat) over and including one coat white cement primer to give and even shade after thoroughly after brushing the surface . . (PWD SOR 2022-23, Chepter-15, Item No.660+661) |
| 14 | Painting two coat over priming coat (but excluding cost of priming coat) on steel and other metal surfaces upto 10cm width or girth or small articles not exceeding 0.10 Sq.M. in area with superior synthetic enamel such as Luxol 3, Hi gloss Apcolite, Superlac, Dulux specified brushing to give and even shade and including the cleaning the surface of all dirt, dust and other foreign matter sand papering and scrapping including cost of all materials, labour, tools andplants etc. required for proper completion of work.. (PWD SOR 2022-23, Chepter-15, Item No. 2(19.29)+642) |
| 15 | M.S Speciefication Board including painting & writing |
| 16 | Construction of Silla patt board using brick work and granite stone …………………….. All Complete. |
| 17 | Add 18 % G.S.T Please Enable Macros to View BoQ information |