| 1 | Taking down existing water proofing treatment with tarfelt including cement Plaster / HP tiles/from roof or wall surfaces such as parapets / RCC fins of any type in any thickness including demolition of RCC tank/PVC tank and re-fixing the same with all required plumbing fittings like tank Nipple, float valve, tank cover, gate valves etc as per requirement of site and prepare the surface for new treatment complete all as specified and directed by Engr-in-charge.Note :- Cost of removal of debris or excavated material out of the defence line at govt approved dumping area deemed to be included in unit rate and no extra cost will paid to the contractor against the same. |
| 2 | M&L for surface preparation & Cleaning the surface and made free of dirt, foregin particles laitance followed by grinding all protrusions to make surface modulated and including cement platering 20mm thick in cement mortar 1:4 incl mixing of liquid water proofing compound as per manufecturer instruction on surfaces of floor etc finished even and smooth without using extra cement and making strips of size 30cm x 30cm.Thereafter, inspection for cracks on the surface caused by thermal expantion contraction. Cutting the grooves with suitable cutter machine in \"V\" groove filled with Repair mortar/Mircroconcrete/General purpose grout as recommended propertionaly as per recommendation of manufacturer. Making of Gollas at all the corners with Polymer modified mortar (1:4) Cement :Sand with 3.5% Acylic of Cement weight , Supplying and applying High buildwaterproofing coating based on pure hydrophobic polyurethane cold applied of spray /brush applied membrane with and elongation of 280% and tensile strength of 2.7 N/mm2 as per ASTM D 2370, crack bridging ability of 3mm, hardness (shore A scale) 80, solar reflectance of 84% as per A ASTM E903-96, SRI of 106, capilary absorption of 0.01kg/m2 h0.5 as per EN 1062-3, adhesion must be of ˃ 2.0 N/mm2 as per EN 1542, artificial weathering must be passed as per EN 1062-11 temprature resistance must be in between -300C to +900C, no leakage upto 5 bars of water pressure as per DIN 1048 mm min 88% solid content. The system includes final top coat of high build waterproofing coating based on pure hydrophobic polyurethane white in color application in 2 coats with a total min consumption of 1.5 Kg per SQM in ratio 60% 40% in both coats respectively over a coat of epoxy primer 1:1:2 (Resin:hardner:water) with a min consumption of 0.2 Kg per SQM. Application should be given by company for the product on company letterhead, complete all as specified and directed. |
| 3 | Demolition of brick work or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars,drainsetc, but excluding ashlars facings, dressed stone work and precast concrete articles.complete all as spd and direcetd. |
| 4 | M&L Brick work with sub class ‘B’ bricks straight or curved on plan exc 6m mean radius built in CM 1:4.complete all as spd and directed. |
| 5 | Taking down cement plaster up to 4th storey bldg ht.on Brick/stone walls and raking out joints, hacking for key, scrubbing down with water built in cement mortar.complete all as specified and directed. |
| 6 | Material and labour for 15 mm thick rendering in CM 1:6 on fair face of wall or on concrete surfaces finished even and smooth without using extra cement complete all as specified as directed by Engineer-in-Charge. |
| 7 | M&L for rendering 15mm thick in CM 1:4 on fair faces of brick work or over roof concrete surfaces mixed with integral water proofing compoundfinished even & smooth without using extra cement up to 4th storey bldg ht.complete all as specified and directed. Note : WPC shallbe measured & paid seperately. |
| 8 | M&L rendering 05 mmthick in cement plaster 1:3 on ceiling surface finished even and smooth without using extra cement.complete all as specified and directed. |
| 9 | Supply only integral liquid water proofing compound ISI markedcomplete all as specified and directed. |
| 10 | M&L for preparation of newly plastered surfaces of walls,Applying two coats of distemper with oil emulsion over a coat of primer over a thin layer of wall care putty including necessary formwork scaffolding required upto the 4th storycomplete all as specified and as directed. |
| 11 | M&L for Preparation of new plastered surfaces and applying two coats of exterial emulsion paint on walls including a thin layer of wall care putty,necessary formwork scaffolding required upto the 4th story complete all as specified and directed. |
| 12 | M&L Prepration of new surfaces of ceiling and apply three coat of white wash on surface of ceiling.complete all as spd and directed. |
| 13 | Demolition of cement concrete (unreinforced) any description and in any position, not otherwise specifically provided for, complete all as specified and as directed by Engr-in-charge.Note :- Cost of removal of debris or excavated material out of the defence line at govt approved dumping area deemed to be included in unit rate and no extra cost will paid to the contractor against the same. |
| 14 | Rendering 10mm thick in CM (1:3) on sunken concrete floor surfacesmixed with integral water proofing compoundfinished even & smooth with using extra cement complete all as specified and as directed by Engr-in-charge. |
| 15 | M & L for polymer modified bituminous elastometeric water proofing coating @ 0.60 kg per sqm in two layers for sunken portion of toiletcomplete all as specified and directed. |
| 16 | M/L Plain cement concrete (1:5:10) type E-2 using 40mm graded stone aggregate as in foundation filling and mass concrete in sunken floors all as specified. |
| 17 | M & L 25mm th PCC 1:2:4 type B-1 (using 12.50mm graded sone Agg) as in sub base, Floors, Paving complete all as specified. |
| 18 | M&L for colored non skid ceramic tiles7to 8 mmthick, area of each tileexc 0.11 sqm but n exc 0.18 sqm in floors etcset and jointed in neat cement slurry and pointed in colored cementover and incl 15 mm thick screed bed orbedding layers of cement mortar 1:6 (including hakcking of floors) to matchShade, pattern, laying etc of tiles in repair as directed at site. |
| 19 | M&L Vitrifieddark shade /double charged /ultracharged tiles double charge9 to 10 mm thick (Square or rectangular ) polished , area of each tilesn exc 0.36 sqm, in floors in repair,set and jointed in neat cement slurry and pointed in colored cementover and incl 15 mm thick screed bed orbedding layers of cement mortar 1:4 (including hakcking of floors) to matchShade, pattern, laying etc complete all as specified and directed by engr in charge. |
| 20 | S&F in repairs Vitreous China squatting pan, `Orrisa\" pattern, size 580 x440 mm white, with integral foot rests with trap(including flushing cistern & flush pipe) complate all as spd and directed by Engr-in-charge. |
| 21 | S&F in repaired vitreous china wash down water closet pan ( pedestal pattern ) white complete including ‘P’ or ‘S’ trap , seat cover andflushing cistern, brackets, flushing pipeetccomplete all as specified and directed. |
| 22 | S&F steelgrating doom 125mm dia with waste hole etc complete all as spd and directed. |
| 23 | S & F PVC (SWR) pipes single socketed in any length with rubber ring joints in trenches bore of pipe 110 mm with PVC clamps and saddles including taking down existing (SGSW/PVC) pipe and fittings complete all as specified and directed. |
| 24 | S & F PVC (SWR) pipes single socketed in any length with rubber ring joints trenches bore of pipe 75 mm with PVC clamps and saddles including taking down existing (SGSW/PVC) pipe and fittings complete all as specified and directed. |
| 25 | S & F PVC (SWR) pipes single socketed in any length with rubber ring joints at walls bore of pipe 110 mm with PVC clamps and saddles including taking down existing (SGSW/PVC) pipe and fittings complete all as specified and directed. |
| 26 | S & F PVC (SWR) pipes single socketed in any length with rubber ring joints at walls bore of pipe 75 mm with PVC clamps and saddles including taking down existing (SGSW/PVC) pipe and fittings.complete all as specified and directed. |
| 27 | S & F PVC (SWR) door bends of any radius bore of pipe 110 mm complete all as specified and directed. |
| 28 | S & F PVC (SWR)door bends of any radius bore of pipe 75 mm complete all as specified and directed. |
| 29 | S & F PVC (SWR)junction single(single T)equal or unequal with access door bore of pipe 110 mm complete all as specified and directed. |
| 30 | S & F PVC (SWR)junction single(single T)equal or unequal with access door bore of pipe 75 mm complete all as specified and directed. |
| 31 | S & F 110mm bore PVC (SWR) vent cowl complete all as specified and directed. |
| 32 | S & F 75mm bore PVC (SWR) vent cowl complete all as specified and directed. |
| 33 | PVC (SWR)branch piece (single Y) equal or unequal 110mm bore complete all as specified and directed. |
| 34 | PVC (SWR) floor trap 75mm dia , plain with grating including jointing with solvent cement.complete all as specified and directed. |
| 35 | PVC (SWR) reducers 110mm bore.complete all as specified and directed. |
| 36 | Dismantling unservicable /cracked water tanks and removing from sitecapacity exe 250 ltr n.exe 500 ltr complete all as spd and direcetd. |
| 37 | Description all as per Item no 36 above but1000 Ltrs capacity complete all as spd and direcetd. |
| 38 | Supply and fixing in repairsRotational moulded polythene water storage tanks (cylindered vertical closed top ) hoisted and fixed in position all as spd in SSR Part –I of capacity of tanks 500 ltr complete all as spd and direcetd. |
| 39 | Discreption all as per Item no 38 above but1000 Ltrs capacity.complete all as spd and direcetd. |
| 40 | S&F in repairBall 20mmPVC float valves,high pressure,with polythene float and flynut complete,screwed for iron pipe or brass ferrule and fixed.complete all as spd and directed. |
| 41 | S&F in repair PVC Tank cover (thread type) for 500/1000 lit capacity complete all as spd and direcetd. |
| 42 | Taking down chowkhats or frames not exc. 1.5 sq. m each with shutters (without taking off shutters from the frames) complete all as spd and as directed.Note:- Including make good the Jam of window/Door to receive new door/window by brick work,plaster and matching finishes as required also no extra payment should be made to the contractor against the same. |
| 43 | Taking down Chowkats or frames exc 1.5 sq. m but n exc 4 sq m each with shutters (without taking off shutters from the frames) complete all as spd and directed Note:- Including make good the Jam of window/Door to receive new door/window by brick work,plaster and matching finishes as required also no extra payment should be made to the contractor against the same. |
| 44 | S&F Powder coated aluminium (minimum thickness of powder coating 50 micron) frame work for doors,windows, ventilators and partitions (Fixed portions) with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size,including necessary filling up the gaps at junctions, i.e. at top,bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing/ paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-Charge. |
| 45 | S&F Powder coated aluminium (minimum thickness of powder coating 50 micron) for shutters of doors, windows & ventilators including providing and fixing hinges/ pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber/neoprene gasket required with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing/ paneling, C.P. brass/ stainless steel screws.includinng taking down existing complete all as per architectural drawings and the directions of Engineer-in-charge. |
| 46 | S&Fanodised Aluminium grill (anodised transparent or dyed to required shade according to IS: 1868 with minimum anodic coating of grade AC 15) of approved design/pattern, with approved standard section and fixed to the existing window frame with C.P. brass/ stainless steel screws @ 200 mm centre to centre, including cutting the grill to proper opening size for fixing and operation of handles and fixing approved anodised aluminium standard section around the opening including EPDM rubber, includinng taking down existing, all complete as per requirement and direction of Engineer-in- charge. |
| 47 | S&F PVC roller not exceeding 40mm dia fixed to aluminium sliding window shutter with necessary clip or screw etc complete all as spd and directed |
| 48 | S &F 5.5mm thick, ordinary quality and glazing with rouber beading, joining cleat etc in squar n exc 0.5 sq. m in each pane complete all as specified and as directed by Engr-in-charge. |
| 49 | Supply and fixingin repair stainless steel .wire cloth 0.36 mm nominal dia of wire and avg wide 1.40 mm aperture oftinned tacks of galvanised wire stapleto steel windows/fixed with wooden beads of 2nd class HW to wooden doors/windowsall as spd. |
| 50 | S&F 4.8mm thick sheet figured glass,pin head type quality along with oil putty all around the glass edges n exc 0.50 Sqm in each pane and fixed to Aluminium framed work , as lovered for ventilator complete all as specified and as directed. |
| 51 | Excavating in post holes (or similar holes) each n exc 0.5 cum, getting out in soft/loose soil, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm, complete all as specified and as directed by Engineer-in-Charge. |
| 52 | M&L PCC in foundations, filling and mass-concrete type D2 (1:4:8) using 40 mm graded stone aggregate complete all as spd and directed. |
| 53 | Dismentling of wrought iron or mild steel work such as agle ironfencing post and similar type work orany description not other wise provided complete all specified and directed |
| 54 | M&L forPre-febricated Structural steel work in tubular trusses including special shaped washer etc. complete using ERW,Square,angle and rectangular section with induction butt welded tubes conforming to I. S.1161-1979 grade St.-240 complete all as specified and directed by Engineer-in- Charge.Note:- Design and pattern (Ornamental & Special design) should be approved by GE before execution of work and no extra cost will be paid to the contractor by the department against the same. |
| 55 | M&L Mild Steel sections confirming to FE-410-W as in Framed work as in doors, gates of angles or other section withgusset plates, railsetc including necessarycutting, drilling, welding etc complete all as per directed by Engr- in charge |
| 56 | S&F for Mild steel plates (plain or chequered) channels, square cut or notched (ordinary and counter sunk) forming holes, without any attachment Fe 410 -W (Gde-E- 250) quality-A complete all as specified. |
| 57 | Dismantling of asbestos cement sheets, corrugated or semi corrugated etc in roof covering complete all as spd and direcetd. |
| 58 | S& F in repairs Pre-painted galvalume aluminium zinc coated corrugatedsheet (including pre-laminated guard film) 0.50mm thick of an colour having tensile strength of 550Mpa as in roof covering/cladding in any shape (Curved shape or Plan Shape as per direction of GE and no extra payment will be paid to contractor against the same)/size as per user requirement to roof, wall, fixed with self tapping screws.complete all as spd and direcetd.Note:-1.Contractor have to fixed the sheet upto 40 feet hight including necessory scaffolding or mechanically as per site requirement and no extra payment will be made to the contractor against the same. |
| 59 | Surface dressing of loose and soft soilnot exceeding 15 cm deep and getting out in soft/loose soil with help required resources and made it in proper level to receive hardcore,pcc,interlocking tile etc.complete all as spd and directed by Engr-in-charge. |
| 60 | M&L for Hardcore of gauge n exc 63 mm depositing , spread and levelled in layers n exc 15 cm thick watering and ramming to true surface with broken stone or boulders complete all as spd and directed by Engr-in-charge. |
| 61 | M&L for 100mm thick PCC 1:2:4 type B-1(Using 20mm graded crushed stone aggregate) as in floor,hard standing surfaces finished even and smooth without using extra cement including use and waste of formwwork fair or rounding or chamfered of exposed edges all as specified and directed. |
| 62 | M&L for Preparation of new or untreated steel surface of any description exc. 10 cm. in width or girth and applying two coats of synthetic enamel paints, over a coat of red oxide zinc chrome primer, complete all as specified and directed by Engr-in-charge. |
| 63 | M&L Prepration of old decorated surfaces of ceiling incliuding scraping of old flakes with the help of mechenical /elcterical sander ,washing down with help of water and apply one coat of white wash on surface of ceiling,necessary formwork scaffolding required upto the 6th story complete all as specified and directed. |
| 64 | M&L for prepartion and scrapping down of old decoated surface of wall with mechanical/elctrical sander and washing down the surfaces with the help of water completely and apply one coat of oil bound distemper of any tint on walls and filling gaps with putty so as to provide smooth surface,the surface shall be even and smooth, free from any undulation as directed by engr-in-charge. |
| 65 | M&L for complete removal of existing treatment on walls including preparation of old decorated surface of wall ,applying two coats of oil bound distemper paint on walls over a coat of primer with mechenical sprayer followed by roller and filling gaps with putty to make surface upto desired finish as app by Eng-in-charge.complete all as spd and directed.Note: Each layer of OBD shall have agap of 08 Hrs till previous layer has dried up and work has to be executed through company employee ,before all Make and executing agencey shall have the app of GE. |
| 66 | M&L for prepration of new/old surfaces of wall and apply 2-3mm wall care cement based putty (internal and external as per ground requirement) ,necessary formwork scaffolding required upto the 4th story as specified and directed |
| 67 | M&L for preparation of old decorated wooden surface,applying one coats of synthetic enamel paint on wooden surfaces including necessary filling material as required at site to make the surface smooth and even complete all as spd and directed by Engr-in-charge. |
| 68 | M&L for preparation of old decorated surface of steel,applying one coats of synthetic enamel paint on steel surfacesincluding necessary filling material as required at site to make the surface smooth and even complete all as spd and directed by Engr-in-charge. |
| 69 | M&L for Anti-termite treatment at points of contact of wood work,plaster,concrete surface by chemical emulsion (in oil or kerosene based solution) @ 0.5 litre/hole by drilling 6mm dia holes at a downward angle of 45 degree at 150mm centre to centre and sealing the same complete all as spd and directed.Note : Depth of hole to be measured for the payment to contractor. |
| 70 | SCHEDULE \"A\" PART-II (Schedule of credit) Credit amount of Rs (Refer schedule of credit) for retrieved material mentioned in Sch \"A\" Part-II of Tender documents in PDF form will be deducted offline during acceptance of tender of lowest bidder. |