| 1 | NOTE:- (Applicable for all parts/items/):- The bidders/contractorsare advised to read tender document, all drawings & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. |
| 2 | Schedule \"A\" Part-I(SOLID WASTE MANAGEMENT WORKS INCLUDING CIVIL WORKS, PLANTS, MACHINERIES, ELECTRICAL, MECHANICAL, AREA DRAINAGE, SEWAGE DISPOSAL, ROADS, PATH, COMPOUND WALL, GATE, FIRE FIGHTING, ETC. WITHIN AND INCLUDING THE PERIPHERY OF COMPOUND WALL) |
| 3 | Design, procurement, construction, commissioning, solid waste management facility for daily guaranteed Acceptable Waste of 20 tonnes at 90% probability confidence level and probable future expansion of 25% for 10 years of the contract period (for a population of 50000) with fully automated dirty materials recovery facility (MRF) with AI enabled and PLC controlled screening, shorting, separation of recyclable/ non recyclables/ RDF/ Inert from the solid waste and monitoringthrough SCADA complying the Solid Waste Management Rules, 2016 including creating assets, operation, maintenance and service for 10 years and shall comprise as under: -(a) Preparation and finalisation of Detail Project report(b) The space for stacking of solid waste of minimum 2 days.(c) Disposal of the waste materials out of the Cantonment/ defence area without any extra cost to the Department and the submission of No Objection Certificate for disposal of the waste materials in case it is asked by the department.(d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of pre-engineered shed.(e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge.(f) Design, prepare architectural/ structural drawing, supply, transportation, construction of Admin Block with conference room, Guard House, Wash room (both male and female), change room (both male and female), rest room, various storage, processing are, dispatch area, etc.(g) Design, fabrication, supply, transportation, installation of Solid Waste Management Plant including feeding hooper, conveyor belts, trammel screening machine, magnetic separator, shredder machine, balling machine, organic waste composer, air blower, solid waste incinerator.(h) Design, supply, transportation, installation, commission and testing of Diesel Engine Generator Set. The fuel shall be supplied by the contractor during the operation, maintenance and service period. |
| 4 | Srl Item No 1.001 Continued......(i) Design, prepare architectural/ structural drawing, supply, transportation, construction of garages, compound wall of height 2.4 metre, barbed wire fencing of height 0.6 metre above the compound wall, gates, roads, area drainage, sewage disposal, internal electrification, inter water supply, firefighting arrangement, area lighting.(j) Obtain statutory clearance from Government.(k) Maintain, operate, including repairing, replacing, etc. plants and the infrastructure created for 10 years after creating the assets. The contractor shall have full ownership of the materials extracted from solid waste. No royalty shall be charged by the Government.(l) The contractor shall bear the cost of electricity at prevailing rates however the electricity shall be supplied by the department(m) The rates quoted are inclusive of comprehensive maintenance and the payment schedule shall be as under: -(i) After Finalisationof detail project report- Nil(ii) After Creating assets - 70% of the quoted amount (As per the Yard stick approved by CWE for intermediate period)(iii) After completion of 1 year of comprehensive maintenance: 72% (iv) After completion of 2 year of comprehensive maintenance: 74% (v) After completion of 3 year of comprehensive maintenance: 76% (vi) After completion of 4 year of comprehensive maintenance: 79% (vii) After completion of 5 year of comprehensive maintenance: 82% (viii) After completion of 6 year of comprehensive maintenance: 85% (ix) After completion of 7 year of comprehensive maintenance: 88% (x) After completion of 8 year of comprehensive maintenance: 92% (xi) After completion of 9 year of comprehensive maintenance: 96% (xii) After completion of 10 year of comprehensive maintenance: 100% |
| 5 | Srl Item No 1.001 Continued......The retention money shall be as applicable. |
| 6 | Lump sum price worked out by the tenderer for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part-II(Ref pre-priced schedule attached separately) |
| 7 | Lump sum price worked out by the tenderer for EXTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III(Ref pre-priced schedule attached separately) |
| 8 | Lump sum price worked out by the tenderer for SITE CLEARANCE, EXCAVATION AND EARTH WORKS as listed in Schedule ‘A’ Part-IV(Ref pre-priced schedule attached separately) |
| 9 | Schedule \"A\" Part-V(ARBORICULTURE) |
| 10 | M & L for preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed, within a lead of 50 m, lift up to 1.5 m complete all as specified and as directed. Note: Cost of sludge, manure or extra earth shall be included in the quoted rate. |
| 11 | M & L for digging holes of 1.2 metre dia and 1.2 metre depth in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts including anti-termite treatment by digging pits 30 cm deep and 4 cm dia, 6 to 7 holes around the tree using chemical emulsion at the rate of 1.5 liter per hole in two time or more application to get the trees free from termite infection chemicals used Chlorpyriphos 20% EC in the ratio of 1% concentration including supplying, stacking and planting of Azadirachta indica ( Neem ) plant of height 120-130 cm in big polybag of size 25 cm complete all as specified and as directed. Note: The contractor’s quoted rate shall be inclusive of excavation, earthworks, manure, sludge, anti-termite treatment, supplying of good earth from outside MD land if not found suitable from the excavated earth, etc. |
| 12 | M & L for digging holes of 1.2 metre dia and 1.2 metre depth in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts including anti-termite treatment by digging pits 30 cm deep and 4 cm dia, 6 to 7 holes around the tree using chemical emulsion at the rate of 1.5 liter per hole in two time or more application to get the trees free from termite infection chemicals used Chlorpyriphos 20% EC in the ratio of 1% concentration including supplying, stacking and planting of Gulmoharplant of height 120-130 cm in big polybag of size 25 cm complete all as specified and as directed. Note: The contractor’s quoted rate shall be inclusive of excavation, earthworks, manure, sludge, anti-termite treatment, supplying of good earth from outside MD land if not found suitable from the excavated earth, etc. |
| 13 | M& L for plantation of shrubs, hedge etc. at the site including watering and removal of unserviceable material including shrub/ hedge plants of any type and of height 60-75 cm in earthen pots of size 20 cm complete all as specified and as directed. |
| 14 | M & L for digging holes of 1.2 metre dia and 1.2 metre depth in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts including anti-termite treatment by digging pits 30 cm deep and 4 cm dia, 6 to 7 holes around the tree using chemical emulsion at the rate of 1.5 liter per hole in two time or more application to get the trees free from termite infection chemicals used Chlorpyriphos 20% EC in the ratio of 1% concentration including supplying, stacking and planting of Ashoka Regional of height 120-130 cm in big polybag of size 25 cm complete all as specified and as directed. Note: The contractor’s quoted rate shall be inclusive of excavation, earthworks, manure, sludge, anti-termite treatment, supplying of good earth from outside MD land if not found suitable from the excavated earth, etc. |
| 15 | M & L for digging holes of 1.2 metre dia and 1.2 metre depth in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts including anti-termite treatment by digging pits 30 cm deep and 4 cm dia, 6 to 7 holes around the tree using chemical emulsion at the rate of 1.5 liter per hole in two time or more application to get the trees free from termite infection chemicals used Chlorpyriphos 20% EC in the ratio of 1% concentration including supplying, stacking and planting of Keenu of height 120-130 cm in big polybag of size 25 cm complete all as specified and as directed. Note: The contractor’s quoted rate shall be inclusive of excavation, earthworks, manure, sludge, anti-termite treatment, supplying of good earth from outside MD land if not found suitable from the excavated earth, etc. |
| 16 | M & L for digging holes of 1.2 metre dia and 1.2 metre depth in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts including anti-termite treatment by digging pits 30 cm deep and 4 cm dia, 6 to 7 holes around the tree using chemical emulsion at the rate of 1.5 liter per hole in two time or more application to get the trees free from termite infection chemicals used Chlorpyriphos 20% EC in the ratio of 1% concentration including supplying, stacking and planting of Jamun of height 120-130 cm in big polybag of size 25 cm complete all as specified and as directed. Note: The contractor’s quoted rate shall be inclusive of excavation, earthworks, manure, sludge, anti-termite treatment, supplying of good earth from outside MD land if not found suitable from the excavated earth, etc. |
| 17 | M & L for digging holes of 1.2 metre dia and 1.2 metre depth in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts including anti-termite treatment by digging pits 30 cm deep and 4 cm dia, 6 to 7 holes around the tree using chemical emulsion at the rate of 1.5 liter per hole in two time or more application to get the trees free from termite infection chemicals used Chlorpyriphos 20% EC in the ratio of 1% concentration including supplying, stacking and planting of Peepal plant of height 120-130 cm in big polybag of size 25 cm complete all as specified and as directed. Note: The contractor’s quoted rate shall be inclusive of excavation, earthworks, manure, sludge, anti-termite treatment, supplying of good earth from outside MD land if not found suitable from the excavated earth, etc. |
| 18 | M & L for digging holes of 1.2 metre dia and 1.2 metre depth in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts including anti-termite treatment by digging pits 30 cm deep and 4 cm dia, 6 to 7 holes around the tree using chemical emulsion at the rate of 1.5 liter per hole in two time or more application to get the trees free from termite infection chemicals used Chlorpyriphos 20% EC in the ratio of 1% concentration including supplying, stacking and planting of Mahogany plant of height 120-130 cm in big polybag of size 25 cm complete all as specified and as directed. Note: The contractor’s quoted rate shall be inclusive of excavation, earthworks, manure, sludge, anti-termite treatment, supplying of good earth from outside MD land if not found suitable from the excavated earth, etc. |
| 19 | M & L for digging holes of 1.2 metre dia and 1.2 metre depth in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts including anti-termite treatment by digging pits 30 cm deep and 4 cm dia, 6 to 7 holes around the tree using chemical emulsion at the rate of 1.5 liter per hole in two time or more application to get the trees free from termite infection chemicals used Chlorpyriphos 20% EC in the ratio of 1% concentration including supplying, stacking and planting of Sheesham tree of height 120-130 cm in big polybag of size 25 cm complete all as specified and as directed. Note: The contractor’s quoted rate shall be inclusive of excavation, earthworks, manure, sludge, anti-termite treatment, supplying of good earth from outside MD land if not found suitable from the excavated earth, etc. |
| 20 | Complete maintenance after physical completion of plants/Hedge/grass by weeding hosing, saucer making once in every week for plants/Hedge once in every 10 days for carpet grass/country grass/doob grass, burmuda grass, prunning dried branches once in every week, depositing the material at place as directed by Engr-In-Charge and planting the new plants in place of dead plants of same species and height tuning with dods wherever required by replacing the dead patches of grass with the same grass as required without extra cost to the deptt andall as directed by Engr-In-Charge.Note:(i) Manure and pesticide required for maintenance of plant under this items shall be arranged by the contractor at his own cost and rate of the same shall be deemed to be included in the unit rate quoted against this items(ii) Scope of maintenance shall be as specified in Ph-II.(iii) Work against this item will be commenced only after completion of plantation of trees, plantation of grass and plantation of hedge & shrubbery. |
| 21 | Schedule \"A\" Part-VI(MISCELLANEOUS WORKS) |
| 22 | M & L for earthing complete with galvanised steel plate earth electrode 600 mm X 600 mm X 6 mm thick, buried directly in ground (earth pit not less than 2.25 metres deep below ground level) with top edge of the plate not less than 1.5 metres below normal ground level, connected to earthing lead of 32 mm X 6 mm galvanised mild steel strip by means of bolts, nuts, check nuts and washers of galvanised iron from earth plate to test point upto 7.5 metre including all as shown in electrical plate No. 3 of SSR Part I (2009) including necessary concrete chamber in cement concrete M15 (Nominal Mix) using 20 mm nominal size coarse aggregate, precast RCC cover slab in cement concrete M15 (Nominal mix) using 20 mm nominal size coarse aggregate of size 40 cm X 40 cm X 5 cm reinforced with 8 mm dia TMT bars @ 150 mm c/c both ways with one handle for lifting made out of 8 mm dia bar, GI funnel, GI wire mesh filter, 20 mm dia GI pipe medium grade for watering, 40 mm dia GI pipe medium grade for protection of earthing lead, charcoal or coke and salt in alternate layers including necessary excavation and earth work in any type of soil/ strata and testing complete all as specified and as directed. |
| 23 | Supply and fix metal oxide surge arrester without gap for AC system as per IEC 60099-4: 2014, outdoor type, polymer housing, single column and single phase construction, distribution class, medium duty, nominal discharge current 5 kA, repetitive charge transfer rating (Qrs) more than 0.2 C, thermal charge transfer rating (Qth) more than 0.7 C, nominal system voltage 11 kV, highest system voltage 12 kV, rated voltage of arrester 9 kV, continuous operating voltage 7.2 kV, temporary overvoltage (10.50 kV for 1 s, 9.90 kV for 10 s, 9.35 kV for 100 s), rated short circuit current 20 kA, low short circuit current 600 A, insulation withstand level (lightning impulse voltage 1.2/ 50 µs) 75 kV, lightning impulse residual voltage (8/20 µs) at nominal discharge current maximum 22 kV, high current impulse withstand capability (4/10 µs) 65 kA, minimum creepage distance 300 mm complete all as specified and as directed. |
| 24 | Supply and laying double wall corrugated pipe (DWC), non-metallic, Resistance to Compression : Type 450, Resistance to Impact: Normal, Resistance to Bending : Pliable, Resistance to External Influence: Ingress Protection : IP 67, Resistance against Corrosion : Without Protection, Resistance to Flame Propagation : Non Flame Propagating, Nominal outside diameter 110 mm, minimum inside dia 82 mm conforming to IS 16205 (Part 24) : 2017 complete all as specified and as directed. |