| 1 | Clearingweeds in thefoot path for laying of paver block at southern side of Hibiscus road including disposal of uprooted vegetation with in lead of 50 m including labour,tools etc.complete. |
| 2 | Supplying and filling savudu soil to the trenches of varying depth 100 mm to 170 mm ( providing and laying of paver block)of local earth by mechanical transport upto a lead of 3km also including ramming and wateringin layers not exceeding 20 cm in all as per relevant specification, drawings and as directed, including all labour, tools, tackles, equipments, fuel, etc., complete. |
| 3 | Filling ofhard granite broken stone 6 mm to 12.50 mmin thebottom 40 mm thickoflayer all as per relevant specification, drawings and as directed, including all labour, tools, tackles, equipments, fuel, etc., complete. |
| 4 | Brick work in C.m 1:6 for foundation and basemant all as per relevant specification, drawings and as directed, including all labour, tools, tackles, equipments, fuel, etc., complete. |
| 5 | Plastering in C.m 1:6 , 12 mm thick for foundation and basemant all as per relevant specification, drawings and as directed, including all labour, tools, tackles, equipments, fuel, etc., complete. |
| 6 | Providing and laying of 60 mm thickfactory made cement concrete interlocking paver block of M-35 grade made by block making machine with strong vibratory compaction of approvedsize, design and shape laid in required colour and pattern over and including 40 mm thick compacted bed of 6 mm to 12.5 mm jelly layer and filling savudu soilforfoot path all as per relevant specification, drawings and as directed, including all labour, tools, tackles, equipments, fuel, etc., complete.. |