|
| 1 | [10.30.3]Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 3. Dark shade pigment using ordinary cement [Through Rate] |
| 2 | [11.68.3]Applying priming coat: 3. With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works [Through Rate] |
| 3 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate] |
| 4 | [11.96.1]Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade: 1. New work (Two or more coats applied @ 1.43 litre/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) [Through Rate] |
| 5 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] |
| 6 | [26.19.1]Maintenance of shrub for one year including weeding, hoeing, plant protection, watering from Deptt. source, application of 10 ml chlorpyriphos four times in a year , 0.0289cum FYM each, 20 gm urea and 20 gm DAP twice, replacement of casualty etc. with same species and same age of plant 1. Individual shrubs [Through Rate] |
| 7 | [26.53]Watering of trees, shrubs, ground covers etc. through tractor tanker of 5000 litre capacity including cost of water with all leads and lifts and including cost of water, fuel ,filling of tanker, watering at site with all leads and lifts as per direction of officer - in-charge.(for 1 No. Tree 30 litres water per plant 27 no . irrigations per year , shrub 20 litres/ per plant 27 no irrigations per year , lawn 2.5 cm layer or 25 litre/sqm 50 no irrigations per year , ground cover / flower bed / rose bed 2.5 cm layer or 25 litre/sqm 40 no. irrigations per year , hedge for 2.5 cm layer or 25 litre/sqm 40 no. irrigations per year , Pot plant 3 litre water daily 250 irrigations per year [Through Rate] |
| 8 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate] |
| 9 | [6.39.1]Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete. 1. 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] Please Enable Macros to View BoQ information |