|
| 1 | Supply of 8 Way Three Phase Neutral Distribution Board (TPN DB) as per technical specifications |
| 2 | Supply of 4P 63A MCB as incomer as per technical specifications |
| 3 | Supply of 4P 63A RCCB, 30mA as per technical specifications |
| 4 | Supply of 1P 10A MCB as per technical specifications |
| 5 | Supply of 1P 16A MCB as per technical specifications |
| 6 | Cable glanding with heavy duty single compression brass cable gland and end termination with heavy duty long barrel tinned Copper lugs as per technical specifications (Supply Part)Cable Size: 4C x 16 sq.mm |
| 7 | Wiring for light point / fan point / exhaust fan point / call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit / casing and capping, with modular switch, modular plate, suitable PVC / GI box and earthing the point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable etc as required. (Supply Part)Note: Wiring upto 5 mtr length from switchboard to point |
| 8 | Wiring for group controlled (looped) light point / fan point / exhaust fan point / call bell point (without independent switch etc.) with 1.5 sq. mm FRLS PVC insulated copper conductor single core cable in surface / recessed PVC conduit / casing and capping, and earthing the point with 1.5 sq. mm FRLS PVC insulated copper conductor single core cable etc as required. (Supply Part)Note: Wiring upto 5 mtr length in between two adjacent points. |
| 9 | Wiring for circuit / submain wiring along with earth wirewith FRLS PVC insulated copper conductor, single corecable in surface / recessed mediumas per technical specificationsPhase: 1 x 1.5 sq.mmNeutral: 1 x 1.5 sq. mmEarth: 1 x 1.5 sq.mmConduit: 20 mm(Supply Part) |
| 10 | Wiring for circuit / submain wiring along with earth wirewith FRLS PVC insulated copper conductor, single corecable in surface / recessed medium as per technical specificationsPhase: 1 x 2.5 sq.mmNeutral: 1 x 2.5 sq. mmEarth: 1 x 2.5 sq.mmConduit: 20 mm(Supply Part) |
| 11 | Supply of 16A socket, 16A switch & 3M flush mounting metal box with plate and frame as per technical specifications |
| 12 | Supply of 20W motion sensing LED light fitting as per technical specifications |
| 13 | Supply of 20W LED light fitting (integral type) as per technical specifications |
| 14 | Supply of 8-10W LED light fitting (integral type) as per technical specifications |
| 15 | Supply of 35W, 1200mm BLDC Ceiling Fan as per technical specifications |
| 16 | Supply of 300mm LD exhuast Fan as per technical specifications |
| 17 | Installation of 8 Way Three Phase Neutral Distribution Board (TPN DB) as per scope of work |
| 18 | Installation of 4P 63A MCB as incomer as per scope of work |
| 19 | Installation of 4P 63A RCCB, 30mAas per scope of work |
| 20 | Installation of 1P 10A MCB as per scope of work |
| 21 | Installation of 1P 16A MCB as per scope of work |
| 22 | Cable glanding with heavy duty single compression brass cable gland and end termination with heavy duty long barrel tinned Copper lugs as per scope of work (Installation Part)Cable Size: 4C x 16 sq.mm |
| 23 | Wiring for light point / fan point / exhaust fan point / call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit / casing and capping, with modular switch, modular plate, suitable PVC / GI box and earthing the point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable etc as required. (Installation Part)Note: Wiring upto 5 mtr length from switchboard to point |
| 24 | Wiring for group controlled (looped) light point / fan point / exhaust fan point / call bell point (without independent switch etc.) with 1.5 sq. mm FRLS PVC insulated copper conductor single core cable in surface / recessed PVC conduit / casing and capping, and earthing the point with 1.5 sq. mm FRLS PVC insulated copper conductor single core cable etc as required. (Installation Part)Note: Wiring upto 5 mtr length in between two adjacent points. |
| 25 | Wiring for circuit / submain wiring along with earth wirewith FRLS PVC insulated copper conductor, single corecable in surface / recessed medium as per scope of workPhase: 1 x 1.5 sq.mmNeutral: 1 x 1.5 sq. mmEarth: 1 x 1.5 sq.mmConduit: 20 mm(Installation Part) |
| 26 | Wiring for circuit / submain wiring along with earth wirewith FRLS PVC insulated copper conductor, single corecable in surface / recessed medium as per scope of workPhase: 1 x 2.5 sq.mmNeutral: 1 x 2.5 sq. mmEarth: 1 x 2.5 sq.mmConduit: 20 mm(Installation Part) |
| 27 | Installation of 16A socket, 16A switch & 3M flush mounting metal box with plate and frame as per scope of work |
| 28 | Installation of 20W motion sensing LED light fitting as per scope of work |
| 29 | Installation of 20W LED light fitting (integral type) as per scope of work |
| 30 | Installation of 8-10W LED light fitting (integral type) as per scope of work |
| 31 | Installation of 35W, 1200mm BLDC Ceiling Fan as per scope of work |
| 32 | Installation of 300mm LD exhuast fan as per scope of work |
| 33 | Dismantling of existing wiring and other electrical fittings in the area as per scope of work |