|
| 1 | fo|qr forj.k [k.M nsofj;k ds vUrxZr tek ;kstuk esa Lohd`r iqfyl ykbZu esa VªkaftV gkLVy 02 Cykd ds la;kstu ds ÅthZdj.k ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %& |
| 2 | Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- |
| 3 | PCC Pole 8.5 mtr long |
| 4 | PCC Pole 11 Mtr Long |
| 5 | 3x185sq mm xlpe 11 K.V Cable |
| 6 | 3x120sq mm xlpe 11 K.V Cable |
| 7 | 11 K.V Cable Jointing Kit (3x120sq mm) |
| 8 | 11 K.V Cable Jointing Kit (3x185sq mm) |
| 9 | M.S Channel (Dropper) |
| 10 | M.S Top Channal |
| 11 | 11 K.V Fuse Set |
| 12 | 400 KVA T/F |
| 13 | ACSR Weasel Conductor |
| 14 | M.S Angle Iron 65x65x6 mm 2700 mm Long Bracing With 4 Clamp |
| 15 | Earthing Complete |
| 16 | 11 KV PPMC CTR 25/5 A |
| 17 | 11 KV TVM Meter |
| 18 | 11 KV CT/PT pole mounated unit CTR 10/5A |
| 19 | M.S. angle 75x75x6x2028 mm with clamp T/F base |
| 20 | Supply of following material/fitting complete in all respect- |
| 21 | Stone Pad |
| 22 | G.I Pipe 6 Dia |
| 23 | Copper L-Piece 50x225x10mm(L.S) |
| 24 | Al lug Long Barrel off size |
| 25 | Nuts & Bolts off size |
| 26 | Erection of Double Pole with Grouting of Pole |
| 27 | Earthing of Pole |
| 28 | Laying of 11 KV XLPE Cable by Digging/Drilling method |
| 29 | Erection of 11 KV XLPE Cable Jointing Kit with complete work |
| 30 | Installation of Fuse Set |
| 31 | Laying, stringing, sagging, binding and jumpering of ACSR weasel conductor with fixing of accessories. |
| 32 | Erection, commissioning & Testing of 400 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. |
| 33 | Chemical earthing of Transformer (Materials will be provided by contractor) |
| 34 | Construction of T/F plinth with grouting of channel (All required materials will be provided by the contractor) |
| 35 | Pale Fencing |
| 36 | Installation of PPMC (25/5A) with 11 KV TVM Meter |
| 37 | Chemical earthing of PPMC (Materials will be provided by contractor) |
| 38 | Installation of CT/PT unit with 11 KV TVM Meter |
| 39 | fo|qr forj.k [k.M nsofj;k ds vUrxZr tek ;kstuk esa Lohd`r iqfyl ykbZu esa iq:\"k dfeZ;ksa gsrq gkLVy cSjd ds la;kstu gsrq fo|qrhdj.k ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %& |
| 40 | Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- |
| 41 | S.T Pole 11 MTR |
| 42 | ACSR wesal Conductor |
| 43 | E Bracket |
| 44 | 11 K.V Pine Insulator (Polimeric) |
| 45 | 11 K.V Dis Insulator Fitting (Polimeric) |
| 46 | 100 KVA T/F |
| 47 | Top channel |
| 48 | Dropper angle |
| 49 | Fuse Set |
| 50 | T/F Base |
| 51 | Earthing Complete |
| 52 | Stay Complete |
| 53 | Supply and installation of following material/fitting complete in all respect- |
| 54 | Clamp For Top & Dropper Channal |
| 55 | 3.5x70 sq mm Armourd Cable With Catenary |
| 56 | Erection of Double Pole with Grouting of Pole |
| 57 | Earthing of Pole |
| 58 | Installation of Fuse Set |
| 59 | Laying, stringing, sagging, binding and jumpering of ACSR weasel conductor with fixing of accessories. |
| 60 | Erection, commissioning & Testing of 100 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. |
| 61 | Erection and grouting of stay with nozelling and binding of stay wire (Complete work) |
| 62 | fo|qr forj.k [k.M nsofj;k ds vUrxZr tek ;kstuk esa Lohd`r esllZ vkjfcV vkVkseksckbZy izk0fy0] esgM+k uxj] nsofj;k ds la;kstu gsrq fo|qrhdj.k ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %& |
| 63 | Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- |
| 64 | 11 Mtr Long S.T Pole |
| 65 | ACSR Weasel Conductor |
| 66 | 11 KV Steel X-Arm |
| 67 | F-Bracket |
| 68 | 11 KV Pin Insulator With Pin |
| 69 | 11 KV Disc Insulator with Fitting |
| 70 | 63 KVA T/F |
| 71 | 11 KV T-OFF Chanael |
| 72 | Top Chanael |
| 73 | Droper Angle |
| 74 | T/F Base |
| 75 | Earthing Complete |
| 76 | Stay Complete |
| 77 | Fuse Set |
| 78 | Supply and installation of following material/fitting complete in all respect- |
| 79 | Clamp for X-arm |
| 80 | Clampe for T-OFF, Top Channel & Droper Angle |
| 81 | Erection of Single Pole with Grouting of Pole |
| 82 | Erection of Double Pole with Grouting of Pole |
| 83 | Earthing of Pole |
| 84 | Installation of Fuse Set |
| 85 | Laying, stringing, sagging, binding and jumpering of ACSR weasel conductor with fixing of accessories. |
| 86 | Erection, commissioning & Testing of 63 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. |
| 87 | Erection and grouting of stay with nozelling and binding of stay wire (Complete work) |
| 88 | ffo|qr forj.k [k.M nsofj;k ds vUrxZr tek ;kstuk esa Lohd`r Jherh uhrw ;kno iRuh Jh xqM~Mq ;kno] okMZ ua0 09] cfj;kiqj tuin&nsofj;k ds ifjlj ij la;kstu gsrq fo|qrhdj.k ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %& |
| 89 | Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- |
| 90 | PCC Pole 8.5 MTR Long |
| 91 | ACSR Weasl Conductor |
| 92 | 11 KV Pin Inshulator |
| 93 | \"V\" Type x-arm |
| 94 | F Bracket |
| 95 | Top Channal |
| 96 | Dropper Channal |
| 97 | T/F Base |
| 98 | 63 KVAT/F |
| 99 | L.T ABC (3x120+1x95+1x16) sq mm |
| 100 | Three Phase Distribution Box |
| 101 | Earthing Complete |
| 102 | Stay Complete |
| 103 | 11 KV Fuse Set |
| 104 | Supply and installation of following material/fitting complete in all respect- |
| 105 | Stone Pad |
| 106 | Clamp For \"V\" Type X-Arm |
| 107 | Clamp For Top Dropper |
| 108 | Suspension Clamp |
| 109 | Dead End Clamp |
| 110 | Eye -Hook |
| 111 | J- Hook |
| 112 | Clamp For Three Phase Distribution Box |
| 113 | Erection of Double Pole with Grouting of Pole |
| 114 | Earthing of Pole |
| 115 | Installation of Fuse Set |
| 116 | Laying, stringing, sagging, binding and jumpering of AB Cable with fixing of accessories. |
| 117 | Erection, commissioning & Testing of 63 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. |
| 118 | Installation of Three Phase Distribution Box with its fitting |
| 119 | Erection and grouting of stay with nozelling and binding of stay wire (Complete work) |
| 120 | fo|qr forj.k [k.M nsofj;k ds vUrxZr tek ;kstuk esa Lohd`r jktdh; gksE;ksiSfFkd fpfdRlky;] jke?kkV dksbzylo] tuin&dq\"khuxj ds ifjlj ij la;kstu gsrq fo|qrhdj.k ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %& |
| 121 | Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- |
| 122 | PCC Pole 8.5 mtr long |
| 123 | ACSR Weasel Conductor |
| 124 | Supply and installation of following material/fitting complete in all respect- |
| 125 | L.T Clamp |
| 126 | Stone Pad |
| 127 | L.T Shackel Insulator |
| 128 | Bolt & Nut For Shackel Insulator |
| 129 | Stay Complete |
| 130 | Concreting of Stay |
| 131 | 2x6mm PVC Armoured Cable |
| 132 | Erection of Pole with concreting and grouting of Pole |
| 133 | Laying, stringing, sagging, binding and jumpering of ACSR weasel conductor with fixing of accessories. |
| 134 | Erection and grouting of stay with nozelling and binding of stay wire (Complete work) |
| 135 | fo|qr forj.k [k.M nsofj;k ds vUrxZr tek ;kstuk esa Lohd`r jsyos LVs\"ku vfgY;kiqj gkYV] tuin&nsofj;k ds ifjlj ij la;kstu gsrq fo|qrhdj.k ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %& |
| 136 | Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- |
| 137 | PCC Pole 8.5 MTR Long |
| 138 | STP Pole 11 MTR Long |
| 139 | ACSR Weals Condutor |
| 140 | \"V\" Type X-Arm |
| 141 | 11 KV Pin Insulator With Polymaric |
| 142 | 11 KV Disc Insulator With Polymaric |
| 143 | M.S Earthing Rod (2540x20 mm) |
| 144 | Earthing G.I Wire 7.16 6 SWG |
| 145 | Stay Rod (16x1800 mm) |
| 146 | Stay Wire (3.15 mm)7/10 SWG (GSS Wire) |
| 147 | MS angle 75x75x6x2028 mm with Clamp & Bolts Nut (T/F Bause) |
| 148 | MS Channal Dopper (100x50x2028 mm) |
| 149 | MS Top Channal (125x65x2240 mm) |
| 150 | T/F 0.4KV,63 KVA |
| 151 | Supply and installation of following material/fitting complete in all respect- |
| 152 | Stone Pad 300x75 mm |
| 153 | F- Breacket For Fitting Top Insulator With Bolts &Nut |
| 154 | Cross Arm holding Clamp With Nut & Bolts |
| 155 | Clamp For Stay |
| 156 | Stay Insulator |
| 157 | Clamp For Top & Dropper Channal & Tee of channal |
| 158 | ALLUMINIUM CRIMPING LUG |
| 159 | Dopper L-Piece 50x225x10 mm(L.S) |
| 160 | Al Leg Long Barrel off size (lS) |
| 161 | Erection of Double Pole with concreting and grouting of Pole |
| 162 | Erection of Pole with concreting and grouting of Pole |
| 163 | Earthing of Pole |
| 164 | Installation of Fuse Set |
| 165 | Laying, stringing, sagging, binding and jumpering of ACSR weasel conductor with fixing of accessories. |
| 166 | Erection, commissioning & Testing of 63 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. |
| 167 | Erection and grouting of stay with nozelling and binding of stay wire (Complete work) |
| 168 | fo|qr forj.k [k.M nsofj;k ds vUrxZr tek ;kstuk esa Lohd`r d`f\"k Kku dsUnz] esgjk] tuin&nsofj;k ds ifjlj ij la;kstu gsrq fo|qrhdj.k ds dk;Z dks lseh VuZdh ds vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k %& |
| 169 | Loading, unloading and carriage of following materials from Store Centre, Deoria to JE dump Store and JE dump Store to work site:- |
| 170 | S.T Pole 11 MTR |
| 171 | ACSR wesal Conductor |
| 172 | E Bracket |
| 173 | 11 K.V Pine Insulator With Pin |
| 174 | 11 K.V Dis Insulator With Fitting |
| 175 | 25 K.V.A T/F |
| 176 | Top channel |
| 177 | Dropper angle |
| 178 | Fuse Set |
| 179 | T/F Base |
| 180 | Stay Complet |
| 181 | Earthing Complet |
| 182 | Supply and installation of following material/fitting complete in all respect- |
| 183 | Clamp For Top & Dropper Channal |
| 184 | 4x25 sq mm Cable Armourd Cable With Catenary Wire |
| 185 | Cross Arm holding Clamp With Nut & Bolts |
| 186 | Erection of Double Pole with concreting and grouting of Pole |
| 187 | Earthing of Pole |
| 188 | Installation of Fuse Set |
| 189 | Erection, commissioning & Testing of 25 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. |
| 190 | Erection and grouting of stay with nozelling and binding of stay wire (Complete work) Please Enable Macros to View BoQ information |