| 1 | Phisibilty Test of ground water |
| 2 | Logging - Electric logging of the bore hole by Logger & testing of Resistivity |
| 3 | Transportation of Rig m/c and its T&P through by truck |
| 4 | Carting of T&P of Rig M/C by truck to T.W. |
| 5 | Loading and Unloading of T&P of rig M/C. |
| 6 | Return trip of Rig M/C & its T&P Completing work. |
| 7 | Air Compressor |
| 8 | Carting of 250 PSI air Compressor by tractor to T.W. site |
| 9 | Loading and Unloading of T&P of air compressor. |
| 10 | Return trip of Air Compressor & its T&P Completing work. |
| 11 | OP Unit |
| 12 | Carting of O.P. Unit by tractor to site. |
| 13 | Loading and Unloading of T&P of O.P. Unit |
| 14 | Return trip of O.P. Unit ofter Completion of work. |
| 15 | TW Assembly |
| 16 | Carting of tube well assembly and other specials. |
| 17 | Loading and unloading of tube well assembly. |
| 18 | Submersible Moter/pump Set 15 H.P. |
| 19 | Electronic Cantrol Pannel for above pump set of 20 H.P. |
| 20 | Cubical pannel board suitable for the pumping plant. |
| 21 | Supply and fixing of C.I. D/F Tee, C.I. D/F Bends, Tail pieces, ruber packing, nut bolt , D Joints as per job requirment |
| 22 | 100 mm dia main piping wall including S.V./R.V. and column pipe distance piece etc. |
| 23 | Copper Cable three core 10 Sq mm |
| 24 | Supply and Installation of Electronic Doser Plant |
| 25 | Chain Pulley Block 3 ton Make |
| 26 | Tools |
| 27 | Installation of power wiring and earthing complete including the cost of matrial, labour T&P etc all complete |
| 28 | 100mm dia ISI make heavy duty column pipe. |
| 29 | Drilling of Tube well bore |
| 30 | I- Erection of Rig m/c & its T&P |
| 31 | II- Dismantling of Rig m/c & its T&P |
| 32 | III- Drilling & reaming of 680 mm dia bore from ------- |
| 33 | a) G.L. to 50 mtr. By Dc m/c |
| 34 | b) 50 to 68 mtr. By Dc m/c |
| 35 | Supply of Tubewell assembly |
| 36 | 300mm MS Plain Pipe. |
| 37 | 300 mm MS Slotted pipe. |
| 38 | 300 mm M.S. well cap. |
| 39 | 300 mm M.S. ring. |
| 40 | 300 mm M.S. clamp. |
| 41 | 300 mm Tube well support girder for 300 mm M.S. Tubewell |
| 42 | 300 mm size M.S. nipple. |
| 43 | Supply and filling of Pea-Gravel in bore hole incl. lab T&P etc. |
| 44 | Shroinding of pea gravel arround anular Space between T/W assy. And tube well bore. |
| 45 | Lowering of Tubewell assembly |
| 46 | Lowering of 300 mm size tube well assembly from ground level to 68 mts. BGL. |
| 47 | Development of Tubewell by 250 PSI air compressor |
| 48 | I- Erection of air compressor and its T&P |
| 49 | II- Development of T.W. by 250 PSI Compressor |
| 50 | III- Dismantling of above Compressor |
| 51 | Testing of yield & verticality & Chemical analysis of water. |
| 52 | Rental charges of rig M/C compressor and O.P. Unit. |
| 53 | Boring for pilling work in foundation of pump house up to 3.0 m depth |
| 54 | (a) Boring 250 mm |
| 55 | (b) MS in reinforcement including supply of material cutting bending and fixing etc all complete |
| 56 | (c) RCC work 1:1:5:3 in piles including supply of all material & labour etc complete |
| 57 | (a) M.S. work in reinforcement including supply of material cutting bending and binding etc complete |
| 58 | (b) RCC work in 1:1:5:3 beam including supply of all material, labour T&P etc complete |
| 59 | Earth filling in plinth RCC including supply of necessary quantity of each from a distance not to exceed 5.0 kl from the site of work and including watering, dressing etc. rates including cost of materials labour T&P etc required for proper completion of work |
| 60 | 20 mm thick DPC with cement and approved coarse sand 1:2 including 5% water proofing materials or in the proportion as specified by the manufactures including curing and shuttring necessity. |
| 61 | Ist Class brick work in 1:6 cement and sand mortar in superstructure brick work with required thickness of wall including supply of all material & labour etc complete |
| 62 | Supply and fixing of door and window angle for Chaukhat 50 mm x 50 mm = 6 mm including its fixing with labour T&P for proper completion of work |
| 63 | Supply and fixing of MS grill in window frame including of all material labour T&P etc complete |
| 64 | Supply and fixing of hold fast (25x5x5) flat iron including its cutting, moulding & in required shape also including of all material labour T&P etc complete |
| 65 | RCC work with cement coarse sand and 20 mm gauge approved stone ballast in proportion of 1:1.5:3 (lintls, sunshades, slab etc.) and including necessary centering and shuttering supply of all material & labour etc. all completetion of work |
| 66 | Mild Steel or work in plain work such as RCC work (when not included in overall rates) brought to a required shapes as necessary including bending for proper completion of the work including supply of steel & wastage etc. |
| 67 | Rolles steel joist (Girder) fixed in position including cost of joints and labour in handling and hoisting etc cmoplete (3.00mx200mmx100mm size) |
| 68 | 12 mm thick plaster with cement sand in 1:6 over brick work minimum thickness not to be less then 12 mm including supply of all material, labour T&P etc complete |
| 69 | 25 mm thick PCC floor with cement and coarse sand 20 mm thick gauge stone ballast laid in panels finished with 3 mm floating coat of neat cement and inlcuding 75 mm thick sand and Ist Class brick ballast 4 cm gauge in proportion of 1:4:8 and remove any overlapping of mortar at the panel supply of all material, labour T&P etc complete |
| 70 | Painting or varnishing of new iron works, with one coat of primary and two coats of approved paints or varnishing including supply of all material, labour T&P etc completion of the work |
| 71 | Apex painting with two coats of approved colour over one coat of white cement supply of all material, labour T&P etc completion of the work |
| 72 | provide and fix RCC jallies of 30x50 cm Size including supply of all material, labour T&P etc completion of the work |
| 73 | Supply and fixing of V Notch including all supply etc complete |
| 74 | supply and fixing of gautter |
| 75 | Site Clearance and unforseen Item |
| 76 | Laying of Main Distribution Pipeline from newly bored tubewell to existing pipeline w/s Banda. Please Enable Macros to View BoQ information |