| 1 | Earth work in excavation in foundation in ordinary Soil by manual including lift up to 1.50 m and 30 m lead including back filling, watering and ramming of excavated earth dressing the surface to the required level & slope for proper completion of work as per direction of Engineer in charge. |
| 2 | Providing and laying in position cement concrete of specified grade Cement concrete (1 Cement: 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) complete including cost of all materials, Labour, T&P as per direction of Engineer in charge. |
| 3 | Providing & Laying First Class Brick Work in Cement mortar 1:4 (1 cement: 4 coarse sand) including cost of all materials, Labour, T&P complete as per direction of Engineer in charge. |
| 4 | Providing & Laying Struct Deep pointing on brick masonary with Cement Mortar 1:2 (1 Cement: 2 Coarse Sand) including cost of all materials, Labour, T&P complete as per direction of Engineer in charge. |
| 5 | Centering and shuttering including strutting, etc. and removal of form for C.C Work including cost of all materials, Labour, T&P as per direction of Engineer in charge. |
| 6 | Providing & laying of 110mm dia NP-6 High Density Polythylene Rigid Pressure Pipe (HDPE Pipe) reqired for proper completion of Work including cost of all materials, Labour, T&P complete as per direction of Engineer in charge. |
| 7 | Providing & laying of 160mm dia NP-6 High Density Polythylene Rigid Pressure Pipe (HDPE Pipe) reqired for proper completion of Work i/c cost of all materials, Labour, T&P complete as per direction of Engineer in charge. |
| 8 | Supply and Fixing of M-25 RCC Precasted I-shape Boundary post having approved size and height 1.68M (5\"6\") with CC cape including Letter writing upto 10 cm. Height over boundary pillar including cost of all materials, Labour, T&P as per direction of Engineer in charge. |
| 9 | Supplying & Fixing of Iron Sign board (Size 1.20x0.90m.) with 16-gauge iron sheet and 50x50x5 mm size MS angle upto 3.0m. Height including cost of all materials, Labour, T&P as per direction of Engineer in charge. |
| 10 | Providing & Laying Ordinary Sand in bed with desired slope under Lining/brick on edge work including carriage charge from quarry to work site including loading and unloading ramming, dressing & manual compaction etc. complete as per direction of Engineer in charge. |
| 11 | Providing and Laying brick on edge using over burnt bricks including making subgrade, alingnment and filling joints with local sand including all lift and leads with cost of all material labour and T&P, all lift and leads etc. complete as per direction of Engineer in Charge. |
| 12 | Providing & Laying 12 mm thick Cement Plaster 1:4 (1 Cement: 4 Coarse Sand) on Brick Masonary including cost of all materials, Labour, T&P complete as per direction of Engineer in charge. |
| 13 | Providing & Laying of LDPE Flim 150 micron thick reqired for proper completion of Work including cost of all materials, Labour, T&P complete as per direction of Engineer in charge. |
| 14 | Supply & Filling Construction Joints as per approved shape and size with Bitumen including cost of all materials, Labour, T&P complete as per direction of Engineer in charge. |
| 15 | Painting with synthetic Enemal paint of approved brand (Asian/Nerolace/Berger/JSW) in two coats with one coat of approved brand primer including preparation of surface complete all as specified and direction of Engineer in charge |
| 16 | Finishing exerior wall painting with acrylic emulsion paint of approved brand (Asian/ Nerolace/ Berger /Birla) in two coats on old surface with one coat of approved brand primer including preparation of surface complete all as specified and direction of Engineer in charge. |
| 17 | Providing Letter writing on Parapet Wall/Slab up to 10 cm height including cost of all materials, Labour, T&P complete as per direction of Engineer in charge. |
| 18 | Providing and laying in position specified grade of cement concrete 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) including cost of all materials, Labour, T&P complete as per direction of Engineer in charge. |
| 19 | Survey with Drone Camera of Canal for three run (Before, During and After Work) and Supply of Video script in pendrive and two photos in hard copy of each Km. etc. complete as per direction of Engineer in charge. Please Enable Macros to View BoQ information |