| 1 | EARTH WORK IN FILLING WITH CARTAGE AS DIRECTED BY ENGINEER-IN CHAREE |
| 2 | Providing and fixing of typical informatory sign board as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25 mm x 5 mm size on back on edges. The lower plate will be welded with MS angle iron frame of 25 mm x 5 mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos 75 mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450 mm x 600 mm, 600 mm below ground level. All M.S. will be stove enameled on both sides. Lettering and printing arrows, enamel paints of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1 (As per Banda SOR Dt. 26.04.2018 Ch- 10 Item No 10.16) |
| 3 | WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405 |
| 4 | Cement concrete with 20/10 mm gauge approved stone grit coarse sand 2.5 F.M. and cement proportion of M20 (1:1.5:3) including supply of all materials labour and T&P required for proper completion of work (Road Slab) |
| 5 | supply and laying of 125 micron pollythene sheet including supply of all material labour and T&P etc complete required for proper completion of works. |
| 6 | supply and Applying C.C Cutting in joints of C.C. road including supply of all materials labour and T&P etc.(10X6cm) |
| 7 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 1 st year maintenance cost @ 0.0 % |
| 8 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25 % |
| 9 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50 % |
| 10 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75 % |
| 11 | The routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in CB Condition and keep the entire road surfaceand structure in Defect free condition during the entire maintenace period which begins from the actual Completion Data and ends after Five years (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00 % |
| 12 | Excavation in foundation in ordenary soil including lift up to 1.50M and lead upto30 Meter excavation earth in to the space between the building and the side of foundation trenches o in to the plainth and removal and disposal of surface earth as directed by E/I upto distance of 30 m from the foundation trenches (S.I.No.251A) |
| 13 | P/L of Cement Concreet in 1:6:12 (1 Cement :6 Fine sand :12 Brick Ballast 40 mm)Including all Supply And matriales.Si 273 |
| 14 | P/L Reinforcement Cement Conccrate in Raft 1: 2: 4 With All Complete Work. |
| 15 | P/L Reinforcement Cement Conccrate in Ratainnig Wall 1: 1.5: 3 With All Complete Work. |
| 16 | M.S. Steel or Plain work For R.C.C. Please Enable Macros to View BoQ information |