|
| 1 | Slip clearance (by manual means) of earth and boulders including disposal complete as directed by the Engineer-in-charge including supply of all materials, labour and T&P etc. required for proper completion of the work |
| 2 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC Grade M25 With Batching Plant, Transit Mixer and Manual placing including supply of all material labour T&P etc. required for proper complition of the work.(Formwork Included) |
| 3 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201, By Manual Means in area of thorny jungle including supply of all material labour T&P etc. required for proper completion of the work. |
| 4 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge, 50mm average thickness, including supply of all material, labour, T&P etc. required for proper completion of the work |
| 5 | Supply unskilled labour for full day as per requirement for attending miscellaneous works as per direction of the Engineer in charge for proper completion of the work. |
| 6 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect, Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make, including supply of all material, labour, T&P etc. required for proper completion of the work. |
| 7 | Relaying of existing stones pitching after dismanteling of partially damaged slope including supply of labour, T&P etc. required for proper completion of work but excluding stones |
| 8 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions of galvanized steel, of size 3mX1mX1m with two diaphragms at 1m interval, having mesh opening 100mmx120mm, mesh wire diameter 3mm for gabions, edge/selvedge wire diameter 3.9mm and lacing wire diameter 2.2mm. (The work includes filling boulders in the gabions). |
| 9 | Engaging & operation of one tractor along with one driver and one helper & trolley having hydraulic jack arrangement. Including cost of fuel lubricants and repair maintenance etc. for removal of slip / landslide/ excavation in dry and wet condition, complete in all respect as per direction of I/C. Capacity of tractor must be not less than 45 BHP, and loading capacity of trolley must not be less than 2.25 cum. Payment for engaging Tractor with trolley shall be made only for actual working hours at site, no idle charges shall be paid. If tractor is trapped in slip / earth, contractor shall make its own arrangement to haul it, for which no extra payment shall be made to contractor, and also tractor shall be considered in idle condition. Cost of mobilization & demobilization from site shall be borne by contractor. |
| 10 | Engaging & operation of one no. wheel type excavator cum loader machine (preferably JCB/L&T/ BEML etc) having capacity 75 BHP with one operator and one helper or skid steer loader Bob cut (height not more than 2.0 m) having capacity 75 BHP with one operator and one helper including cost of fuel lubricants and repair maintenance etc. for removal of slip / landslide/ excavation in dry and wet condition, complete in all respect as per direction of I/C. Payment for engaging excavator cum loader shall be made only for actual working hours at site, no idle charges shall be paid. If machine is trapped in slip / earth, contractor shall make its own arrangement to haul the machine, for which no extra payment shall be made to contractor, and also machine shall be considered in idle condition. Cost of mobilization & demobilization from site shall be borne by contractor Please Enable Macros to View BoQ information |