| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. |
| 2 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. |
| 4 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. |
| 5 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 7 | Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 8 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. |
| 9 | Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 10 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder ( VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects |
| 11 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 |
| 12 | Execavation in foundation in ordinary soil including lift upto 1.5M and lead upto 30M including watering ramming and dressing etc. and disposal of surplus earth as direction by E/I upto a distance of 30 m from the foundation trenches complete in all respect |
| 13 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 14 | Supply of 1200 mm Dia Pipe NP-4 |
| 15 | Providing laying jointing and fixing of pipe required for proper completion of the work with PCC Grade M25 using batching plant transit mixer & concrete Pump. |
| 16 | M-150 brick work in 1:3 cement and coarse sand mortar in foundation and plinth etc. required for proper completion of the work S.I.No. 305 |
| 17 | Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications |
| 18 | Providing and laying of hot applied thermoplastic compound 2.50 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.50 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. |
| 19 | Supply and erection of built up overhead cantilever structure 6 m span comprising of one vertical post of 6 m height made of 300 mm NB heavy class MS pipe as vertical member welded with 10 mm plate at top & 12 mm plate at bottom, RCC with 1:2:4 cement coarse sand and 20 mm stone grit including supply and fixing of 25 mm dia foundation bolt of 600 mm long as per provision of structure design including cost of reinforcement and shuttering. The lateral vertical clearence and complete |
| 20 | Retro reflecting sign alluminium pannel |
| 21 | Village sign board |
| 22 | Cautionary Sign board |
| 23 | Km stones Please Enable Macros to View BoQ information |