Name of Work:- Thanjavur District - Vp Gf - 2025-26.Bt To Bharathiyar Theru In Nanjikottai Panchayat.
Sl. No.
Item Description
1
BT to Bharathiyar theru in Nanjikottai panchayat.
2
Earth work excavation and depositing on bank with initial lead of 10metres and lift of 2metres as per SS 20A including breaking clods,sectioning,ramming etc., complete as directed by the dept. officers for formation.(SI. No.61)
3
Picking the Existing BT surface 50mm-100mm thick including cost conveyance and all labour charges for picking hand packing leveling and consolidation by power roller rolling including all labour charges and all other insidental charges etc.complete.
4
Providing and laying WBM 75 mm compacted thickness with Grade III metal using 1 cum of 63 - 11.2mm IRC HBG metal with 0.24 cum of gravel bindage per 10sqm including cost and conveyance of all materials and stacking to departmental gauge for spreading metal and gravel mix hand packing to camber including with all leads for water and compacting 80-100 KN power roller including hire charges and fuel charges for Power Roller, water sprinkler and all tools and plants employed,barricading etc., complete as per clauses 404 of MoRD specifications.
5
Providing and applying Tack coat 4 kg/10sqm over the WBM surface area including cost of Bituminous emulsion at at the site including labour charges for preparing applying the surface and applying the required quantity of emulsion Bitumen as tack coat including hire and fuel charges for bitumen sprayer etc., complete as per clause 503 of MoRD specifications.
6
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 23.232Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat \"A\" over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
7
Providing and laying of Soling U.S.gravel from approved quarry including cost and conveyance to worksite to standard departmental gauge for taking pre-measurement and all other labour charges for spreading complete with standard specifications etc., complete
8
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.