| 1 | Supplying all labour, TAP and Earthwork in excavation in Cary Sonchoding dressing, breaking clods & laying in layers not exceeding 30cum in depth beveling the bed & depositing the soil with in initial lead of 50m. & intial lift of 1.50m including sundries, supervision charges & contractor profit & labour cess etc & as per the direction of engineer-in-charge Data for 100 cum |
| 2 | Supplying all materials, labour, T&P and filling in foundation and plinth with sand well watered and rammed including conveyance of all materials to work site, payment of royalty, taxes, contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge. |
| 3 | Supplying all materials laour T&P and providing rigid smooth centering and shuttering for R.C.C. works including False work and dismantling them after casting Supplying all materials, labour, T&P and providing rigid and Smooth centering and Including Conveyance of all materials to Work site, payment of royalty taxes, contractor profit & labour cess etc all complete as per specification and direction of Engineer-in- |
| 4 | 1st floor |
| 5 | Supplying all materials, labour, T&P and providing cement concrete(1:3:6) with 4cm size crusher broken black hard granite metal including watering, curing, conveyance of all materials to work site, payment of royalty taxes, contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge. |
| 6 | Supplying all labour, materials, T&P and providing Reinforced Cement concrete (1:1 1/3 :3) with crusher broken hard granite chips on 12mm size RCC works including cost of conveyance & royalty, sundries, watering.curing thing Glaying concrete at a height of Smer. Maximum,contractor profit & labour cess complete etc all complete (Excluding cost of reinforcement & centering & shuttering). |
| 7 | 1st floor |
| 8 | Supplying all materials, labour, T&P and Providing Brick work with Fly Ash Bricks 25cm x 12cm x 8cm size having crushing strength not Less than 75kg/cm³ with dimensional tolerance & percent in Cement mortar in Cement Mortar (1:6) after immersing the bricks for hours in water before use including splays, cutting, circular moulding corbelling champhering and similar such type of works, scaffolding watering, curing, the work including cost of conveyance & royalty, sundries & watering for curing & supervision charges, contractor profit & labour cess etc, all complete as per the direction of Engineer-in-charge. |
| 9 | Supplying all materials, labour, T&P and making 12mm thick cement plaster in cement mortar (1:4) for brick work including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes, contractor profit & labour cess as per the direction of engineer-in-charge |
| 10 | Supplying all materials, labour, T&P and providing M.S. reinforcement for Reinforced cement concrete work including cutting, bending, binding and placing in position including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes contractor profit & labour cess etc all complete as per specification and direction of the Engineer-in-charge. |
| 11 | Supplying all materials, labour, T&P and finishing surface of walls with cement based wass putty(Water Based) of approved make and finished smooth and even surface to receive palting including cost of scaffolding staging charges with cost of allmaterials, taxes & labour cess etc all complete as per the direction of Engineer-in-charge. |
| 12 | Supplying all materials, labour, T&P and finishing surface of walls with cement based wass putty(Water Based) of approved make and finished smooth and even surface to receive palting including cost of scaffolding staging charges with cost of allmaterials, taxes & labour cess etc all complete as per the direction of Engineer-in-charge. |
| 13 | Supplying all materials, labour, T&P and providing two coat of Weather Coats with any approved shades including cost of conveyance, taxes of, brushes, sundries, contractor profit & labour cess etc all complete as per the direction of |
| 14 | Supplying all materials, labour, T&P and making 2.5 cm artificial stone flooring with cement concrete (1:2:4) including punning using 12mm size crusher broken granites chips, including cost of conveyance & royalty sundries & watering for curing & supervision charges, contractor profit & labour cess etc, all complete as per the direction of Engineer-in-charge. |
| 15 | Electrification & Ph (to be paid as per actual voucher). |
| 16 | Supplying all materials, labour, TSP and fixing GCI Sheet (Dura Shine) Colourd Sheet) in roof drilling holes in wind ties including ridges velleys wind ties etc including cost of all materials, conveyance,contractor profit & labour cess etc all complete as per the direction of Engineer-in-charge. |
| 17 | Supplying all labour, T&P and painting two coat with any approved Enamel Paint on new/old wood work including cast of Sundries, brushes, soap, &putty etc including preparation of Surface, contractor profit & labour cess all complete as per the direction of Engineer-in-Charge. |
| 18 | Supplying & fitting, fixing of vitrified tiles in floor of size 600mm x 600mm of approved make conforming to IS:13755 laid on 20mm thick cement mortar(1:4)(1 cement +4 course sand) and filling joints with white cement of approved quality including cost of all materials, taxes, conveyances, royalty, contractor profit & labour cess etc all complete as per the direction of Engineer-in-charge (Ref-S/R-2012 (XIX other building items Sl No.1(b)) (with Vetrified Tiles (600x600mm Plain |
| 19 | Supplying all materials, labour, T&P and Providing Brick work with Fly Ash Bricks 25cm x 12cm x 8cm size having crushing strength not Less than 75kg/cm³ with dimensional tolerance 18 percent in Cement mortar in Cement Mortar (1:6) after immersing the bricks for hours in water before use including splays, cutting, circular moulding, corbelling, champhering and similar such type of works,scaffolding, watering, curing, the work including cost of conveyance & royalty,sundries & watering for curing & supervision charges, contractor profit & labour cess etc, all complete as per the direction of Engineer-in-charge. |
| 20 | Supplying all labour, T&P Iron work wrought and put up in trusses and purlins including fabrication and all cost of MS pipe 40mm dia included, placing, fixing etc as per the direction of E-I-C. |
| 21 | Add Photo Graphy & Display Board Please Enable Macros to View BoQ information |