|
| 1 | Supplying all labour, T&P and Earthwork in excavation in @inay Soil including dressing, breaking clods & laying in layers not exceeding 30cum in depth leveling the bed & depositing the soil with in initial lead of 50m, & initial lift of 1.50m., including sundries. supervision charges & contractor profit & labour cess etc & as per the direction of engineer in-charge Data for 100 cum |
| 2 | Supplying all materials, labour, T&P and filling in foundation and plinth with sand well watered and rammed including conveyance of all materials to work site, payment of royalty. taxes contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge |
| 3 | Supplying all materials, latiour, T&P and providing rigid and Smooth centering and shuttering for R.C.C. works including False work and dismantling them after casting including Conveyance of all materials to Work site, payment of royalty taves, contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge |
| 4 | 1st floor |
| 5 | Supplying all materials, labour, T&P and providing cement concrete(1:3:6) with 4cm size crusher broken black hard granite metal including watering, curing, conveyance of all materials to work site. payment of royalty taxes, contractor profit & labour cess etc all complete as per specification and direction of Engineer-in-charge. |
| 6 | Supplying all labour, materials, T&P and providing Reinforced Cement concrete (1:1% 3) with crusher broken hard granite chips on 12mm size RCC works including cost of conveyance & royalty sundries, watering curing &lifting & laying concrete at a height of Smtr. Maximum.contractor profit & labour cess complete etc all complete (Excluding cost of reinforcement & centering & shuttering) |
| 7 | Roof slab including grading(st top(Ist Floor) |
| 8 | Supplying all materials, labour, T&P and Providing Brick work with Fly Ash Bricks 25cm x 12cm x 8cm size having crushing strength not Less than 75kg/cm² with dimensional tolerance 8 percent in Cement mortar in Cement Mortar (1:6) after immersing the bricks for hours in water before use including splays, cutting, circular moulding corbelling champhering and similar such type of works,scaffolding, watering, curing, the work including cost of conveyance & royalty sundries & watering for curing & supervision charges, contractor profit & labour cess etc, all complete as per the direction of Engineer-in-charge |
| 9 | Supplying all materials, labour, T&P and making 12mm thick cement plaster in cement mortar (1:4) for brick work including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes, contractor profit & labour cess as per the direction of engineer-in-charge |
| 10 | Supplying all materials, labour, T&P and providing M.S. reinforcement for Reinforced cement concrete work including cutting, bending, binding and placing in position including cost of binding wire 18 to 20 gauge, conveyance of all materials to worksite, payment of royalty, taxes contractor profit & labour cess etc all complete as per specification and direction of the Engineer-in-charge. (Ref AR-2006, Item RCC work SI No.09,P-52) |
| 11 | Supplying all materials, labour, T&P and finishing surface of walls with cement based wass putty(Water Based) of approved make and finished smooth and even surface to receive paiting including cost of scaffolding staging charges with cost of all materials.taxes & labour cess etc all complete as per the direction of Engineer- |
| 12 | Supplying all materials, labour, T&P and finishing surface of walls withcement based wass putty(Water Based) of approved make and finished smouth and even surface to receive pading including cost of scaffolding staging charges with cost of all materials, taves & labour cess etc all complete as per the direction of Engineer in-charge |
| 13 | Supplying all materials, labour, T&P and providing two coat of Weather Coats with any approved shades including cost of conveyance, taxes of, brushes, sundries contractor profit & labour cess etc all complete as per the direction of Engineer-in-charge |
| 14 | Supplying all materials Jabour T&P and making 2.5 cm artificial stone flooring with cement concrete (1:2:4) including punning using 12mm size crusher broken granites chips including cost of conveyance & royalty sundries & watering for curing & supervision charges contractor profit & labour cess etc, all complete as per the direction of Engineer in-charge |
| 15 | Electrification & Ph (to be paid as per actual voucher). |
| 16 | dd Photo Graphy & Display Board Please Enable Macros to View BoQ information |