|
| 1 | DRR 547 (W)Repairs to Front wheel by way of dismantling of worn out parts, P/F of new spares including Bush inner (307-2-2) 2 nos, Bush outer (307-2-3) 2 nos, Mud ring (307-2-4) 1 no, Cover (307-2-6) 2 nos, Joint (307-2-7) 2 nos, Shaft (307-2-13) 1 no, taper roller bearing(307-3-1)-1no, bracket for quadrant (307-3-8)-1no, bolt (ss2-011)-12no.Complete job including assembling of unit, testing, cost of labour, tools and tackles including greasing and all kind of taxes. |
| 2 | DRR 547 (W)Repair to machine by way of replacing & providing and fitting of allied parts like oil pipe/fuel pipe-04Nos, Fan belt-01No, Air cleaner assy-01No, Banjo bolt-04Nos, Oil pressure meter-01No,Thrust washer-01set, Temperature meter-01No, Ampere meter-01No,Chassis nut and bolts-18Nos. Complete job including testing, cost of labour &allied material including all kind of taxes. |
| 3 | DRR 2223 S/CRepair of steering system of DRR 2223, dismantling, extracting of defective parts P/F of new parts-bush for steering pinion-1no, steering segment-1no, segment bolt-3 no’s, steering worm & spindle-1 no, bearing-1no, bush-1no, pinion & shaft-1no, universal coupling-1no, worm wheel-1no, fixing pin-2 no, steering worm case with cover, bolt & washer for steering-1no, oil seal housing-1no, spherical bearing-1no, end cap for spherical bearing-1no, dowel for worm case. The job includes cost of material, labour charges, servicing at site and all taxes. |
| 4 | DRR 2223 S/CRepairs to alternator by way of dismantling, extracting of damage parts, cleaning with diesel, replacement of damage/worn out parts by P/F of new parts carbon bush set-1no, solenoid switch-1 no, repairs to armature, P/F of bearings of armature shaft, field coil set, assembling and complete testing at site including all allied works, job includes cost of material and labour charges as per site condition. |
| 5 | Rebate on account of old parts (absolute) Please Enable Macros to View BoQ information |