| Sl. No. | Item Description |
| 1 | SEWAGE TREATMENT PLANT(100 KLD CAPACITY) :- Supplying, Fabrication, Installing, Testing & Commissioning of Pre Fabricated Package Type Sewage Treatment Plantof capacity 100 KLD. The sewage treatement shall be based on MBR technology. The nature of effluent from domestic sewage from toilets and kitchen shall be discharge seperately into the STP. The cost will also include MS puddle flange, Inlet, Outlet, overflow, test line, drain line,by-pass line, vent, foot rest, inspection platform with railing, moving ladder and making support for pipes. Complete Sewage Treatment Plant of capacity 100KLD to be provided as per the details given in Schedule \"A\" Part-I from page No 38 to 42 of CA. |
| 2 | Supply, Installation, Testing & Commissioning of “SCADA SYSTEM” for 100 KLD Sewage Treatment Plant along with various Automation equipment for STP as indicated and as per the details given in Schedule \"A\" Part-I page No 43 of CA. The STP SCADA system shall comprise of following :-(a) Central Monitoring Station (CMS) with personal computer with latest processor and monitor of suitable size.(b) UPS with two hours backup(c) Colour Laser Printer(e) Data Gateway(f) SCADA software |
| 3 | Supplying, Installation, Testing and commissioning of extendable, compartmentalised, front operated , back openable, LT cubicle STP panel having ingress protection of IP 54, suitable for operation on 415 Volt 3 phase 50 c/s power supply fabricated out of 2mm thick CRCA sheet steel and base channel of MS section not less than 100mm X 50mm X 5mm, gland plate of 3 mm thick cleanedand treated in 7 tank process and powder coated with approved shade with TPN Electrolytic Aluminiumbusbar of 100A duly insulated in colour coding & suitable to withstand 25 MVA fault lavel complete with supplying & installationof following equipment including interconnection, control wiringetc as required. All MCCBs shall have microprocessor based release & shall have manually operated handle.It includes all wiring , cabling of required sizes from STP panel board to each electrical parts with on site control panel for individual motors . The panel will consists ofItems as per drawings attached.(Panel shall be of outdoor type installation with suitable IP Protection)Complete LT cubicle STP panel having ingress protection of IP 54 to be provided as per the details given in Schedule \"A\" Part-I from page No 44 to 45 of CA. |
| 4 | Material and Labour for Construction of Block of Panel Room, Duty Room,Rest Room with Toilet & cum bath complete all as shown in drawings and asspecified , and directed by the Engineer in Charge. |
| 5 | Lumpsum price worked out by the contractor for EARTH WORK , SITE CLEARANCE AND DEVELOPMENT as listed in Schedule \"A\" Part-III. |
| 6 | Lumpsum price worked out by the contractor forNEW ROADS, REPAIR TO ROAD, HUME PIPE CULVERT & HARDSTANDING/PATH as listed in Schedule \"A\" Part-IV. |
| 7 | Lumpsum price worked out by the contractor forSEWAGE DISPOSAL as listed in Schedule \"A\" Part-V. |
| 8 | Lumpsum price worked out by the contractor for AREA DRAINAGE as listed in Schedule \"A\" Part-VI. |
| 9 | Lumpsum price worked out by the contractor forFencing & Gate as listed in Schedule \"A\" Part-VII. |
| 10 | Lumpsum price worked out by the contractor forEXTERNAL ELECTRIC SUPPLY as listed in Schedule \"A\" Part-VIII. |
| 11 | Lumpsum price worked out by the contractor for WATER SUPPLY as listed in Schedule \"A\" Part-IX. |
| 12 | Material and Labour for Painting Line, Dashes, Arrow, Letters etc on road pavement of new/old black top surface road surface and applying one coat of retro reflective thermoplastic road marking paint 2mm thick & width not exc 10 cm for longer durability with 8% glass beads using special applicator machine fitted with profile shoe heater driven by experianced operator on road surfaces on andincluding preparation of new or old black topsurfaces of road , cleaning surfaces of all dirt, scales, oils, grease & foreign materials etc complete all as specified and directed by Engineer in charge with heating arrangement upto 160 degree celcius. Paint material shall be conforming to ministry of surface transport (MOST) specification 803.4 Vol -I as laid down in specification of Road / Bridge work \" third revision\" ; complete all as specified and directed by the Engineer In Charge. |
| 13 | Supply,layingand testing of150 mm inner diameter of double wall corrugated (DWC) high density polyethylene pipes (HDPE) and stiffness classes-8 (SN-8)with ISI marked (with CML no) with and including all fitting & jointing materialfor sewage line and laid in trenches as specified in IS-16098 (Part-2) : 2013 and as per manufacturer\"s instructions complete allas specified and as directed. |
| 14 | Supply,layingand testing of200 mm inner diameter of double wall corrugated (DWC) high density polyethylene pipes (HDPE) and stiffness classes-8 (SN-8)with ISI marked (with CML no) with and including all fitting & jointing materialfor sewage line and laid in trenches as specified in IS-16098 (Part-2) : 2013 and as per manufacturer\"s instructions complete allas specified and as directed. |
| 15 | Supply,layingand testing of100 mm inner diameter of double wall corrugated (DWC) high density polyethylene pipes (HDPE) and stiffness classes-8 (SN-8)with ISI marked (with CML no) with and including all fitting & jointing materialfor sewage line and laid in trenches as specified in IS-16098 (Part-2) : 2013 and as per manufacturer\"s instructions complete allas specified and as directed.Note Serial Item No. 13 to 15 :- Bedding of pipe shall not be provided in normal condition and CONSTRUCTION METHODS shall be strictly compiledas per clause no A-4 of ANNEX \"A\" of IS 16098 (Part-2) : 2013. |
| 16 | Materail & Labour for100mm thick 560mm dia precast RCC factory made circular Manhole Cover set in cement mortar 1:6 complete all as specified anddirected by the Engineer-in-charge. |
| 17 | Materail & Labour for100mm thick 900mm dia precast RCC factory made circular Manhole Cover set in cement mortar 1:6 complete all as specified anddirected by the Engineer-in-charge. |
| 18 | Material and labour for Preparing of new concretesurfaces of any description over 10cm width or girth and applying two coats of Epoxy coated Paint over a coat of primer ; complete all as specified anddirected by the Engineer-in-charge. |
| 19 | Material and Labour for Construction of Wet Well cum equalization Tank as per drawing no. ICC/MBR/01 Dt 25/11/2024, ARCH/WW/01 dt 07/10/2023 sh 1/2 to 2/2 , asspecified and as directed by the Engineer in Charge. |
| 20 | Material and Labour for Construction of Sump RCC Tank as per drg no. ICC/MBR/01 Dt 25/11/2024, asspecified and as directed by the Engineer in Charge. |
| 21 | Material and Labour for Construction of Oil & Grease Trap as per drg no. ICC/ARCH/OGT/01 Dt 25/11/2024 , asspecified and as directed by the Engineer in Charge. |
| 22 | Material & labour for disconnecting all type of cable & electric connections , earthing of exting transformer , and taking down the same transformer of capacity upto 100 KVA as per requirement from 2Pole or4Pole structure carefully & safely and shifting the transformer by transporting with crane & mannul labour safely , place the transformer on existing platform and making all type of cable & electric connections at newshifted place , and installing complete connecting with electrical system, earthing, testing and startup the electric supply complete all asdirected by the Engineer-in-charge.Note :-The rates quoted by the contractor for this item includes all type of Tool,Plants,crane, lorry, labour etc required for taking down and shifting of the transformer within the cantonment campus and making connections & installation complete and nothing extra shall be paid. |
| 23 | Material & labour for Earthing complete with galvanized steel earth plate electrode 600mm x 600mm x 6mm thickness , buried directly in ground (earth pit not less than 2.25 metresdeep below the normal ground level ) with top edge of plate not less than 1.5 metres below the normal ground level connected to galvanized iron strip 32mm x 6mm by means of nuts bolts, washers, check nuts of GI steel all as shown in electric plate no 3 of SSR -2009 Part I, all as specified and indicated complete and including charcoal dust, salt etc and GI protection pipe medium grade 40mm and GI watering pipe 20mm light grade with funnel and wire mesh,40mm thick pre-cast RCC M-15 (nominal mix) cover reinforced with XPM weight not less than 4 kg /sqm with suitable handle of 6mm dia MS bar and angle iron 40x40x3mm frame for cover,PCC M-15 (nominal Mix) pit , earth work in any type of soil and connected all as specified and as directed.Notes :-(i) Up to 7.5metres length of pipe of 40 mm dia and GIstrip shall be deemed to be included in unit rate quoted by the tenderer(ii) Resistance of earthing should be less than 1 Ohms failing which the contractor will do the earthing again to achieve the desired result i.e. less than1 ohms(iii) In case soil is not suitable same is to be replaced with good quality clay soil to achieve the desired result of less than 1 ohms(iv) Quoted rate shall be deemed to be inclusive for the above aspect |
| 24 | Material & labour for earthing complete with galvanized steel earth plate electrode 600mm x 600mm x 6mm thickness , buried directly in ground (earth pit not less than 2.25 metresdeep below the normal ground level ) with top edge of plate not less than 1.5 metres below the normal ground level connected to galvanized iron wire 4mm dia by means of nuts bolts, washers, check nuts of GI steel all as shown in electric plate no 3 of SSR -2009 Part I, all as specified and indicated complete and including charcoal dust, salt etc and GI protection pipe medium grade 40mm and GI watering pipe 20mm light grade with funnel and wire mesh,40mm thick pre-cast RCC M-15 (nominal mix) cover reinforced with XPM weight not less than 4 kg /sqm with suitable handle of 6mm dia MS bar and angle iron 40mmx40mmx3mm frame for cover,PCC M-15 (nominal Mix) pit , earth work in any type of soil and connected all as specified and as directed.Notes :-(i) Up to 7.5metres length of pipe of 40 mm dia and GIearth wireshall be deemed to be included in unit rate quoted by the tenderer(ii) Resistance of earthing should be less than 1 Ohms failing which the contractor will do the earthing again to achieve the desired result i.e. less than1 ohms(iii) In case soil is not suitable same is to be replaced with good quality clay soil to achieve the desired result of less than 1 ohms(iv) Quoted rate shall be deemed to be inclusive for the above aspect |
| 25 | Supply and fixing in replacement for FRP weather proof cable juction box of size 300mm x 200mm x 105mm includingaluminium bus barof capacity 63Amps 04 Nos with 02 Nos MS clamps of flat 40mm x 6mm of suitable size complete with nuts and bolts and making connections with cable and including thimbles of suitable size complete all as specified and as directed by Engineer-in-charge. |
| 26 | Supply and fixingin replacement for street light bracket of 1.5 metres length made out of 40mm dia GI pipe medium grade bend to shape at 120 degree and welded at required end fixed with MS flat iron clamp bolts, nuts and washers includingpainting MS clamp with one primer coat and two coat of aluminium paint and bracket fixed to poles or walls complete all as specified and as directed by Engineer-in-charge. |
| 27 | Supply and layingin replacement forPVC insulated and sheathed with copper conductor cable of size1.5 Sqmm 3 core, 1100 volt fixed in position from junction box to street light fitting connector with fixing arrangements on wall/ RCC/Steel tubular poles complete all as specified and as directed by Engineer -in-charge. |
| 28 | Material & Labourfor construction of platform of size 3000mm x 2500mm x 1200mm for transformer, complete all as specified and shown on drawing No CEPZ/C-TD/002/13 Sheet 2/5 , using under mentioned specifications :- (i) PCC (1:4:8) type D2in foundation using 40mm graded stone aggregate.(ii) Brick work with cement mortar (1:4) using Sub class \"B\" Bricks. (iii) 15 mm thick rendering to exposed surface of bricks in CM (1:4). (iv) 100mm thick PCC 1:2:4 type B1using 40mm graded stone aggregate at top portion of platform.(v) Two Coats of white wash on plastered surfaces. (vi) Mild Steel work ( i.e. MS jali/fencing/MS angle ) on the top of platform around transformer up to height of 90omm.(vii) Earth work (Excavation,Return filling & Removal) in any type of Soil. |
| 29 | Supply ,Installation ,Testing & commisioning of totally enclosedfeeder piller indoor type (IP-65) fabricated out of 3.15mm thick CRCA sheet dust and vermin proof powdercoated double door type (independent cabin including locking arrangementforeach MCCBs, bus bar chamber (enclosed) including locking arrangement complete suitable for operating on 415 Volt50 Hz AC, with internally wired with copper conductor , TPN bus bar of aluminium strip (4 Nos) insulated by heat shrinkable sleaves & clips on shrouds for joints busbar shall be designed to withstand a fault lavel at 415 Volts having legs 45cms made out of 65mm x 65mm x 6mm angle iron grouted on brick masonary plateform upto 30Cms . Brick masonary plateform shall be 60 Cms abovethe Ground Level . The panel shall be front operated with cable entry from the bottem with cable glands. The fault with standing capacity shall be 25 KA including Earth bus shall be part of the main feeder pillar . The Feeder Piller Box panel shall be CPRI approved , width of the panel not less than 600mm and Comprising & includingof the under mentioned accessories:- (a) MCCB 4 pole, 200 A, 415 volt 50HZwith thermal setting 70% to 100% and rupturing capacity not less than 25 KA - 01 No (for Incoming).(b) MCCB 3 pole, 200 A, 415 volt 50HZ with thermal setting 70% to 100% and rupturing capacity not less than 16 KA - 01 No(Out going for distribution LT panel).(c) MCCB 3 pole, 200 A, 415 volt 50HZ with thermal setting 70% to 100% and rupturing capacity not less than 25 KA - 01 No(spare ).(d) Digital Ammeter 0 to 500 Amp with selector switch & suitable range of CTs - 01 No .(e) Digital Voltmeter 0 to 500 V with selector switch - 01 No.(f) LED Phase indicating lamp (Set of three)- 03 Nos (RYB)Note:- Platform Shall be constructed using following specifications :- (i) PCC (1:4:8) type D2in foundation using 40mm graded stone aggregate. (ii) Brick work with cement mortar (1:6) using Sub class \"B\" Bricks. (iii) 15 mm thick rendering to exposed surface cement mortar (1:4).(iv) 100mm thick PCC 1:2:4 type B1using 40mm graded stone aggregate at top portion ofplatform. (v) Two Coats of white wash on plastered surfaces. (vi) Earth work (Excavation,Return filling & Removal) in any type of Soil. |
| 30 | Supply ,Installation ,Testing & commisioning of totally enclosedfeeder piller indoor type (IP-65) fabricated out of 3.15mm thick CRCA sheet dust and vermin proof powdercoated double door type (independent cabin including locking arrangementforeach MCCBs, bus bar chamber (enclosed) including locking arrangement complete suitable for operating on 415 Volt50 Hz AC, with internally wired with copper conductor , TPN bus bar of aluminium strip (4 Nos) insulated by heat shrinkable sleaves & clips on shrouds for joints busbar shall be designed to withstand a fault lavel at 415 Volts having legs 45cms made out of 65mm x 65mm x 6mm angle iron grouted on brick masonary plateform upto 30Cms . Brick masonary plateform shall be 60 Cms abovethe Ground Level . The panel shall be front operated with cable entry from the bottem with cable glands. The fault with standing capacity shall be 25 KA including Earth bus shall be part of the main feeder pillar . The Feeder Piller Box panel shall be CPRI approved , width of the panel not less than 600mm and Comprising & includingof the under mentioned accessories:- (a) MCCB 4 pole, 200 A, 415 volt 50HZwith thermal setting 70% to 100% and rupturing capacity not less than 25 KA - 01 No (for Incoming).(b) MCCB 3 pole, 63 A, 415 volt 50HZ with thermal setting 70% to 100% and rupturing capacity not less than 16 KA - 03 No(Out going for STP No 1,2 & 3).(c) MCB SPN 32 amps- 01 No(For building ).(d) Digital Ammeter 0 to 500 Amp with selector switch & suitable range of CTs - 01 No .(e) Digital Voltmeter 0 to 500 V with selector switch - 01 No.(f) LED Phase indicating lamp (Set of three)- 03 Nos (RYB)Note:- Platform Shall be constructed using following specifications :- (i) PCC (1:4:8) type D2in foundation using 40mm graded stone aggregate. (ii) Brick work with cement mortar (1:6) using Sub class \"B\" Bricks. (iii) 15 mm thick rendering to exposed surface cement mortar (1:4).(iv) 100mm thick PCC 1:2:4 type B1using 40mm graded stone aggregate at top portion ofplatform. (v) Two Coats of white wash on plastered surfaces. (vi) Earth work (Excavation,Return filling & Removal) in any type of Soil. |
| 31 | Material and labour for construction of masonary valve pit chamber ofsize 900mm x 900mm x 900mm (Internal dimension) complete all as specified using under mentioned specifications and shown on drawing No CEPZ/C-TD/006/13 Sheet 1/1 dated 11-09-2013 :- (i) Earth work (Excavation,Return filling & Removal) in any type of Soil.(ii)PCC (1:4:8) type D2 in foundation using 40mm graded stone aggregate.(iii)Brick work with cement mortar (1:4) using Sub class \"B\" Bricks. (iv) 15mm thick rendering to internal surfaces of chamberin CM(1:4).(v) 15 mm thick rendering to external surface of chamber upto 150mm below GL in CM(1:4)(vi) 50mm thick PCC (1:4:8) type D2 ain sub base of floor 40mm graded stone aggregate.(vii) 50mm thick floor in PCC 1:2:4 type B1 using 20mm graded stone aggregate surfaces finished even & smooth without using extra cement.(viii) Two Coats of white wash on all exposed internal & external surfaces.(ix) Mild Steel sheet cover not less than 6mm thick withangle iron frame size 50mmx50mmx6mm with locking arrangement.(x) Painting to steel surfaces internally externally with two coats of synthetic enamel painting over a coat of the red oxide primer. |
| 32 | Material and labour for construction of masonary valve pit chamber ofsize 600mm x 600mm x 750mm (Internal dimension) complete all as specified using under mentioned specifications and shown on drawing No CEPZ/C-TD/006/13 Sheet 1/1 dated 11-09-2013 :- (i) Earth work (Excavation,Return filling & Removal) in any type of Soil.(ii)PCC (1:4:8) type D2 in foundation using 40mm graded stone aggregate.(iii)Brick work with cement mortar (1:4) using Sub class \"B\" Bricks. (iv) 15mm thick rendering to internal surfaces of chamberin CM(1:4).(v) 15 mm thick rendering to external surface of chamber upto 150mm below GL in CM(1:4)(vi) 50mm thick PCC (1:4:8) type D2 ain sub base of floor 40mm graded stone aggregate.(vii) 50mm thick floor in PCC 1:2:4 type B1 using 20mm graded stone aggregate surfaces finished even & smooth without using extra cement.(viii) Two Coats of white wash on all exposed internal & external surfaces.(ix) Mild Steel sheet cover not less than 6mm thick withangle iron frame size 50mmx50mmx6mm with locking arrangement.(x) Painting to steel surfaces internally externally with two coats of synthetic enamel painting over a coat of the red oxide primer. |
| 33 | Supply, installation, commissioning and testing of ECO friendly diesel engine driven, water cooled generating set of capacity 82.5 KVA/66 KW , 415 volts, AC supply, 50 HZ, 3 phase 4 wire, 0.8 PFat NTP, speed 1500 RPM mounted on common base plate with flexible coupling and meeting the requiements of IS-4722/BIS -5514 specificaiton with CPCBIV+ approved accoustic enclousres fabricated out CRCA sheet 1.6mm thick and structual sheet metal base frame. Sound proofing of enclouser is done with high quality foam conforiming to IS 8183 of 25 mm thickness and density 30 Kg /M3 complete including PCC foundation in all respect complete as per manufactures recommendations:-(a) Diesel Engine : Water cooled diesel engine of adequate capacity at 1500 RPM generally in accordance with latest BIS/IS specifacition , self starting including 01 x 12 volts maintenance free battery of suitable capacity ,charging dynamo/alternator ,air cleaner , diesel/oil filters complete in all respect . The engine shall be capable to take 10% extra overload for one hour for every 12 hours of running confirming to the enviroment (protection act 1986) (29 of 1986) and as amended vide Gazette of India Notificaitons Part -II Section -III sub Section (I) dated 12 Jul 2004.(b) Engine Instructions Panel : All relevant information shall be displayed on a complete panel for easy monitoring of lubricant ,oil pressure, battery charging,ammeter, hours meter ,starting switch etc.(c) Fuel tank: In built fuel tank of adequate capacity with stop cock ,drain plug and necessary fuel pipe complete as per manufactures recommendaitons . |
| 34 | Item No.33(Contd...)(d) Alternator- : 82.5 KVA / 66 KW at NTP , 3 phase ,50 HZ ,415 volts ,AC supply ,0.8 PF at 1500 RPM , this shall be self excited screen protected and drip proof type bruchless ,confirming to relevant IS/BIS code as per latest manufacturing schedule . CONTROL PANEL :-The standard control panel shall be built in acoustic enclosures with the following accessories complete wired with suitable size of copper cables.(i) MCCB /MCB TPN of suitable rating with overload and short circuit protection.(ii) Digital ammeter(iii) Digital voltmeter(iv) One set of indicating LED lamps RYB and fuse (v) Frequency meter, RPM meter, Hour meter, fuel level indicator(vi) KWH meter electronic tamper proof digital for 3 phase 415 volts AC unbalanced load of suitable capacity (vii) Water temprature & oil pressure gauge.AMF :- The panelon microprocessor based type shall be with AMF(ATS) controller suitable to start the engine on main failure after 10-15 second delay and to switch off engine only after 60-90 seconds after the main supply restored. The AMF controller shall have under/ over voltage, overload protection, coolant temp cut off, fuel control upto 10% tank capacity. The panel shall also have one automatic change over switch of suitable capacity to bypass main supply when the AMF control becomes defective.Note :-The gen set must be affixed with label meeting the following requirements (The label shall be durable and legible) :- (i) Name and address of the engine manufacturer(ii) Statement that this engine conforms to the environment protection(iii)Type and approval certificate number(iv) Date of manufacture of Gen set |
| 35 | Item No.33(Contd...)(f) ACCOUSTIC ENCLOSURE: Accoustic enclosure is made out of CRCA sheet of 1.6mm and ISMC base frame painted. The walls of enclosures will be insulated with rockwool so to canopy with 75 db(A) at 1mtrs sound leveled by ministry of environment and forest. The wall of enclosure will be insulated as per manufacturer\"s recommendatios with the following:-(i) Fitting arrangment(ii) Point for neutral and body earthing(iii) Lub oil drainage(iv) Air breather (v) Hood or rain protection (vi) Easy stop push button(vii) Panel meter viewing window (viii) Tube light fitting of suitable wattageNote :-(a) DG set should be sound proof as perlatest policy.(b) First filling of Engine Oil and fuel etc should be arranged by the contractor. (c) There shall be proper air circulation and glass window in the acoustic enclosures suitable located to read the meters of various control form outside. (d) Necessary overload test shall be carried out in the presence of testing officer nominated by Accepting Officer. (e) Shifting of DG set from factory to work site by means of truck/ crane is deemed included in quoted rates. (f) Platform for DG set shall be as per OEM recommendations and rates for construction of PCC plateform deemed included in quoted rates. (g) Contractor shall submit the CPCBIV+ compliance report/ certificate of DG set, BIS certificate for diesel engine, wiring diagram to the department alongwith, manufacturer test report etc. |
| 36 | Manning & Operation of theSTP & SCADA (of capacity 100 KLD as per srl item No 1 & 2 of this BOQ)for 11 months { PHASE - IIrefer Sch \"A\" note no.2.1(b) } ,after completion of STP & SCADA. Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage waterpump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all holidays all as specified and directed by Engr-in-Charge. Note : - Contractor shall deploy one skilled operator (FGM) and one helper per shiftforthree shifts per day in each month for operation of each STP. |
| 37 | Manning & Operation of theSTP & SCADA (of capacity 100 KLD as per srl item No 1 & 2 of this BOQ)for 11 months after completion of Phase-II { Phase-III refer Sch \"A\" note no.2.1(c) } complete.Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage waterpump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all holidays all as specified and directed by Engr-in-Charge. Note : - Contractor shall deploy one skilled operator (FGM) and one helper per shiftforthree shifts per day in each month for operation of each STP. |
| 38 | Manning & Operation of theSTP & SCADA (of capacity 100 KLD as per srl item No 1 & 2 of this BOQ)for 11 months after completion of Phase-IV { Phase- V refer Sch \"A\" note no.2.1(e) } complete.Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage waterpump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all holidays all as specified and directed by Engr-in-Charge. Note : - Contractor shall deploy one skilled operator (FGM) and one helper per shiftforthree shifts per day in each month for operation of each STP. |
| 39 | Manning & Operation of theSTP & SCADA (of capacity 100 KLD as per srl item No 1 & 2 of this BOQ)for 11 months after completion of Phase-VI { Phase-VII refer Sch \"A\" note no.2.1(g) } complete.Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage waterpump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all holidays all as specified and directed by Engr-in-Charge. Note : - Contractor shall deploy one skilled operator (FGM) and one helper per shiftforthree shifts per day in each month for operation of each STP. |
| 40 | Manning & Operation of theSTP & SCADA (of capacity 100 KLD as per srl item No 1 & 2 of this BOQ)for 11 months after completion of Phase-VIII { Phase-IX refer Sch \"A\" note no.2.1(j) } complete.Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage waterpump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all holidays all as specified and directed by Engr-in-Charge. Note : - Contractor shall deploy one skilled operator (FGM) and one helper per shiftforthree shifts per day in each month for operation of each STP. |
| 41 | Manning & Operation of theSTP & SCADA (of capacity 100 KLD as per srl item No 1 & 2 of this BOQ)for 05 months after completion of Phase-IX { Phase- X refer Sch \"A\" note no.2.1(k) } complete.Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage waterpump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all holidays all as specified and directed by Engr-in-Charge. Note : - Contractor shall deploy one skilled operator (FGM) and one helper per shiftforthree shifts per day in each month for operation of each STP. |
| 42 | Notes for Serial Item No. 34 to 39 above :- (i)The FGMs employed by the contractor shall be ITI qualified from recognised institute having sufficient knowledge and experience i.e. minimum 02 years in maintenance / operation of similar work. The operators must be competent to carry out the repairs / maintenance of plant as required. (ii) The operators shall maintain the desired quality treated water including tracing out and rectification of minor leakages in pipe line / valves during the period. (iii)The operators shall operate elctrical equipements, pumps and maintain the STP in workable condition by checking daily leakages noise, cleaning the plant and its surrounding areas of plant as directed. (iv) The Contractor shall maintain all registers, log books,under various rules, and shall be produced to the Engineer-in-Charge as well as officers detailed by central labour department. (v) The unit rate quoted shall be deemed to be included for cost of labour for daily for daily routine maintenance for trouble free functioning of installation. (vi) The quoted rate shall be deemed to be inclusive all consumables required for operation of STP.(vii) The payment to the staff employed shall be made within first week of every month through online mode in employees respective Bank Account. No payment to contractors / firms will be made unless proof of payment of wages / EPF / ESI etc through bank account is submitted by the contractor to all employees. Contractor shall produce details of payment made to the employees along with supporting documents for the verification of Engineer-in-Charge for processing the monthly / finall bills. In case of revision in pay slab by Government during the currency of contract, same shall be paid to the employee by the contractor and accordingly rates shall be quoted.(viii) The contracor should follow the terms & conditions of E-in-C\"s br policy no 10/2023 issued vide letter No A/95533/SCADA Sewage/Pol/E2W (PPC) dt 21 Jul 2023 .(ix) Necessary spare & manpower will be provides by Contractor. (x) Desired water quality as per standard norms comply with E-in-C\"s branch direction to be achieved. |
| 43 | Comprehensive maintenance of the above STP & SCADA (of capacity 100 KLD as per srl item No 1 to 3 of this BOQ){ Phase - IV refer Sch \"A\" note no.2.1(d) } ,for the period of 1styears after expiry of Defect Liability Period. The scope of comprehensive maintenance includes maintenance of complete infrastructure under this work and replacing all defective components and restoring any defect / deformity / wear and tear and comprehensive maintenance of all STP components under this job, (Sl item No. 1.00 to 3.00) including all connected LT cubicle STP panel , all pumps and DG Sets in the scope of entire tender for further period of 12 Monthsafter completion defect liability period. The scope shall also include comprehensive maintenance of all electrical & Sewage Pumps items such as main switch, starter, change over switch, MCCB, voltmeter, anmeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc, as per manufacturers instructions and as specified and directede by Engineer-in-Charge. |
| 44 | Comprehensive maintenance of the above STP & SCADA (of capacity 100 KLD as per srl item No 1 to 3 of this BOQ) { Phase - VI refer Sch \"A\" note no.2.1(f) } ,for the period of 2nd years after expiry of first year of Defect Liability Period. The scope of comprehensive maintenance includes maintenance of complete infrastructure under this work and replacing all defective components and restoring any defect / deformity / wear and tear and comprehensive maintenance of all STP components under this job, (Sl item No. 1.00 to 3.00) including all connected LT cubicle STP panel , all pumps and DG Sets in the scope of entire tender for further period of 12 Months after completion defect liability period. The scope shall also include comprehensive maintenance of all electrical & Sewage Pumps items such as main switch, starter, change over switch, MCCB, voltmeter, anmeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc, as per manufacturers instructions and as specified and directede by Engr-in-Charge. |
| 45 | Comprehensive maintenance of the above STP & SCADA (of capacity 100 KLD as per srl item No 1 to 3 of this BOQ) { Phase - VIII refer Sch \"A\" note no.2.1(h) } ,for the period of 3rdyears after expiry of second year of Defect Liability Period. The scope of comprehensive maintenance includes maintenance of complete infrastructure under this work and replacing all defective components and restoring any defect / deformity / wear and tear and comprehensive maintenance of all STP components under this job, (Sl item No. 1.00 to 3.00) including all connected LT cubicle STP panel , all pumps and DG Sets in the scope of entire tender for further period of 12 Months after completion defect liability period. The scope shall also include comprehensive maintenance of all electrical & Sewage Pumps items such as main switch, starter, change over switch, MCCB, voltmeter, anmeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc, as per manufacturers instructions and as specified and directede by Engr-in-Charge. |
| 46 | Notes for Serial Item No. 40 to 42above :- (a) Comprehensive maintenance includes replacement of all defective/ worn out / damaged parts including MBR membrane with new parts and nothing extra shall be paid on this account except the payment specified in this item. (b) The contractor shall be responsible for periodic maintenance as per maintenance schedule and specified including renewal/ replacement of parts, lubricants, fittings / fixtures filling of bacteria etc required for smooth functioning of the plant as per manufacturers instructions. (c) The rate quoted shall be deemed to be inclusive of safety gear & required tools for maintenance. (d) The quoted rate is deemed to be inclusive of tool & testing instruments required for operation & maintenance of STP plant.(e) The sludge cakes procured after treatment shall become contractors property and shall be removed from premises of STP as early as possible. The rate shall be quoted accordingly. |
| 47 | Note: The Schedule of credit has been attached in tender in Pdf formate and amount of credit schedule i.eRs.79700.00 shall be deducted from the total amount of BOQ to arrive at the contract sum. |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |