| 1 | Material and labour for taking down from existing foundation/pump base and Opening of3 phase, 440 Volt squirrel cage induction motor of450 kw capacity, 1486 rpm ofKirloskar Make or cutting/removing the existing burnt winding and rewinding by using super enameled copper winding wire of existing wire gauge including other allied items such as varnish tape, sleeve, greasing, bearing, bushes etc of suitable size, including necessary repairing of rotor shafts if required with testing and commissioning complete all as specified and directed. Note:- Rates deemed to be included for decoupled and coupling pump with motor, the cost of transportation charges for carrying the motor/pumpfrom site to workshop and back, Nothing extra shall be admissible. |
| 2 | Material and labour for taking down from existing foundation/pump base and Opening of3 phase, 440 Volt squirrel cage induction motor of 75 kw capacity, 1486 rpm of Kirloskar Make or cutting/removing the existing burnt winding and rewinding by using super enameled copper winding wire of existing wire gauge including other allied items such as varnish tape, sleeve, greasing, bearing, bushes etc of suitable size, including necessary repairing of rotor shafts if required with testing and commissioning complete all as specified and directed. Note:- Rates deemed to be included for decoupled and coupling pump with motor, the cost of transportation charges for carrying the motor/pumpfrom site to workshop and back, Nothing extra shall be admissible. |
| 3 | Material and labour for Lifting out Vertical Mounted, Heavy duty MainPump, BHR50R-2STG-SWL type capacity of 450 KW Cast iron body, Make Kirloskar, including connected pipe connection/delivery lines, nuts, bolts, washer etc for repair/replacement of unserviceable spare parts including transportation to the workshop and re-installing the same after repair work & testing all as specified and as directed. |
| 4 | Material and labour for Lifting out Vertical Mounted, Heavy duty Jockey Pump, VEP21C-6STG-SWL type capacity of75 KW Cast iron body, Make of Kirloskar, including connected pipe connection/delivery lines, nuts, bolts, washer etc for repair/replacement of unserviceable spare parts including transportation to the workshop and re-installing the same after repair work & testing all as specified and as directed. |
| 5 | Material and labour for Complete Overhauling of Heavy duty MainPump, BHR50R-2STG-SWL type capacity of 450 KW Cast iron body, Make Kirloskar, for general inspection of impeller, shaft all bearings and sleeves, and re-installation of Pump after replacing all sleeves, bearings, seals and with SS nut bolts, metalizing the shafts and re threading bottom plate by lathe work including body repairs, welding works and complete testingall as specified and as directed. |
| 6 | Material and labour for Complete Overhauling of Heavy duty Jockey Pump, VEP21C-6STG-SWL type capacity of75 KW Cast iron body, Make of Kirloskar for general inspection of impeller, shaft all bearings and sleeves, and re-installation of Pump after replacing all sleeves, bearings, seals and with SS nut bolts, metalizing the shafts and re threading bottom plate by lathe work including body repairs, welding works and complete testingall as specified and as directed. |
| 7 | Supply and fixin repair of Flexible couplingsuitable for BHR50R-2STG-SWL type capacity of 450 KWvertical mounted pump complete all as specified and directed by Engr-in-charge. Make- wilo mather platt |
| 8 | Supply and fixin repair of expansion bellows 350 mm dia MOC SS316 L rating PN16 single expansion joint suitable for 24Kg/Sqcm complete all as specified and directed by Engr-in-charge. Make- wilo mather platt |
| 9 | Supply and fixin repair of expansion bellows 150 mm dia MOC SS316 L rating PN16 single expansion joint suitable for 24Kg/Sqcm complete all as specified and directed by Engr-in-charge. Make- wilo mather platt |
| 10 | Repairs and maintenance, testing of motorised butterfly valves 450 mm dia, PN16 including actuator of 220 VAC, 50 Hz IP 67 and 200 Watt motor complete all as specified and directed by Engr-in-charge |
| 11 | Repairs and maintenance, testing of motorised butterfly valves 200 mm dia, PN16 including actuator of 220 VAC, 50 Hz IP 67 complete all as specified and directed by Engr-in-charge |
| 12 | Supply and fixin repair of NRV 450 mm dia MOC SS316 L rating PN16 suitable for 24Kg/Sqcm complete all as specified and directed by Engr-in-charge. |
| 13 | Supply and fixin repair of NRV 200 mm dia MOC SS316 L rating PN16 suitable for 24Kg/Sqcm complete all as specified and directed by Engr-in-charge. |
| 14 | Material and labour for taking down sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H ,cutting/removing the existing burnt winding and rewinding by using super enameled copper winding wire of existing wire gauge including other allied items such as varnish tape, sleeve, greasing, bearing, bushes etc of suitable size, including necessary repairing of rotor shafts if required with testing and commissioning complete all as specified and directed. Note:- Rates deemed to be included for decoupled and coupling pump with motor, the cost of transportation charges for carrying the motor/pumpfrom site to workshop and back, Nothing extra shall be admissible. |
| 15 | Material and labour for replacement of Impeller - SS304 for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 16 | Material and labour for replacement of Ball Bearing Set (Upper & Lower Side) for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 17 | Material and labour for replacement of Mechanical seal set (Upper & Lower Side) for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 18 | Material and labour for replacement of O Ring Set for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 19 | Material and labour for replacement of MCB-TP-10kA With Aux, Contact 25A Schneider/Mitsubishi for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 20 | Material and labour for replacement of Control MCB-SP-10KA 6A Schneider/Mitsubishi for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 21 | Material and labour for replacement of Power Contactor (AC3 Duty) (415V) (Main) 18A Schneider/Mitsubishi for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 22 | Material and labour for replacement of Over Load Relay 9-13A Schneider/Mitsubishi for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 23 | Material and labour for replacement of Programmable Controller 24V DC GIC/Reputed for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 24 | Material and labour for replacement of Single Phasing Preventer 415V Multispan/Selec for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 25 | Material and labour for replacement of Ampere Meter (Analog) (72X72) 20A Rishabh/Meco/Selec for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 26 | Material and labour for replacement of Volt Meter (Analog) (72X72) 0-500V Rishabh/Meco/Selec for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 27 | Material and labour for replacement of Volt Selector Switch 6A,Rotary Salzer for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 28 | Material and labour for replacement of Winding Protection Relay (WPR) 415V Minilec/Selec for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 29 | Material and labour for replacement of Moisture Control Relay (MCR) 415V Minilec/Selec for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 30 | Material and labour for replacement of A/M Selector Switch 6A,Rotary Salzer for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 31 | Material and labour for replacement of SMPS 24V DC Lubi/Reputed for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 32 | Material and labour for replacement of Electronic Hooter 230V Reputed for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 33 | Material and labour for replacement of Control Relay 230V Salzer for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 34 | Material and labour for replacement of Toggle Switch (By Pass Win & Mois) 6A SUN for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 35 | Repairs, Flushing (As & When required),Inspection & Maintenance of HDPE Pipe in drainage system loop, 100 mm diameter, PN 10, PE 100 grade of sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 36 | Repairs, Flushing (As & When required),Inspection & Maintenance of HDPE Pipe in drainage system loop, 75 mm diameter, PN 10, PE 100 grade of sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 37 | Repairs and maintenance, testing of Cam lock Coupling, 100 mm diameter,MOC - SS 316 for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 38 | Material and labour for replacement of (supply, installation, testing & commissioning) of Camlock coupling, 100 mm diameter, MOC - SS 316,alongwith necessary fittings like gaskets, nut bolts & washers for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 39 | Repairs and maintenance, testing of Swing check valves, 100 mm diameter, Make - M/s. Samson, MOC - SS 316, Swing type, PN 16 for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 40 | Material and labour for replacement of (supply, installation, testing & commissioning) of Swing check valves, 100 mm diameter, Make - M/s. Samson, MOC - SS 316, Swing type, PN 16 along with necessary fittings like gaskets, nut bolts & washers for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 41 | Repairs and maintenance, testing of Ball valves, 100 mm diameter, class 150, PN 16, Make - M/s. Samson, MOC - SS 316 for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 42 | Material and labour for replacement of (supply, installation, testing & commissioning) of Ball valves, 100 mm diameter, class 150, PN 16 Make - M/s. Samson, MOC - SS 316,alongwith necessary fittings like gaskets, nut bolts & washers for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 43 | Repairs and maintenance including calibration of digital water Ultrasonic level sensors, 4-20 mA with all necessary components for proper operation and the cable which includes the wires, cleaning of sensor heads, software calibrations, test signals etc for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 44 | Material and labour for replacement of (supply, installation, testing & commissioning) of Ultrasonic level sensors,4-20 mA with all necessary components for proper operation and the cable which includes the wires PVC conduits, saddles,Bends,Accessories etc for sewage submersible pump 4 Lps, 20 Mtr Model PST 7.5H complete all as specified and directed by Engr-in-charge |
| 45 | Material and labour for taking down drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M ,cutting/removing the existing burnt winding and rewinding by using super enameled copper winding wire of existing wire gauge including other allied items such as varnish tape, sleeve, greasing, bearing, bushes etc of suitable size, including necessary repairing of rotor shafts if required with testing and commissioning complete all as specified and directed. Note:- Rates deemed to be included for decoupled and coupling pump with motor, the cost of transportation charges for carrying the motor/pumpfrom site to workshop and back, Nothing extra shall be admissible. |
| 46 | Material and labour for replacement of Impeller - SS304 for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 47 | Material and labour for replacement of Ball Bearing Set (Upper & Lower Side) for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 48 | Material and labour for replacement of Mechanical seal set (Upper & Lower Side) for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 49 | Material and labour for replacement of O Ring Set for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 50 | Material and labour for replacement of MCB-TP-10kA With Aux, Contact 20A Schneider/Mitsubishi for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 51 | Material and labour for replacement of Control MCB-SP-10KA 6A Schneider/Mitsubishi for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 52 | Material and labour for replacement of Power Contactor (AC3 Duty) (415V) (Main) 12A Schneider/Mitsubishi for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 53 | Material and labour for replacement of Over Load Relay 7-10A Schneider/Mitsubishi for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 54 | Material and labour for replacement of Programmable Controller 24V DC GIC/Reputed for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 55 | Material and labour for replacement of Single Phasing Preventer 415V Multispan/Selec for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 56 | Material and labour for replacement of Ampere Meter (Analog) (72X72) 20A Rishabh/Meco/Selec for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 57 | Material and labour for replacement of Volt Meter (Analog) (72X72) 0-500V Rishabh/Meco/Selec for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 58 | Material and labour for replacement of Volt Selector Switch 6A,Rotary Salzer for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 59 | Material and labour for replacement of Winding Protection Relay (WPR) 415V Minilec/Selec for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 60 | Material and labour for replacement of Moisture Control Relay (MCR) 415V Minilec/Selec for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 61 | Material and labour for replacement of A/M Selector Switch 6A,Rotary Salzer for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 62 | Material and labour for replacement of SMPS 24V DC Lubi/Reputed for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 63 | Material and labour for replacement of Control Relay 230V Salzer for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 64 | Material and labour for replacement of Toggle Switch (By Pass Win & Mois) 6A SUN for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 65 | Repairs and maintenance, Flushing (As & When required),Inspection & Maintenance of HDPE Pipe in drainage system loop, 100 mm diameter, PN 10, PE 100 grade complete all as specified and directed by Engr-in-charge |
| 66 | Repairs and maintenance, Flushing (As & When required),Inspection & Maintenance of HDPE Pipe in drainage system loop, 75 mm diameter, PN 10, PE 100 grade complete all as specified and directed by Engr-in-charge |
| 67 | Repairs and maintenance, testing of Swing check valves, 75 mm diameter, Make - M/s. Samson, MOC - SS 316, Swing type, PN 16 for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 68 | Material and labour for replacement of(supply, installation, testing & commissioning) of Swing check valves, 75 mm diameter, Make - M/s. Samson, MOC - SS 316, Swing type, PN 16 along with necessary fittings like gaskets, nut bolts & washers. for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 69 | Repairs and maintenance, testing of Ball valves, 75 mm diameter, class 150, PN 16, Make - M/s. Samson, MOC - SS 316for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 70 | Material and labour for replacement of(supply, installation, testing & commissioning) of Ball valves, 75 mm diameter, class 150, PN 16 Make - M/s. Samson, MOC - SS 316,alongwith necessary fittings like gaskets, nut bolts & washers for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 71 | Material and labour for replacement of (supply, installation, testing & commissioning) of Swing check valves, 100 mm diameter, Make - M/s. Samson, MOC - SS 316, Swing type, PN 16 along with necessary fittings like gaskets, nut bolts & washers for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 72 | Repairs and maintenance, testing of Ball valves, 100 mm diameter, class 150, PN 16, Make - M/s. Samson, MOC - SS 316 for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 73 | Material and labour for replacement of (supply, installation, testing & commissioning) of Ball valves, 100 mm diameter, class 150, PN 16 Make - M/s. Samson, MOC - SS 316,alongwith necessary fittings like gaskets, nut bolts & washers for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 74 | Repairs and maintenance including calibration of digital water Ultrasonic level sensors, 4-20 mA with all necessary components for proper operation and the cable which includes the wires, cleaning of sensor heads, software calibrations, test signals etc for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 75 | Material and labour for replacement of (supply, installation, testing & commissioning) of Ultrasonic level sensors,4-20 mA with all necessary components for proper operation and the cable which includes the wires PVC conduits, saddles,Bends,Accessories etc for drainage submersible pump 2.5 Lps, 20 Mtr Model PST 5.0M complete all as specified and directed by Engr-in-charge |
| 76 | Material and labour for taking down progressive cavitypump 8 Lps, 35 Mtrs head ,cutting/removing the existing burnt winding and rewinding by using super enameled copper winding wire of existing wire gauge including other allied items such as varnish tape, sleeve, greasing, bearing, bushes etc of suitable size, including necessary repairing of rotor shafts if required with testing and commissioning complete all as specified and directed. Note:- Rates deemed to be included for decoupled and coupling pump with motor, the cost of transportation charges for carrying the motor/pumpfrom site to workshop and back, Nothing extra shall be admissible. |
| 77 | Material and labour for taking down progressive cavitypump 8 Lps, 42 Mtrs head ,cutting/removing the existing burnt winding and rewinding by using super enameled copper winding wire of existing wire gauge including other allied items such as varnish tape, sleeve, greasing, bearing, bushes etc of suitable size, including necessary repairing of rotor shafts if required with testing and commissioning complete all as specified and directed. Note:- Rates deemed to be included for decoupled and coupling pump with motor, the cost of transportation charges for carrying the motor/pumpfrom site to workshop and back, Nothing extra shall be admissible. |
| 78 | Material and labour for replacement of Protector for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 79 | Material and labour for replacement of Head pin (Threaded Pin) for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 80 | Material and labour for replacement of Coupling rod for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 81 | Material and labour for replacement of Shaft head for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 82 | Material and labour for replacement of Pin for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 83 | Material and labour for replacement of Stator for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 84 | Material and labour for replacement of Sleeve ring for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 85 | Material and labour for replacement of Oil retainer for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 86 | Material and labour for replacement of Bearing No. Taper roller for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 87 | Material and labour for replacement of Deflector for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 88 | Material and labour for replacement of Oil seal Size for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 89 | Material and labour for replacement of Gear Oil for gear box for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 90 | Material and labour for replacement of MCB-TP-10kA With Aux, Contact 25A Schneider/Mitsubishi for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 91 | Material and labour for replacement of Control MCB-SP-10KA 6A Schneider/Mitsubishi for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 92 | Material and labour for replacement of Power Contactor (AC3 Duty) (415V) (Main) 18A Schneider/Mitsubishi for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 93 | Material and labour for replacement of Over Load Relay 9-13A Schneider/Mitsubishi for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 94 | Material and labour for replacement of Programmable Controller 24V DC GIC/Reputed for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 95 | Material and labour for replacement of Single Phasing Preventer 415V Multispan/Selec for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 96 | Material and labour for replacement of Ampere Meter (Analog) (72X72) 20A Rishabh/Meco/Selec for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 97 | Material and labour for replacement of Volt Meter (Analog) (72X72) 0-500V Rishabh/Meco/Selec for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 98 | Material and labour for replacement of Volt Selector Switch 6A,Rotary Salzer for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 99 | Material and labour for replacement of Winding Protection Relay (WPR) 415V Minilec/Selec for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 100 | Material and labour for replacement of Moisture Control Relay (MCR) 415V Minilec/Selec for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 101 | Material and labour for replacement of A/M Selector Switch 6A,Rotary Salzer for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 102 | Material and labour for replacement of SMPS 24V DC Lubi/Reputed for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 103 | Material and labour for replacement of Electronic Hooter 230V Reputed for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 104 | Material and labour for replacement of Control Relay 230V Salzer for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 105 | Material and labour for replacement of Toggle Switch (By Pass Win & Mois) 6A SUN for progressive cavitypump 8 Lps, 35 Mtrs head/8 Lps, 42 Mtrs head complete all as specified and directed by Engr-in-charge |
| 106 | S&F in repair, Duct Iron pipe dia of 450 mm having screwed flanged end, including necessary fitting such as minimum 3 mm thickness flange rubber gasket, joint, bend, elbow, Nut bolts laying in tunnel complete all as specified and directed. |
| 107 | S&F in repair, Duct Iron pipe dia of 350 mm having screwed flanged end, including necessary fitting such as minimum 3 mm thickness flange rubber gasket, joint, bend, elbow, Nut bolts laying in tunnel complete all as specified and directed. |
| 108 | All as per item no 107.00 here-in-before but dia of 300 mm. |
| 109 | All as per item no 107.00 here-in-before but dia of 200 mm. |
| 110 | All as per item no 107.00 here-in-before but dia of 150 mm. |
| 111 | All as per item no 107.00 here-in-before but dia of 100 mm. |
| 112 | All as per item no 107.00 here-in-before but dia of 80 mm. |
| 113 | Material and labour for replacement ofgate valves of size 200 mm dia including all fittings complete all as specified and directed by Engr-in-charge |
| 114 | Material and labour for replacement ofmotorised butterfly valves 450 mm dia, PN16 including actuator of 220 VAC, 50 Hz IP 67 and 200 Watt motor complete all as specified and directed by Engr-in-charge |