| 1 | Dismantling of stone flagged or interlocking tiled floor including stacking of material as directed by E/IC within distance of 60 meters. (SI No. 697) |
| 2 | Dismantling of stone flagged or interlocking tiled floor including stacking of material as directed by E/IC within distance of 60 meters. (SI No. 697) |
| 3 | Cartage of ballast, Kankar, Coat, Grit or sand etc. including loading and unloading but excluding stacking on pucca roads.up to 8 Km distance |
| 4 | Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.10) |
| 5 | Supply and Laying Polythene over CC etc. all Complete |
| 6 | Class-150 (Non Modular) brick work in 1:4 cement and Fine sand mortar in including supply of all material, labor T&P etc. (Fine snad not less than in 1.25FM) S.No. 6.1.1A) |
| 7 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying including the cost of centering, shuttering, finishing and but excluding reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retarder for setting of concrete/improve workability without impairing strength and durability as per direction of engineer-in-charge. Note- cement concrete considered in this item is @ 330kg/cum. Excess or less cement used as per design mix is payable or recoverable separately up to plinth level. (New) |
| 8 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 cement : 4 Coarse sand. (Chapter No. 13 S.I. No.-582(ii)) |
| 9 | R.C.C. work with cement approved coarse sand and 2 cm (3/4) gauge approved stone ballast in the proportion 1:2:4 for slab work excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 BWGI binding wire and including necessary centering and shuttering etc. and also including supply of all materials labor and tools and plants etc. required for proper completion of the work. Strength of the concrete shall not be less than M-150. (SI No. 284) |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 11 | Raising & re-fixing of manhole including all material labor T&P etc. all complete. (NS) |
| 12 | Supply & fixing of R.C.C. manhole frame and cover including all complete. (NS) |
| 13 | Supply & Mixing 3.5 Kg and or as specified by the manufacture , hardener in tremix concrete per sqm. |
| 14 | Supply/Fixing of Black Granite Stone work display board. (NS) |
| 15 | Sub Total |
| 16 | Add/Deduction Rs. For Estimate Figure Amount Match |
| 17 | Grand Total Please Enable Macros to View BoQ information |